| 1 | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.) for grading- IIMaterial |
| 2 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) |
| 3 | Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder (Average 150mm filling )to the design level by adding fresh approved soil and compacting it with appropriate equipment.) |
| 4 | Prime coat A. Prime coat (Providing and applying primmer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60kg/sqm using mechanical means.) (Including cost of testing of materials at site and laboratory as directed by the deptt.)(ii) With Bitumen Emulsion-CSS-1 (IS- 8887-2004) |
| 5 | Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Including cost of testing of materials at site and laboratory as directed by deptt.)(II) With Bitumen Emulsion CSS-1 (IS:8887-2004)(c)Granular Surfaces treated with primer |
| 6 | Tack Coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Including cost of testing of materials at site and laboratory as directed by deptt.)(II) With Bitumen Emulsion CSS-1 (IS:8887-2004)(a) Normal Bituminous Surface |
| 7 | Dense Graded Bituminous Macadam (70mm) (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H cl. no. 507. complete in all respect. (Including cost of testing of materials at site and laboratory as directed by the deptt.) (b) With rock dust as filler (refer table 500-9 of MoRT&H specification)(i) with 60/70 or VG-30 grade bitumen(ii) for Grading II (19 mm nominal size) |
| 8 | Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoR&TH cl. no.509. complete in all respect.(b). With rock dust as filler (refer table 500-9 of MoRT&H Specification) (I) with 60/70 or VG 30 - (ii) for Grading II (13 mm nominal Size)Note: DLP of 12 months is applicable for this item |
| 9 | Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000metres ,stacking serviceable materials and unserviceable materials separately.) |
| 10 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)IIBy Mechanical MeansA. Bituminous course |
| 11 | Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600:1 , cement concrete not to be less than 150kg/cum, optimum moisture content to be determined during the trial length construction, concrete strength not to be less than 10Mpa at 7 days, mixed ina batching plant, transported to the site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing andcuring.) (Including carriage up to initial lead of 5Km. from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant.) |
| 12 | Cement Concrete Pavement \"(A) Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mixed design, transported to the site, laid with a fixed form or slip form paver, spread , compacted and finished in a continuous operation includuing provision of contraction, expansion, construction and longitudinal joints, joint filler, seperation membrane, sealent primer, sealent joint , debonding strips dowel bar, tie rod, admixured as approved, curing compopund, finishing to lines and grades as per drawing. (Including carriage up to initial lead of 5Km. from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant.) Note: DLP of 12 months is applicable for this item |
| 13 | Plain/Reinforced cement concrete,in open foundation complete as per drawing and technical specification including steel shuttering formwork.\"PCC Grade M15 Note: DLP of 12 months is applicable for this item |
| 14 | Plain/Reinforced cement concrete,in open foundation complete as per drawing and technical specification including steel shuttering formwork.\"PCC Grade M20 Note: DLP of 12 months is applicable for this item |
| 15 | Plain/Reinforced cement concrete,in open foundation complete as per drawing and technical specification including steel shuttering formwork.\"PCC Grade M15 Note: DLP of 12 months is applicable for this item |
| 16 | Plain/Reinforced cement concrete,in open foundation complete as per drawing and technical specification including steel shuttering formwork.\"PCC Grade M15 Note: DLP of 12 months is applicable for this item |
| 17 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specificationsStone/BoulderNote: DLP of 12 months is applicable for this item |
| 18 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes and conforming to the MoRT&H specificationsNote: DLP of 12 months is applicable for this item |
| 19 | b. Providing and erecting Ministar Road Studs b) Two Way reflective (with butyl adhesive) with dimensions 68x 34x 9.8mm plastic body with 2x8 glass elements Note: DLP of 12 months is applicable for this item |
| 20 | Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand)(i) 90cm equilateral traingleNote: DLP of 12 months is applicable for this item |
| 21 | Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand)(ii) 60cm equilateral traingleNote: DLP of 12 months is applicable for this item |
| 22 | Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand)(iii) 60cm circularNote: DLP of 12 months is applicable for this item |
| 23 | Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand)(v) 60cmm x 45 cm rectangularNote: DLP of 12 months is applicable for this item |
| 24 | Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand)(vii) 90cm high octagonNote: DLP of 12 months is applicable for this item |
| 25 | RCC Drain with SLAB (varying height)Note: DLP of 12 months is applicable for this item |
| 26 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate,true to line and grade,tolurence of vertical RCC post not to exceed 1 in 500,centre to centre spacing between vertical post not to exceed 2000 mm,leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.Note: DLP of 12 months is applicable for this item |
| 27 | Filling Pot Holes and Patch repair with Bituminous Concrete, 40 mm - (Removal of failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base excavation as per clause 503, backfilling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to form a smooth continuous surface, as per all clause 3004.2 (ii) for Grading II |
| 28 | Patching of damaged concrete surface with polymer concrete and curing compounds,initiator and promoter,available in present formulations,to be applied as per instructions of manufacturer and as approved by the Engineer. |