Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | M & L for taking up incl dismantling, reassembling, transporting and lowering of sewage submersible motor & submersible pump of capacity 14 Mtr head and 73 KLH discharge single stage all as specified and directed by Engineer-in-Charge.Make of pump: CALAMA /SABAR/ KSB/BED FORD GARVIN/ KIRLOSKAR. Note 1 :- Crane for taking up & lowering of submersible motor & submersible pump set while repairing/rewinding will be arranged by the contractor and the rent for the same is included in the item rate.Note 2: Any component/partas mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 2 | Impeller. |
| 3 | mechanical oil seal |
| 4 | Water seal |
| 5 | Key for pump shaft (Each stage) |
| 6 | Dismantling, transporting and reassembling of sewage submersible motor after rewinding & replacement ofworn out parts mentioned below incl rewinding of submersible motor 10 HP of03 Phase, 415 voltswith super enamelled copper winding wire including varnishing for `F\" class superior quality of approved make , size & number of wire as per existing complete all as specified and directed.Note: Any component /part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 7 | Ball bearing for motor as per existing size (SKF/NBC) |
| 8 | M & L for taking up incl dismantling, reassembling, transporting and lowering of sewagesumersible motor & submersible pump of capacity 13 Mtr head and 48.3 KLH discharge single stage all as specified and directed .Make of pump: CALAMA /SABAR/ KSB/BED FORD GARVIN/ KIRLOSKAR. Note 1 :- Crane for taking up & lowering of submersible motor & submersible pump set while repairing/rewinding will be arranged by the contractor and the rent for the same is included in the item rate.Note 2: Any component/part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 9 | Impeller. |
| 10 | mechanical oilseal |
| 11 | Water seal |
| 12 | Key for pump shaft (Each stage) |
| 13 | M &L for dismantling, transporting and reassembling of sewage submersible motor after rewinding & replacement ofworn out parts mentioned below incl rewinding of submersible motor 5 HP of03 Phase, 415 voltswithsuper enamelled copper winding wire including varnishing for `F\" class superior quality of approved make , size & number of wire as per existing complete all as specified and directed.Note: Any component/part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 14 | Ball bearing for motor as per existing size (SKF/NBC) |
| 15 | M & L for taking up incl dismantling, reassembling, transporting and lowering of sewagesumersible motor & submersible pump of capacity 13 Mtr head and 42 Mtr Cubic per hours discharge single stageall as specified and directed.Make of pump: CALAMA /SABAR/ KSB/BED FORD GARVIN/ KIRLOSKAR. Note 1 :- Crane for taking up & lowering of submersible motor & submersible pump set while repairing/rewinding will be arranged by the contractor and the rent for the same is included in the item rate.Note 2: Any component/part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 16 | Impeller. |
| 17 | mechanical seal |
| 18 | Water seal |
| 19 | Key for pump shaft (Each stage) |
| 20 | M & L for dismantling, transporting and reassembling of sewage submersible motor after rewinding & replacement ofworn out parts mentioned below incl rewinding of submersible motor 7.5 HP of03 Phase, 415 voltswith super enamelled copper winding wire including varnishing for `F\" classsuperior quality of approved make , size & number of wire as per existing complete.Note: Any component /part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 21 | Ball bearing for motor as per existing size (SKF/NBC) |
| 22 | M & L for dismantling of existing defective induction motor of 7.5 HP capacity, 03 phase, 415 volts 50 HZ and makefrom the foundation, disconnecting the electric connecting coupling pulley, and taking out to work shop cutting down and removing existing burnt out copper windings, cleaning of slots and rewinding with super enamelled copper winding wire of suitable turn & gauge as per the original with proper insulation including varnishing,providing all high grade material and \" varnish for insulation with new bearing & re-assembling the complete motor and re-fixing at original site with electric cable connection,earthing and testing the motor on full loas at site after coupling the pump for its serviceability upto the entire satisfaction of Engineer-in-charge.Note : Cost of super enamelled copper is included in the quoted rate & nothing shall be paid extra on this account. |
| 23 | M & L for dismantling opening and reassembling after repair /replacement of U/Sunder mentioned parts of centrifugal pump of capacity 7.5 HP.Job includes disconnection from base foundation frame disconnecting electrically, reconnection, re-fixing in position transportation to work shop & back make of pump :- Kirlosker/Crompton Greaves. Note: Any component/part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 24 | Gland Bush |
| 25 | Gland Cap CI with nut bolt |
| 26 | Ball bearing for 7.5 HP.Make - SKF. NBC. |
| 27 | Shaft sleeve Bronze |
| 28 | Shaft sleeve nut bronze |
| 29 | Set of gasket |
| 30 | Cast iron Impellor |
| 31 | Flexible Tyres coupling |
| 32 | Motor terminal plate |
| 33 | M & L for taking up incl dismantling, reassembling, transporting and lowering ofsumersible motor & submersible pump of capacity 15 Mtr head and 20.8 KLH discharge single stageall as specified and directed .Make of pump: CALAMA /SABAR/ KSB/BED FORD GARVIN/ KIRLOSKAR. Note 1 :- Crane for taking up & lowering of submersible motor & submersible pump set while repairing/rewinding will be arranged by the contractor and the rent for the same is included in the item rate.Note 2: Any component/part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 34 | Impeller. |
| 35 | mechanicaloil seal |
| 36 | Water seal |
| 37 | Key for pump shaft (Each stage) |
| 38 | M & L for dismantling, transporting and reassembling of submersible motor after rewinding & replacement ofworn out parts mentioned below incl rewinding of submersible motor 03 HP of03 Phase, 415 voltswith super enamelled copper winding wire including varnishing for `F\" classsuperior quality of approved make , size & number of wire as per existing complete.Note : Any component/part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 39 | Ball bearing for motor as per existing size (SKF/NBC) |
| 40 | M & L for taking down of defective induction motor of the following capacity and makefrom the foundation, disconnecting the electric connecting coupling pulley, and transporting to work shop cutting down and removing existing burnt out copper windings, cleaning of slots and rewinding with solidcopper conductor ( winding wire) complete including varnishing, drying, ovening, overhauling, greasing and fixing in the same position, making necessary electric connection and testing of induction motor complete all as specified and as directed . (a) 30 HP capacity, 03 phase, 415 volt 50 HZ |
| 41 | Ball bearing for motor(SKF/NBC) |
| 42 | M&L for taking out/dismantling of unserviceable Air Blower of any capacity & any make including transportation to civil workshop replacement of wornout components such as bearing as per existing size, compressor oil, rubber seal, repair to pump, welding, lath machine etc including reassembling installation, connecting and testing etc complete all as specified and directed.Note 1:- Bearing, Oil, Rubber seal shall be measured in separtely in relevant item.Note 2 : Any component/part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 43 | Bearing No. 6205 of Make :SKF/NBC |
| 44 | Bearing No 22308 of make : SKF/NBC |
| 45 | Rubber Seal for Air Blower of any capacity & any make |
| 46 | Engine Oil 20W40 |
| 47 | Fan belt for air blower induction motor suitable for Air Blower of any capacity & any make motor as per sample all as specified and directed . |
| 48 | Air filter as per sample |
