| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres All kinds of soil. |
| 2 | Providing & Laying of Stone Soling tightly hand packed including watering, ramming and all other carriages, complete job |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. |
| 6 | Supply and filling of nallah muck/RBM or second class stones as filter media behind abuts etc including proper consolidation and all other carriages, complete job. |
| 7 | Providing and laying of 75mm dia PVC pipe weap holes including all carraiges complete. |
| 8 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) |
| 9 | Carriage of materials by MT from source to site of work including loading unloading complete. |
| 10 | stone agg. And sand for an avg. lead of 10 Km |
| 11 | Providing and laying of 450 dia RCC spun pipes in proper position/ grade including cutting of road surface upto required depth, providing requisite cushion including carriage of all materials and pipes upto site of work complete. |
| 12 | Providing and laying of Khak bajri/Nallah mukh including spreading, watering, ramming, compacting with PRR of 8 to 10 Tonne capacity including carriage of the same from approved source upto site of work complete. |
| 13 | Supply, stacking, laying, spreading and compacting of graded stone aggregate of (63mm to 45mm size) WBM G-II in uniform thickness including rolling with PRR 8-10 capacity in stages to proper grade and camber applying and brooming requisite type of stone screenings 13.2mm size and binding material to fill up the interstices of coarse aggregate watering compacting to required density (finished work shall be paid) with all leads, lifts and carriages as involved from source up to site of work complete job. Please Enable Macros to View BoQ information |