| 1 | Earth work in surface excavation All kinds of soil not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete |
| 4 | Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut Granite stone slab of colour black, Cherry / Ruby red Area of slab over 0.50 sqm for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing of edges to give high gloss finish etc. complete at all levels. |
| 5 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). |
| 6 | Note-1: General Notes1.For their own interest, contractors are advised to inspect the site with prior permission before quoting their rates.3. All the samples of materials which are to be used shall be approved by the department in advance. 4. The contractor shall comply with the provision of the Payment of Wages act5. Rates quoted shall be inclusive of all cost of materials, labour, carriage, taxes, GST, labourcess, water charges, elctricity charges, signorage charges, wastages etc..6. Rates quoted shall be excluding the amount of EPFO and ESIC contributions. EPFO and ESIC contributions are reimbursableon production of valid proof of payment made by the contractor as per CPWD norms. |