| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. |
| 3 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Compaction Only) |
| 4 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause Specification no. 406. |
| 7 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. As per specification clause no. 502. (Rate including Emulsion SS-1) |
| 8 | Providing and laying Dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.(Gr-1) (Rates including VG 30) |
| 9 | Providing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.as per MoRTH specification clause No. 503 (Rate including bitumen VG-10) |
| 10 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Grading - II) (Rates including VG 30) |
| 11 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per specification clause no. 2100 |
| 12 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications clause no. 1500, 1700 & 2200 (M-20) |
| 13 | Supplying, Fitting and Placing HYSD bar Reinforcement in Sub Structure complete as per Drawing and Technical Specifications no. 1600, 2200 |
| 14 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications no. 1300, 2200. |
| 15 | Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications cluase no. 1300 & 2200 |
| 16 | Plastering with cement mortar (1:3 ) on brick work in sub-structure asper MORT&H specficatin clause no.1300 &2200. |
| 17 | Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per specification clause no. 2900 (1000 mm dia) |
| 18 | Lettering and painting of culvert and parapet etc. complete. |
| 19 | Reinforced cement concrete M-15 grade Kilometer Stone of standard design as per IRC:8 ,fixing in position including painting and printing etc. |
| 20 | Reinforced cement concrete M-15 grade Hectometer Stone of standard design as per IRC:8 ,fixing in position including painting and printing etc. |
| 21 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising glass beads on bitunimious surface.Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35-2015 The finished surface to be level, uniform and free from streaks and holes. |
| 22 | Road DelinatorDelineator: Supply & Fixing of M S Delineator made of Mild steel with pure polyester powder coating with the minimum thickness of powder coating of not less than 40 micron for protection against corrosion. The surface should be conceated so that there should not be any exposed surface without powder coating. Alternatively, these metal guide poles can be concealed with thermoplastic body. The posts shall have Ian ellipsoidal or circular design with the height of the pole shall be 800 to 900 mm above the ground with about 200 to 300 mm base which can be anchored onto the ground. Mild steeI Guide Poles shall conform to Type XI sheeting specifications as per IRC:67 and ASTM D4956 which would ensure to obtainI clear visibility of the road alignment during night time. The Retro reflective sheeting shall be tested for A certificate of having the sheeting tested for coefficient of retro reflection, daytime colour and luminance, shrinkage, flexibility, liner removal, adhesion, impact resistance, specular gloss and fungus resistance, 3 years outdoor weathering and its having passed these tests shall be obtained from International/Government Laboratory / Institute by the manufacturer of the sheeting and in case the certificate is obtained from international condition, it should also be obtained from Indian condition within 3 years of launching of product by the manufacture in abroad. Alternatively, a certificate conforming to ASTM Specification (D4956-09) on artificial accelerated weathering requirements from a reputed laboratory in India can be accepted provisionally. In such a situation, the Employer / Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years outdoor weathering of the sheeting as per IRC 67:2012 & Proof of the same Report shall be uploaded which quoting tender. The rate shall include all materials, labour, T&P, transportation, installation and incidentals all complete as per direction of the Engineer-in-Charge. |
| 23 | 6 m Span Cantilever Structure with 300 dia M S one vertical postSupply fixing and Erection of built-up cantilever structure of 6.00m span comprising of one vertical post of 6.00m high made up of 300mm NB heavy class M.S. pipe as vertical member welded with 10mm MS plate at top and 12mm MS plate at bottom. The horizontal truss shall comprise of 50mm dia heavy class MS pipe and 40 mm dia heavy MS pipe as bracing and 10mm MS plate at bottom for fixing to vertical post as per structure design and drawing with one coat of steel primer and two coats of synthetic enamel paint. The work includes construction of RCC foundation of 900X900 mm of required depth as per site condition for built up structure including earth work in excavation ,100mm thick lean concrete in 1:4:8 cement and coarse sand and 40mm gauge stone ballast RCC with hand mixing in 1:2:4 cement coarse sand and 20 mm stone grit including cost of reinforcement ,shuttering and cantering complete as per direction of E/I. |
| 24 | Providing & fixing of reflective signs with a corrosion resistant 4mm thick with 0.4 to 0.5 mm bothside aluminium skin aluminium composite panel face to be fully covered with High Intensity prismatic sheeting type IV as per IRC-67:2012 retro reflective sheeting with back frame MS angle of 35x35x5 mm. Legends, letters ,numerals and borders etc should be as per MoRTH specification No-801.3.7 .The sheeting shall have a pressure-sensitive adhesive of the aggressive- tack type requiring no heat , solvent other preparation for adhesion to a smooth clean surface, in a manner recommended by the sheeting manufacturer. The ACM (Aluminium Composite Materials)shall be fixed on the Back frame MS Angle with riveting.Micro prismatic type IV Retroreflective sheeting confirming to ASTM D4956-09 shall be Pressure fixed. The Retro reflective sheeting shall be tested for a certificate of having the sheeting tested for coefficient of retro reflection, daytime colour and luminance, shrinkage, flexibility, liner removal, adhesion, impact resistance, specular gloss and fungus