| 1 | Excavating in Trenches not exc. 1.50 mtr wide and not exc. 1.50 mtr in depth, Taking Out and Laying of Cables, etc. and getting out in Soft/ Loose Soil, complete all as specified and as directed. |
| 2 | All as per item No 1.00 here in before but Excavation in trenchesexc. 1.5m wide and n. exe 3 mtr depth |
| 3 | Returning, Filling in, including Spreading, Levelling, Watering and Well Ramming in Layers not exc. 250mm in Soft/Loose Soil, complete all as specified and as directed. |
| 4 | Removing excavated Materials (Soils) not exc. 50.00 mtr and depositing where directed at a level not exc. 1.50 mtr above the Starting Point in Soil, complete all as specified and as directed. |
| 5 | M&L for Horizontal Boring for passing GI protection pipe up to80mm bore (dia), under road / foot path, not exc. 10.00 metre in a single length, complete all as specified and as directed. |
| 6 | M&L Sand Cushioning (dry) in Trenches for protection of UG Cables (below, above and around the UG Cable laid in Trenches) of 230mm Spread thick -ness and consolidated (punned) upto 180mm thickness, complete all as specified and as directed.(NOTE : For the purpose of Payment, Punned thick-ness of Sand Cushioning only shall be Measured and Paid for. |
| 7 | Supply & Laying or Fixing or Passing through Pipe, XLPE insulated, Armoured, Electric Power UG Cable (Heavy Duty) with Aluminium Conductor, 1100 Volt Grade, Nominal Cross-Sectional Area 150 sqmm 4 core and Testing, including Brass Compression Cable Gland, Terminal Lug, etc. complete all as specified and as directed. |
| 8 | All as per Item No. 7 above, but Nominal Cross-Sectional Area 95 Sqmm 3.5 Core. |
| 9 | All as per Item No. 7 above, but Nominal Cross-Sectional Area 10 Sqmm 4 Core. |
| 10 | Taking down/out unserviceable or serviceable LT UG Cables of nominal Cross Sectional Area 150 sqmm 4 core and Connections including Bricks, GI Pipes, etc. of any descriptions, laid in Trenches and/or fixing with Walls/Poles including Segregating of Serviceable Materials viz Bricks, Cables, GI Pipes, etc. and keep in Safe custody for re-use, complete all as specified and as directed. |
| 11 | Re-Laying/Fixing or Passing through Pipe, XLPE insulated, Armoured, Electric Power UG Cable (Heavy Duty) with Aluminium Conductor, 1100 Volt Grade, Nominal Cross-Sectional Area 150 Sqmm 4 core Core including Brass Compression Cable Gland, Terminal Lug, etc. complete all as specified and as directed. |
| 12 | M&L Straight Through (Heat shrink) Cable Joint Kit including Jointing Materials for making Joints of UG Electric Cable 1100 Volt Grade Heavy Duty with PVC/XLPE insulated Aluminium Stranded Conductor, Nominal Cross-Sectional area 10 Sqmm, 4 Core and testing complete all as specified and as directed. |
| 13 | All as per item no 12 above but of Nominal Cross-Sectional area exc. 95 Sqmm, 3½ Core and testing complete all as specified and as directed. |
| 14 | All as per item no 12 above but of Nominal Cross-Sectional area exc. 150 Sqmm 4 Core and testing complete all as specified and as directed. |
| 15 | M&L for cutting the road/hard standing and making good disturbed surface by using PCC type C2 (1:3:6) by using 20 graded stone aggregate for the fixing the pipe complete all as directed by the Engr-in-Charge at site. |
| 16 | Taking down/out unserviceable GI / HDPE/Polyethylene flexible pipes of any descriptions, laid in trenches and/or fixing with Walls/Poles complete all as specified and as directed. |
| 17 | S&F Galvanised Iron Pipe 80mm Bore (dia) ‘Light Grade’ for protection of UG Cable, laid in Floors/ Road Crossing, fixing to Pole with Mild Steel Clamps, Nuts, Bolts, etc., complete all as specified and as directed.Make : JINDAL/BANSAL/NTL. |
| 18 | M&L cement concrete PCC type C-2 (1 : 3 : 6) 40 mm graded stone aggregate for pole foundation including necessary form work and forming neat finish surfaces complete all as directed. |
| 19 | M&L cement concrete PCC type C-2 (1 : 2 : 4) 12.5mm graded stone aggregate for copping of pole for existing/new pole including necessary form work and forming neat finish surfaces complete all as directed. |
| 20 | Materials and Labour for rendering 8 mm thick, cement plaster, in cement mortar (1:4) mixed with water proofing compound as per manufactures instructions over and including 12 mm thick backing coat in cement mortar (1:4) on fair faces of brick work or concrete surface in walls, complete all as specified and directed.Note: - (Water proofing compound will be measured and paid separately) |