| 1 | Sub head & detail of work |
| 2 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. Including Royallity Si No. 253 (a). from 5 K M cartage Including Compaction S.I NO-253(A) ,260(a),261(b),261(c) |
| 3 | SUPPY & LAYING OF 45 to 63 mm Stone ballast mixed with stone dust Consolidated coat is 10 cm as per P.W.D Specification |
| 4 | SUPPY & LAYING OF 22.4 to 53 mm Stone ballast mixed with stone dust Consolidated coat is 10 cm as per P.W.D Specification |
| 5 | M-150 BRICK WORK IN 1:4 ONE CEMENT & FOUR COARSE SAND OF 2.20 F.M. MORTAR.S.I. 305(A) |
| 6 | 12 mm Thick plaster with cement and fine sand of 1.25 fineness modules in 1:3 over brick work minimum thickness not to be less than 1cm. Including supply of all materials labour, tools and plants etc. required for proper completion of the work. S.I No.582. |
| 7 | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. |
| 8 | Supply and fixing of 80 mm thick Precast cement concerete I-Shape\" Interlocking paver blocks with top layer of minimum 8mm thickness having plan dimension 200x(160+120mm) of O.P. Cement, smooth high gloss finish, skid resistant; manufacture from rubber moulds through vibro-compression mechanism. The compressive strength of concrete paver block shall not be less than 30Mpa (M-30) and weight 5kg per No. confirming to IS: 15658-2006 including cost of material, labour , T & P etc reqired for proper completion of the work as directed by Engineer-in charge. but excluding interlocking cement tiles with the cost of tiles including supply & spreading of sand to required template as necessary required for proper completion of work. GRAY 20% |
| 9 | COLOUR 20% |
| 10 | P.C.C. 1:2:4 with 2 cm gauge stone grit instead of 4 cm. gauge stone ballast .S.I.No.279(a). |
| 11 | R.C.C. 1 : 1.5 : 3 with 2 cm gauge stone grit i/c all complete .S.I.No.283a |
| 12 | M S (TOR steel or plain)in plain work such as R.C.C or R.B work i/c bending full proper shape &supply of steel &its wastage bend, hooks, and authorised overllaping shall be measured and including cost of binding wire. S I NO 504. |
| 13 | Supply & Fixing Sign Bord Patiya Size 2/3 Including Fixing. |
| 14 | GST Please Enable Macros to View BoQ information |