|
| 1 | Carriage of followings from ESC. BSR to pit site on kachcha pakka road including loading and unloading chagres at both ends, requird for proper completion of work, distance about to 60 Kms. |
| 2 | PCC Pole from E.S.C Bulandshahr to Site. |
| 3 | Carriage of All line Material from store to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. |
| 4 | Erection of Single support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 5 | Erection & Grouting of Double Pole including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 6 | Grouting of Single support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of cement, sand, brick ballast/stone ballast, etc. required for proper completion of work. |
| 7 | Laying, sagging. Stringing and binding and jumpering of ACSR Weasel conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 8 | Laying, sagging. Stringing and binding and jumpering of ACSR Rabbit conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 9 | Fixing of Stay rod with Stay wire in proper way with Nozelling. |
| 10 | Grouting of Stay rods . |
| 11 | Guarding of 11 K V line at road crossing by laying 3 Nos. Gl wire of size 6/10 SWG parallel and fixing of lacings (Tilli) at a distance at 1.5 mtr as per direction of supervising engineer/RESPO mannual it. Includes the cost of labour,T&P carrier etc. required lor proper completing of work. |
| 12 | Resagging of loose and bad sag of L.T./H.T. line. |
| 13 | Repairing of Old Guarding 11 KV line at road crossings |
| 14 | Chopping of Tree branches.. |
| 15 | Tightening of Stay |
| 16 | Change of broken/Damaged/Missing following Items: - |
| 17 | Pin Insulator |
| 18 | Disc Insulator |
| 19 | Nut & Bolt off size |
| 20 | Bended X-Arm/Angle/Channel |
| 21 | Alignment of PCC/STP Pole |
| 22 | D.P. Clamp |
| 23 | Making of Plinth of the Damaged/Broken STP of the welded 03 Nos. Angle Iron piece with the Pole. |
| 24 | The following material is required to be supplied by the contractor: - |
| 25 | F clamp |
| 26 | LT clamp |
| 27 | LT Insulator |
| 28 | Double pole clamp. |
| 29 | Holding clamp |
| 30 | Nut & Bolt off size |
| 31 | X Arm clamp |
| 32 | All work will be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |