|
| 1 | Material & labour for cleaning of white lime/ distember marks from wooden surface and smoothening surface with sand paper (Polished Portion) for French polishing of the articles of the following furniture as specified and directed.(including work at site i.e, Gurkha Hill, MAP Qtrs, New circle Area, WH & Castle Area):- |
| 2 | (a) Bed ply wood top |
| 3 | (b) Bin Soiled Linen |
| 4 | (c ) Book case small |
| 5 | (d) Chair Dining |
| 6 | (e) Chair Writing |
| 7 | (f) Hat Stand with Mirror |
| 8 | (g) Peg Table |
| 9 | (h) Side Board |
| 10 | (i) Sofa set 5 seater |
| 11 | (j) Stool dressing |
| 12 | (k) Table Bed Side |
| 13 | (l) Table Centre |
| 14 | (m) Table dressing gents with mirror |
| 15 | (n) Table dressing ladies with mirror |
| 16 | (o) Table Writing |
| 17 | (p) Teapoy |
| 18 | (q) Table dining 6/8 persons |
| 19 | (r ) Almirah medium / large wooden |
| 20 | (s) Chair Dining Cushioned (MAP) |
| 21 | (t) Chair Easy |
| 22 | (u) Studay Table |
| 23 | (v) Bin multipurpose |
| 24 | Preparation of old painted steel surfaces, cleaning and dusting where ever required (internal & external as shown on drg.) including removing of dent if any, carrying out welding wherever required and M&L for applying one coat of synthetic enamel paint (Black or white as per the existing requirement) in appropriate shade complete all as specified and directed for the following items (including work at site i.e, Gurkha Hill, MAP Qtrs, New circle Area, WH & Castle Area):- |
| 25 | (a) Rack Shoe Steel |
| 26 | (b) Chair CB Steel with Arms (Mod) |
| 27 | (c ) Teapoy Verandah |
| 28 | (d) Ladder for Loft |
| 29 | (e) Table Bed Side MAP |
| 30 | (f) Table clk Steel( Modified) |
| 31 | (g) Bed Hard Steel |
| 32 | (h) Chair Verandah |
| 33 | (j) Almirah Med Steel |
| 34 | (k) Almirah Large 1/2H x 1/2 S and Wirh Shelf |
| 35 | (l) Chair Writing (Steel) |
| 36 | Chair Verandah (MAP):-Removal ofunserviceable PVC Seat & Back and S&F new PVC Seat & Back for Chair Verandahof PPCP Material 4mm thick (As per drg) Make: AMKO including taking down the old worn out / brocken seat & back, M&L all as specified as shown on drg and directed(including work at site i.e, Gurkha Hill, MAP Qtrs, New circle Area, WH & Castle Area):- |
| 37 | Chair Dining Officer:-Removal ofunserviceable cushioned material, tapestry clothand S&F as per required size new cushion materialand upholstering of chair with new tapestry cloth of approved quality with foam sheet high density of 75mm thick 32 density, all as per drawing complete all as specified and directed. (including work at site i.e, Gurkha Hill, MAP Qtrs, New circle Area, WH & Castle Area):- |
| 38 | Sofa 5 Seater:-Supply of cushion for Sofa set of size 530 x 560 x 100mm thick of 40 high densitycomplete all as specified and directed. Make : Kurl-on/Sleepwell/Confort universe or Equivalent |
| 39 | Sofa 5 Seater:-Supply of upholstering loose cover out of tapestry cloth for cushion of set of size 530 x 560 x 100mmof approved quality the loose cover will be stiched/tailored and having good quality zip facility complete all as specified and directed. Make : As per sample held at BSO yard. |
| 40 | Chair Verandah:-(a)M&L for Preparation of surface of broken ends and welding the broken ends properly all as per drg and directed. |
| 41 | (b ) Removal ofunserviceable cane and M&L for weaving of Seat & Back with 4mm wide plastic cane closely wovan through out all as directed by Engr-in-charge. |
| 42 | (c) Removal ofunserviceable PVC shoe of Leg and S&F new Rubber shoe of best quality approved quality of white shade complete all as specified and directed. |
| 43 | Teapoy Verandah:-(a) S&F Top for teapoy verandah made out Pre-laminated Particle Board 18/19mm thick duly polished teak wood beading alround the top of size 440x800mmx18/19mm thick as per approved. |
| 44 | (b) Removal of Unserviceable PVC shoe of Leg and S&F new Rubber shoe of best quality approved quality of white shade complete all as specified and directed. |
| 45 | Replacement ofUnserviceable pegs and S&F new stainless Steel pegsof size 100mmx12mm with screw on the Hat Stand with Mirror(including work at site i.e, Gurkha Hill, MAP Qtrs, New circle Area, WH & Castle Area) Rest all as shown on drg and directed. As per sample held at BSO Yard. |
| 46 | Replacement of U/S Knob and S&F new fancy type knob of approved quality with appropriate screw for Side Board, Book Case, Table dressing gents, Table Bed Side and Table dressing ladies (including work at site i.e, Gurkha Hill, MAP Qtrs, New circle Area, WH & Castle Area) Rest all as shown on drg and directed. As per sample held at BSO Yard. |
| 47 | Replacement ofunserviceable PVC Shoes for Bed Hard Steel and supply and fixing new Rubber Shoes for Bed Hard Steel as per size required of approved quality (including work at site i.e, Gurkha Hill, MAP Qtrs, New circle Area, WH & Castle Area) Rest all as shown on drg and directed. As per sample held at BSO Yard. |
| 48 | (e) Taking down old unserviceable top from peg table and S&F new top 450x300mm x18/19mm prelaminated particle board with teak face with 4mm thick teak wood beading shall be provided all round all as specified.(including work at site i.e, Gurkha Hill, MAP Qtrs, New circle Area, WH & Castle Area) Rest all as shown on drg and directed. |
| 49 | Taking down old unserviceable top from table center and S&F new top 900x450mm x18/19mm prelaminated particle board with teak facewith 4mm thick teak wood beading shall be provided all round.(including work at site i.e, Gurkha Hill, MAP Qtrs, New circle Area, WH & Castle Area) Rest all as shown on drg and directed. |
| 50 | Taking down old unserviceable top from teapoy and S&F new top 800x450mm x18/19mm prelaminated particle boardwith 4mm thick teak wood beading shall be provided all round as specified.(including work at site i.e, Gurkha Hill, MAP Qtrs, New circle Area, WH & Castle Area) Rest all as shown on drg and directed. |
| 51 | Taking out old unserviceable top from Table writing and S & F new top 1145 x 610mm x 18/19mm prelaminated particle boardwith 4mm thick teak wood beading shall be provided all round as specified.(including work at site i.e, Gurkha Hill, MAP Qtrs, New circle Area, WH & Castle Area) Rest all as shown on drg and directed. |