resistance, 3 years outdoor weathering and its having passed these tests shall be obtained from International / Government Laboratory/ Institute by the manufacturer of the sheeting and incase thecertificate isobtained from international condition, it should also be obtained from Indian condition with in 3years of launching of product by the manufacture in abroad.Alternatively,a certificate conforming to ASTM Specification (D 4956-09) on artificial accelerated weathering requirements fromareputed laboratory in India can be accepted provisionally. In such a situation, the Employer / Client, if so desires, could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years outdoor weathering of thesheetingasper IRC67:2012&Proofof the same Reportshallbe up loaded which quoting tender. The rate shall include all materials, labour, T&P, transportation, installation and incidentals all complete as per direction of the Engineer-in-Charge |
| 25 | Reflective Raised Pavement Markers (Cat Eye/ Road Stud) Supply and fixing of raised pavement marker with Made of Plastic body of RPM/ Road Stud shall be moulded from ASA (Acrylic Styrene Acrylonitrite) or HIPS (High-Imoact Polystyrene) or Acryloniitrite Butadien Styrene (ABS) or Any other suitable material approved by the Engineer. The Marker shall support a load of 13,635 kg tested in accordance with ASTMD 4280.The Reflective panels shall consist of number of lenses contatning singleor dual prismatic cubes capable of providing total internal reflection of the light entring the lens face.Lenses shall be mouled of methyl methecrylate conforming to ASTMD788 of equivalent.The slop or retro-reflecting surfaceshallpreferablybe35+/-5degreetobase and the area of each retro-reflecting surface shall not be less than 13.00s q.cm. the marker height shall notb eless than 10mm and shallnotexceed 20mm &Width shall not exceed 130mm. The base of the marker shall be flat within 1.3 mm all road studs shall be legiblymarked with the name, tradeor other meansof identification of the manufacture. epoxy installations ,excess adhesive around the edge of the marker,excess adhesive on the pavement andadhesiveonthe exposedsurfacesof themarkersshall be immediately removed. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel , to the Engineer . In addition , a two year warranty for satisfactory in field performance of the finished roadmarkershallalsobegivenby thecontractor whocarriesout theworkof fixingof reflectiveroadmarkers. Incasethemarkersare displaced , damaged , getwornout or lose their reflectivitycompared tostipulatedstandards , the contractorwouldbe required to replaceall suchmarkers within15 daysof the intimation from the Engineer ,athisowncost.Therateshall includeallmaterials, labour,T&P, transportation, installation and incidentals all complete as per direction of the Engineer-in-Charge. |
| 26 | Providing and Fixing of New Reflective Sign Board, Reflective Caution Boards 90 cm Equilateral Tringle with Definition Plate Size (60cm X 60Cm), As per IRC 67. |
| 27 | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing(80x60mm) |
| 28 | Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert,maintennance og guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of Hectometr and kilometr stone, cutting of branches of tree, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stone, refixing of displaced guard stone ( (as per Mentioned in GO No. (as per Mentioned in GO No. 17 /2024/Sa-113/23-1-2024-23-1099/113/2023Dated 16.01.2024 and ENC letter 36890C/RMC/Mool-23-24 Dated 17.02.2024 . Maintence of 1st year after completion of work @ Zero % of total work amount of item 1 to 27. |
| 29 | Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert,maintennance og guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of Hectometr and kilometr stone, cutting of branches of tree, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stone, refixing of displaced guard stone (as per Mentioned in GO No. 17 /2024/Sa-113/23-1-2024-23-1099/113/2023Dated 16.01.2024 and ENC letter 36890C/RMC/Mool-23-24 Dated 17.02.2024 .Maintence of 2nd year after completion of work @ 0.25 % of total work amount of item 1 to 27. |
| 30 | Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert,maintennance og guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of Hectometr and kilometr stone, cutting of branches of tree, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stone, refixing of displaced guard stone (as per Mentioned in GO No. 17 /2024/Sa-113/23-1-2024-23-1099/113/2023Dated 16.01.2024 and ENC letter 36890C/RMC/Mool-23-24 Dated 17.02.2024 . Maintence of 3 rd year after completion of work @ 0.50 % of total work amount of item 1 to 27. |
| 31 | Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert,maintennance og guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of Hectometr and kilometr stone, cutting of branches of tree, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stone, refixing of displaced guard stone (as per Mentioned in GO No. 17 /2024/Sa-113/23-1-2024-23-1099/113/2023Dated 16.01.2024 and ENC letter 36890C/RMC/Mool-23-24 Dated 17.02.2024 .. Maintence of 4 rth year after completion of work @ 0.75 % of total work amount of item 1 to 27. |
| 32 | Maintenance of bituminous surface road and gravel or WBm road including filling pot holes and patch repair etc.restoration of rain cuts and dressing of side slop / berms,making up of berms / shoulders.maintenance of drain, maintenance of culvert,maintennance og guard rails and parapet.maintenance of road sign,speed breakers, standing tree at adjacent to road wherever required.maintenance of Hectometr and kilometr stone, cutting of branches of tree, shurb and trimming of grass and weeds etc.white whashing of parapet including CD Work,painting of guard stone, refixing of displaced guard stone (as per Mentioned in GO No. 17 /2024/Sa-113/23-1-2024-23-1099/113/2023Dated 16.01.2024 and ENC letter 36890C/RMC/Mool-23-24 Dated 17.02.2024 . Maintence of 5 th year after completion of work @ 1.00 % of total work amount of item 1 to 27. Please Enable Macros to View BoQ information |