| 49 | M & L for taking out carefully, after disconnecting electrical connections, complete assembly of non clog dry motor submersible pump set ofSTP ofcapacity 20.8 KLH , 3 phase,of make Kirloskar from sewage tank (about 10m deep); transporting the complete assembly to work shop, opening unserviceable parts, winding etc. andcarrying out repairs/replacement mentioned in the items here-in-below including replacement of mechanical seal, Reconnecting all the parts and transporting back to the site of work, reconnecting with electrical connections, installing testing & re-commissioning of the complete assembly. Complete all as specified and as directed . Notes : 1.Quoted rates are inclusive of minor spares like bolts, nuts, washers etc. 2) Major spares & seal will be measured and paid separately under respective items of Sch. |
| 50 | Rewinding the complete motor capacity 7.5 hp 3 phase with super enamelled copper winding wire including varnishing for `F\" class insulation, baking etc as directed . |
| 51 | mechanical oil seal of make Kirloskar Pumps. |
| 52 | Water seal |
| 53 | Angular ball bearingof make SKF / TATA (3308 A/C-3)or equivalent as directed by Engr-in-Charge |
| 54 | M &L for dismantling opening and reassembling after repair/replacement of U/S spare parts of mono block pumping set capacity 7.5 HP spare parts required shall be measured and paid separately. Job includes disconnection from base foundation frame disconnecting electrically, reconnection, re-fixing in position transportation to work shop & back complete all as specified and directed by Engr-in-chargeNote : Any component/part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 55 | Gland Bush |
| 56 | Gasket set manifold |
| 57 | S/SImpeller |
| 58 | S/S Pump shaft (single stage) |
| 59 | Description all as per item No 14 but of capacity 5 HP spare parts shall be measured and paid separately.Note : Any component/part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 60 | Gland Bush |
| 61 | Gasket set manifold |
| 62 | S/SImpeller |
| 63 | S/S Pump shaft (single stage) |
| 64 | Description all as per item No 14 but of capacity 3 HP spare parts shall be measured and paid separately.Note : Any component/part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 65 | Gland Bush |
| 66 | Gasket set manifold |
| 67 | Impeller |
| 68 | S/SPump shaft (single stage) |
| 69 | Description all as per item No 14 but of acpacity 1 HP spare parts shall be measured and paid separately.Note : Any component/part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 70 | Gland Bush |
| 71 | Gasket set manifold |
| 72 | Impeller |
| 73 | S/S Pump shaft (single stage) |
| 74 | M &L for dismantling of existing defective Monoblock Pumpset Motorof 3 HP capacity, 03 phase, 415 volts 50 HZ and makefrom the foundation, disconnecting the electric connectingand taking out to work shop cutting down and removing existing burnt out copper windings, cleaning of slots and rewinding with solidcopper conductor(winding wire)as existing size and gaugecomplete including varnishing, drying, ovening, overhauling, greasing and fixing in the same position, making necessary electric connection and testing of induction motor complete all as specified and directed . |
| 75 | M &L for dismantling of existing defective Centrifugal Pump Set Motor/Monoblock Pumpset Motorof 1 HP capacity, 03 phase, 415 volts 50 HZ and makefrom the foundation, disconnecting the electric connecting and taking out to work shop cutting down and removing existing burnt out copper windings, cleaning of slots and rewinding with solidcopper conductor(winding wire) as existing size and gaugecomplete including varnishing, drying, ovening, overhauling, greasing and fixing in the same position, making necessary electric connection and testing of induction motor complete all as specified and directed . |
| 76 | M &L for dismantling of existing defective Centrifugal Pump Set Motor/Monoblock Pumpset Motorof 7.5 HP capacity, 03 phase, 415 volts 50 HZ and makefrom the foundation, disconnecting the electric connecting and taking out to work shop cutting down and removing existing burnt out copper windings, cleaning of slots and rewinding with solidcopper conductor(winding wire)as existing size and gaugecomplete including varnishing, drying, ovening, overhauling, greasing and fixing in the same position, making necessary electric connection and testing of induction motor complete all as specified and directed . |
| 77 | M &L for dismantling of existing defective Centrifugal Pump Set Motor/Monoblock Pumpset Motorof 5 HP capacity, 03 phase, 415 volts 50 HZ and makefrom the foundation, disconnecting the electric connecting and taking out to work shop cutting down and removing existing burnt out copper windings, cleaning of slots and rewinding with solidcopper conductor(winding wire)as existing size and gaugecomplete including varnishing, drying, ovening, overhauling, greasing and fixing in the same position, making necessary electric connection and testing of induction motor complete all as specified and directed . |
| 78 | M &L for dewatering & Bailing out Raw Sewage and acraching the inner surface of open sewage collection tank with the help of wire brush, steel patti , emery paper and removing any silt,sludge,raw material of sewage from the well with the help of any T & P as required and trown it away 100 mtr from the STP complete all as specified and directed ..Note : (i) The rate of T & P requires for this item is included in this item and nothing shall be paid extra on this account.(ii) The rate of material & labour of wire brush,steel patti & emery paper requires for this item is included this item & nothing shall be paid extra on this account. (Note:- Periodicity of cleaning 6 months)(i) Region -I (KM Area) (ii) Umrao Old (iii) Umrao MAP(iv) 365 Spl Unit (Inside)(v) 365 Spl Unit(Outside)(vi) Longewala Complex (vii) Sewage Pump houses |
| 79 | M & L for Cleaning and removing of sludge from walls/floor of Equalization tank with the help of wire brush, steel patti , emery paper and removing any silt,sludge,raw material of sewage from the well with the help of any T & P as required and trown it away 100 mtr from theouter wall of STP & tblack bitumen paint to the wallsas directed by Engineer-in-Charge.Note : (i) The rate of T & P requires for this item is included in this item and nothing shall be paid extra on this account.(ii) The rate of material & labour of wire brush,steel patti & emery paper requires for this item is included this item & nothing shall be paid extra on this account. (iii)The rate ofblack bitumen paint to the walls alsoincluded this item & nothing shall be paid extra on this account. (Note:- Periodicity of cleaning 6 months)(i) Region -I (KM Area) (ii) Umrao Old (iii) Umrao MAP(iv) 365 Spl Unit (Inside)(v) 365 Spl Unit(Outside)(vi) Longewala Complex |
| 80 | M & L for Cleaning and removing and bailing out stagnated sewage or sludge and other any light particles from walls/floor with the helps of wire brushes,steel patti and emergy paper from MBBR/FAB reactor inner surface and taking out damaged and MBBR media without any damage and refilling it with old unbroken media with new meida alongwith cleaning of inner & outer surface of MS/SS pipe placed in MBBR & removing any sludge particle to the Entire satisfaction of Engineer-in-Charge.(Note:- Periodicity of cleaning 6 months)(i) Region -I (KM Area) (ii) Umrao Old (iii) Umrao MAP(iv) 365 Spl Unit (Inside)(v) 365 Spl Unit(Outside)(vi) Longewala Complex |
| 81 | M & L for Cleaning & removing of Sluge from walls/floor of tube settler tank after taking out the tube settler with help of wire brush/steel patti/emery paper and depositing where as directed by Engineer-in-charge at a distance of 100 mtr away from the outer wall of STP including taking out old rusted wire mesh of size 25 mm x 25 mm from tube settler media and cleaning the tube settler.After all cleaning fixing new wire mesh of same size with the tube settler and fixed in original position in the tube settler tank including two coats of painting to steel surfaces by using black bitumen paint to the walls is included in this item and nothing shall be paid extra on this account.(Note:- Periodicity of cleaning 6 months) (i) Region -I (KM Area) (ii) Umrao Old (iii) Umrao MAP(iv) 365 Spl Unit (Inside)(v) 365 Spl Unit(Outside)(vi) Longewala Complex |
| 82 | M & L for dismantling, opening complete Dual media filter installed at sewage treatment plant including taking out carefully filter media completely ofdifferent sizes, cleaning the filter walls, pipes and other accessories with wire brush, painting with one coat of red oxide paint and two coats of Bituminous black water proof paint inside dual media filter and with Synthetic Enamel Paint on external surface of existing colour shade, replace the media as per existing shape /size or as directed by Engr-in-Charge , assemble complete unit and testing, commissioning complete all as directed. Note :Filter sand media ie pebbles and filter sand will be measured and paid separately under relevent items. (Note:- Periodicity of cleaning 6 months)(i) Region -I (KM Area) (ii) Umrao MAP(iii) 365 Spl Unit (Inside)(iv)365 Spl Unit(Outside) |
| 83 | M &L for dismantling, opening complete Activated Carbon filter installed at sewage treatment plantincluding taking out carefully filter media completely ofdifferent sizes, cleaning the filter walls, pipes and other accessories with wire brush, painting with one coat of red oxide paint and two coats of Bituminous black water proof paintinside ACF Filterand with Synthetic Enamel Paint on external surface of existing colour shade, replace the media as per existing shape /size orcomplete all as specified and directed .(Note:- Periodicity of cleaning 06 months)(i) Region -I (KM Area) (ii) Umrao MAP(iii) 365 Spl Unit (Inside)(iv)365 Spl Unit(Outside) |
| 84 | M & L for Cleaning of treated water tank by de-sludging,scraping the bottom wall with the help of scrapper/wire iron brush removing all scales, craked earth, dirt, mud/slit algi, fungus and other foreign deposited materials and dewatering the left over water and taking them out complete and painting of one coat by liquid bleaching powder complete all as specified and directed .(Note:- Periodicity of cleaining 06 months)(i) Region -I (KM Area) (ii) Umrao Old (iii) Umrao MAP(iv) 365 Spl Unit (Inside)(v) 365 Spl Unit(Outside)(vi) Longewala Complex |
| 85 | M & L for taking out solid dry sewage waste from sludge drying bed and removing to a distance not exceeding 200 mtr from the outer edge of sewage treatment plant. & filling of new sand & new filter media complete all as specified and directed .(Note- Complete set of 6 beds) |
| 86 | M & L for filling/laying the layer of naturally rounded graded gravel(White/yellow/grey/brownish) free from clay,dirt,vegetable and other organic matter and should be hard,durable and superior quality of graded 50 mm first bottom layer of sludge bed in depth as per original pattern complete all as specified & directed. |
| 87 | M & L for filling/laying sand free from clay,dirt,vegetable and organic matter over the second layer of rounded graded gravel of sludge bed in depths as per original pattern complete all as specified & directed. |
| 88 | Supply & Toppingof MBBR media of recycled plastic carrier material complete all as specified and directed . (For MBBRTank) |
| 89 | M & L for painting of existing pipe all MS pipe lines at STP with decided colour of paint including arrow mark in the direction of flow complete all as specified and directed . |
| 90 | Supply & Fixing in replacement PVC Insulated sheathed 3 core submersible Round cable for sumserable pumps copper conductor cable (stranded) 1100 Volts grade of size 04 Sqmm complete all as specified and directed . |
| 91 | M & L for dismantling joints of flanged pipes in position including removing old rubber or fiber board from gaskets , nuts, boltsetcand S&F detachable joint complete with rubber ring and necessary nut,bolts and washers suitable for CI/GI pipe line complete all as specified and directed.150mm bore |
| 92 | 100mm bore |
| 93 | 80mm bore |
| 94 | 50mm bore |
| 95 | M & Lfor paintingexisting pumpset (with electric motor) and foundation with spray paint carefully after taking outthe pumpset & electric motor from foundation and assemble after painting as per approved tint complete all as specified and directed.Make of paint:ASIAN PAINTS / NEROLAC PAINTS / BERGER PAINTS / SHALIMAR PAINTS / JENSON & NICHOLSON PAINTS / ICI PAINT / DULUX. |
