| 1 | Construction of Compound Wall are RO Plant at Periyathalai |
| 2 | Earth work excavation for foundation in all soils and subsoils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and bailing out water wherever necessary and refilling the sides of foundation as per SS20B etc complete. |
| 3 | Cement concrete 1:4:8mix using 40mm gauge hand broken granite stone jelly for foundation including watering wherever nessary and laid in layers not more than 15cm thick completed etc, complete complying with standard specification and as directed. |
| 4 | Cement concrete 1:1.5:3 (One cement one and half sand and three hard broken stone) using 20 mm, gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges. centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams etc. shall be finished smooth with cement mortar 1:3 (one cement and three sand) 12 mm thick and with Kraft paper without claiming extra etc. as directed by the departmental officers complete complying with standard specification. The rate is including vibration charges. |
| 5 | Supplying and erecting centering for sides and soffits including supports and strutingupto 3.29m heights for plane surface in all floor with all cross wing with mild steel sheet including all cost and conveyance etc |
| 6 | Supplying, fabricating and placing in position mild steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification (MS rods or RTS bars will be supplied departmentally at section stores and cost will be recovered at issue rate). The binding wire shall be supplied by the Contractor. |
| 7 | Brick work in Cement Mortar 1:5 (One Cement and five sand) using country bricks ground moulded of size 23x11x7 Cm. For the following including curing, etc., complete complying with standard specification. For foundation and basement and super structure in Ground floor. |
| 8 | Plastering with Cement Mortar 1:5, 12 mm thick in all floors includingcuring etc., Complete complying with standard Specification. |
| 9 | Emulsionpaint two coats with Best PlasticEmulsionpaint paint including cost of all materials and all labour charges etc., completed |
| 10 | Cement concrete 1:4:8mix using 40mm gauge hand broken granite stone jelly for foundation including watering wherever nessary and laid in layers not more than 15cm thick completed etc, complete complying with standard specification and as directed. |
| 11 | Cement concrete 1:2:4mix using 20mm gauge hand broken granite stone jelly for foundation including watering wherever nessary and laid in layers not more than 15cm thick completed etc, complete complying with standard specification and as directed. |
| 12 | Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per (Mix -in - place method) . |
| 13 | Supplying and erecting centering for sides and soffits including supports and strutingupto 3.29m heights for plane surface in all floor with all cross wing with mild steel sheet including all cost and conveyance etc |
| 14 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |