| 1 | Earth work by mechinical / manual means in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering,rollingeachlayer with ½ tonneroller or woodenor steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and for all lift: |
| 2 | All kinds of soil |
| 3 | Clearing jungleincludinguprootingof rank vegetation,grass,brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 4 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. |
| 5 | Felling trees of the girth (measured at a height of 1m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. |
| 6 | Beyond 30 cm girth upto and including 60 cm girth |
| 7 | Earth work in surface excavationnot exceeding 30 cm in depthbut exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lif upto 1.5 m, as directed by Engineer-in- Charge: |
| 8 | All kinds of soil |
| 9 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. |
| 10 | All kinds of soil |
| 11 | Banking excavated earth by mechanical / manual means in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 0.5 tonne roller, or wooden or steel ramnners, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and for all lift: |
| 12 | All kinds of soil |
| 13 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. |
| 14 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer- in-Charge. |
| 15 | With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 |
| 16 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. |
| 17 | Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : |
| 18 | 300 mm dia. R.C.C. pipe |
| 19 | Providing and laying in position specified grade of reinforced cement concrete,excludingthecostofcentering,shuttering,finishingand reinforcement - All work up to plinth level : |
| 20 | 1:2:4 (1cement : 2 coarse sand(zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 21 | 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 22 | 2.5 cm thick bitumastic sheet with hot bitumen of approved quality, using stone chippings (60% with 12.5 mm nominal size and 40% with 10 mm nominal size) @ 1.65 cum per 100 sqm and coarse sand @ 1.65 cum per 100 sqm of road surface and with bitumen @ 56 kg/cum of stone chippings and @ 128 kg/cum of sand over a tack coat with hot straight run bitumen, including consolidation with road roller of 8 to 10 tonne etc. complete. (tack coat to be paid separately): |
| 23 | With paving Asphalt grade VG - 30 |
| 24 | Providingand applyingtack coat usinghotstraight runbitumenof grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : |
| 25 | On W.B.M. @ 0.75 Kg / sqm |
| 26 | Carriage of earth by mechanical transport for an average lead of 1.00 km i/c loading, unloading and stacking at site complete as per direction Engineer-in-charge. |
| 27 | For an average lead of 1.00 Km |
| 28 | Sub Head: Construction of various type of box culvert at new proposed village road Udaygarh at Baratang.Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. |
| 29 | All kinds of soil |
| 30 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. |
| 31 | Providingandlayinginpositioncementconcreteof specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 32 | 1:4:8 (1Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 33 | 1:3:6 (1Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 34 | 1:2:4 (1cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 35 | Providing and laying in position specified grade of reinforced cement concrete,excludingthecostofcentering,shuttering,finishingand reinforcement - All work up to plinth level : |
| 36 | 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 37 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 38 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 39 | Foundations,footings,basesof columns,etc.formass concrete |
| 40 | Suspended floors,roofs,landings,balconies and access platform |
| 41 | Steelreinforcement forR.C.C.workincludingstraightening,cutting, bending, placing in position and binding all complete upto plinth level. |
| 42 | Thermo-Mechanically Treatedbars of gradeFe-500D or more. |
| 43 | 12 mm cement plaster of mix: |
| 44 | 1:4(1 cement: 4 fine sand) |
| 45 | Cement concrete flooring 1:2:4 (1cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. |
| 46 | 40 mm thick with 20 mm nominal size stone aggregate |
| 47 | Providing and fixingPVC pipe for weep hole in wallsetc. as per the direction of Engineer-in-chagre. |
| 48 | 65 mm dia. |
| 49 | Total of Quoted Amount (A) |
| 50 | 05 YEARS MAINTENANCE PROVISIONS |
| 51 | For 1st Year |
| 52 | For 2nd Year |
| 53 | For 3rd Year |
| 54 | For 4th Year |
| 55 | For 5th Year |
| 56 | Total of Maintanance Cost of (B) |
| 57 | Grand Total Of (A+B) |
| 58 | Total of A+B |