| 96 | M &L for detecting and repairing the water leakage (STP treated Water) laid uPVC/PVC/GI/HDPE/PPRpipeline as mentioned below including necessary excavation work,bailing out stagnated/muddy water all as directed.Note : (i) Contractor shall depute labour/pipe fitter and other requirements such as JCB/Tractor and fuel etc. to attend the leakage / complaint on daily basis as per complaint trace out.(ii) Complete site for attending the leakage shall not be handed over to contractor at a time.Site of leakage only handed over to the contractor on site requirements basis.(iii) Contractor/supervisor shall collect complaint of leakage from concerned JE as daily basis and shall complete the complaint on the same day.(iv) If the leakage found during the currency period of contract at the repaired location contractor shall repair again without any extra cost in terms of condition 46 of IAFW-2249 of General condition of contracts.(v) Contractor shall provide equipments like JCB/Tractor etc & fuel at his own cost and arrangement for rectifying the complaint as per site requirement and nothing extra shall be paid on this account.(vi) The cost of Excavation & Earth work is included in this item nothing extra shall be paid on this account.(vii)The Cost of new uPVC/PVC/GI/HDPE/PPR fittings & uPVC/PVC/GI/HDPE/PPRpipe of length 1 mtr of as mentioned below size along with necessary new CI/DI - (\"D\" Joint)connected fittings \"D\" jointincluded in this itemand nothing extra shall be paid on this account.(viii) Old pipe fittings shall not be used in this item.(a )UPVC/PVC/GI/HDPE/PPR Pipe 50 mm |
| 97 | (b) UPVC/PVC/GI/HDPE/PPRPipe 80 mm |
| 98 | (c) UPVC/PVC/GI/HDPE/PPRPipe 100 mm |
| 99 | (d) UPVC/PVC/GI/HDPE/PPR Pipe 150 mm |
| 100 | M & L for cutting/scrapping of grass,unwanted trees,plant,levelling of earth surfaces,filling of digs etc complete all as specified and directed. |
| 101 | supply & fixing,testing and commissioning ofnon clog 5HP ,three phase, sewage pump including lowering with crane into the sewage well complete all as specified and directed.make -KIRLOSKAR/CG/KSB. |
| 102 | supply & fixing,testing and commissioning ofnon clog 7.5HP, three phase,2900 RPM sewage pump including lowering with crane into the sewage well complete all as specified and directed.make -KIRLOSKAR/CG/KSB. |
| 103 | Supply & fixing in replacementof NRV CI flangedends ISI marked size 100mm bore with rubber or fibre board gasket includingnecessarynuts, bolts and washer complete all as specified and directed . |
| 104 | Supply and fixing in replacement of butter fly valve of size 100 mm bore complete all as specified and directed. |
| 105 | Supply and fixing in replacement of butter fly valve of size 150 mm bore complete all as specified and directed. |
| 106 | Supply and fixing in replacement of butter fly valve of size 80 mm bore complete all as specified and directed. |
| 107 | Supply and fixing in replacement of butter fly valve of size 50 mm borecomplete all as specified and directed. |
| 108 | M & L in replacement MS pipe medium grade of size 200mm bore in tank of STP\"s complete all as specified and directed. |
| 109 | M & L in replacement MS pipe medium grade of size 150mm bore in tank of STP\"s complete all as specified and directed. |
| 110 | M & L in replacement MS pipe medium grade of size 80mm bore in tank of STP\"s complete all as specified and directed. |
| 111 | Supply and fixing in replacement of the following spare parts of panels contactor MNX 18 - 25 Amp complete all as specified and directed. (Make : L&T/C&F/Legrand) |
| 112 | Supply and fixing in replacement of the following spare parts of panels contactor MNX 50 Amp complete all as specified and directed.(Make : L&T/C&F/Legrand) |
| 113 | Supply and fixing in replacement of Relay MN-2 as per sample complete all as specified and directed. |
| 114 | Taking out of UNSV analogue Amp meter and supply and fix new digital obrit panel mounted AC ammeter (0-300A) of size 96 X 96 sqmm flush mounted case three phase, calss 0.5 item code PAMEBRITA 32. Make:-AE/HPL |
| 115 | Taking down UNSV phase indicator lamp supply and fix new phase indicator lamp (red, yellow & blue) complete all as specified and directed . |
| 116 | Taking out of UNSV analogue volt meter and supply and fix new digital obrit panel mounted AC volt meter (0-500A) of size 96 X 96 sqmm flush mounted case three phase, calss 0.5 item code PAMEBRITA 32. Make:-AE/HPL |
| 117 | S&F electronic type single phasing preventer in existing panel boards (max 600v min 380v) three phase 415volts variation voltage 4% tripping time 2-5 sec max type VSP-1 complete all as specified and directed. Make:- L&T/Minilac/Siemens. |
| 118 | Supply and fixing in replacement of connector as per sample complete all as specified and directed. |
| 119 | Supply and fixing in replacement of panel lock as per sample complete all as specified and directed. |
| 120 | Taking out UNSV selector switch and supply and fixing three way OFF three phase new selector switch for AC ammeter/Volt meter 63 Amp complete all as specified and directed. Make:- Havells/HPL |
| 121 | S&F Push button ON/Off complete all as specified and directed. |
| 122 | M & L for dismantling of existing defective induction motor of 20 HP capacity, 03 phase, 415 volts 50 HZ and makefrom the foundation, disconnecting the electric connecting coupling pulley, and taking out to work shop cutting down and removing existing burnt out copper windings, cleaning of slots and rewinding with super enamelled copper winding wire of suitable turn & gauge as per the original with proper insulation including varnishing,providing all high grade material and \" varnish for insulation with new bearing & re-assembling the complete motor and re-fixing at original site with electric cable connection,earthing and testing the motor on full loas at site after coupling the pump for its serviceability upto the entire satisfaction complete all as specified and directed.Note : Cost of super enamelled copper is included in the quoted rate & nothing shall be paid extra on this acount. |
| 123 | M & L for dismantling opening and reassembling after repair /replacement of U/Sunder mentioned parts of centrifugal pump of capacity 20 HP.Job includes disconnection from base foundation frame disconnecting electrically, reconnection, re-fixing in position transportation to work shop & back make of pump :- Kirlosker/Crompton Greaves. Note: Any component/part as mentioned below required for theproper functionality of the equipments shall be measured & paid separetely & cost of fixing of the same is included in the quoted rate. |
| 124 | Gland Bush complete all as specified and directed. |
| 125 | Gland Cap CI with nut bolt complete all as specified and directed. |
| 126 | Ball bearing for 20 HP complete all as specified and directed..Make - SKF. NBC. |
| 127 | Shaft sleeve Bronze complete all as specified and directed. |
| 128 | Shaft sleeve nut bronze complete all as specified and directed. |
| 129 | Set of gasket complete all as specified and directed. |
| 130 | Flexible Tyres coupling complete all as specified and directed. |
| 131 | Disconnecting the LT panel of any size and cap and repair of complete panel by taking out the cable, bus bar, voltmtr,Amp mtr, including wiring and other minor parts, cleaning the complete accessories carefully.minor repair shall be rectified parts/accessories shall be cleaned properly and refixing the parts at it\"s original locations, checking and replace of the internal panel wiring with suitable size of wire and remove the carbon deposited inside the contect, cleaning all other spare parts all as directed by the engineer in charge and ressembled after repair/replacement of required parts. |
| 132 | Supply & fix in replacement MCCB 100 Amp capacity 4 pole breaking capacity 25 KA , thermal magnetic Fix type415 volts ,AC ,50Hzincluding making connections by using suitable size copper lugs/thimbles and crimping tool complete all as specified and directed.Make: -C&S cat No CS263 L&T/Havells/Crompton greaves |
| 133 | Supply & fix in replacement MCCB 200 Amp capacity 4 pole breaking capacity 25 KA at 415 voltsincluding making connections by using suitable size copper lugs/thimbles and crimping tool complete all as specified and directed. Make: - L&T/Havells/Crompton greaves |
| 134 | Supply & fix in replacement MCCB 250 Amp capacity 4 pole breaking capacity 25 KA at 415 voltsincluding making connections by using suitable size copper lugs/thimbles and crimping tool complete all as specified and directed.Make: - L&T/Havells/Crompton greaves |
| 135 | Supply & fix in replacement MCCB 63 Amp capacity 4 pole breaking capacity 16 KA , thermal magnetic Fix type415 volts ,AC ,50Hzincluding making connections by using suitable size copper lugs/thimbles and crimping tool ccomplete all as specified and directed.Make: -C&S/ L & T/ Havells/ Crompton greaves |
| 136 | S&F in replacement MCB suitable for 6 to 32 Amps, 240 Volt AC supply single pole and neutral with over load and short circuit protection having rupturing capacity not less than 10 KAof C-series, complete all as specified and directed. Make :- Legrand/ GE/ Seimens/L&T/Indo Asian/C&S/ABB/BCH |
| 137 | S&F in replacement MCB single pole, 240 volts of rating 6-32 Amps, breaking capacity of 10 KAof C-series, complete all as specified and directed. Make :- Schneider/ HPL/Legrand/ GE/ Seimens/L&T/Indo sian/C&S/Havells/BCH/ABB |
| 138 | S&F in replacement MCB suitable for 32 Amps, 415 Volt AC supply triple pole and neutral with over load and short circuit protection having rupturing capacity not less than 10 KAof C-seriescomplete all as specified and directed. Make :- Legrand/ GE/ Seimens/L&T/Indo Asian/C&S/ABB/BCH Note for item No 1 to 75 :-(i) All items considered in work for repair and maitenance at Mil Station Bikaner .no extra cost for repair /replacement any type of pipe/pump/motor and connected itemswill be given to contractor. (ii) All type of complaintsshall be rectified by the contractor within 24 hrs from the launch of complaint time through complaint slip/ teliphonically/messaging. If contractor fail to rectified the above said complaint in given time period then a penalty @ Rs 200/day will be recovered agaist the each job. Complete site cannot be handed over to contractor, site of complaint as per complaint received by user is only handed over to the contractor on site requirment basis.(iii) All T&P and vehicles for transpotation will be provide by contractor and no extra payment made out on this account. (iv) Contractor Shall provide required manpower with all required tools/equipments for attending emergency complaint for 24 hours no extra payment made out on this account. (v) Quoted rate deemed to be inclusive of all labour, equipment and T&P material/arrangment to attend the day to day maintenance complaint on daily basis .(vi) Contractor shall update daily executed work on daily basis with sign of user on complaint slip (maintaining work done register) to concern JE E/M for updating exact progress of contract agreement.(vii) Rates quoted by tenderer incl finding/tracing exact issue of daily complaint for any size of pipes, and after rectification same will be measured in as persite in as per job. During repair/maintenance site cleaning is required the rate for same inclusive in quoted rates.(viii) Old UNSV material recived against new laid pipe/pump/motors (All old unsv material any type) etc may transport and deposited to AGE E/M store yard by contractor as per directions of Engr-in-charge. (ix) Contractor should collect complaint slip on daily basis prior to 09:30 to 10:30 hrs without fail and deposite the same after rectification within time period of 12 hrs, if contractor fail to deposite complaint slip with occupant sign with date, then consider as delay in rectification period which leads to recovery as per Rs 200/day.(x) M&L for opening the gland cap from both side of centrifugal pumps/any typeand taking out the rusted gland dori completely and refilling the new gland dori with grease both side of pump and refixing the gland cap in same position as per requirement on site( as per complaint). (xi) contrector shall provide technically qualified/experiance person for fault attending within 8 hours if the supply/pump/motor is off load or break down more than 8 hours , a panelty at a rate of Rs. 5000/- per day shall be lavied and deducted from the contrector\"s payment.the contrector shall be provide/arrange alternate option for defective pump/motor of any capacity or make as per site for avoiding any failure in case repair/replacement of defective parts takes longer time in genuine condition. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail