| 1 | Preparing Black Top surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as per SSR and as directed by EIC |
| 2 | M&L Applying evenly a priming/tack coat withbituminous primer at 10 kg per 10 sq metre using paving bitumen etc. complete all as per SSR and as directed by EIC |
| 3 | M&L Bituminous premixed carpet, 2cm consolidated thickness, with 0.27 cu.m. of 12.5mm stone chippings mixed with 14.6 kg of binder, rolled with power roller and compacted to required camber and gradient using paving bitumen etc. complete all as per SSR and as directed by EIC. |
| 4 | M&L Liquid seal coat applying evenly binder @ 9.8 Kg per 10 sqm binding with 6.3mm size stone chippings @ 0.09 cum per 10 sqm and rolled with power roller to a uniform smooth surface using paving bitumen etc., complete all as per SSR and as directed by EIC |
| 5 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area n exc 400 sqm (not exceeding 50mm deep) etc. complete all as per SSR and as directed by EIC |
| 6 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area n exc 400 sqm (exceeding 50mm not exceeding 100mm deep) etc. complete all as per SSR and as directed by EIC |
| 7 | M&L Premix bituminous, macadam laid/rolled with power roller exc 8 Tonne n.exc. 12 Tonne and compacted to required gradient and camber (consolidated thickness 75mm or less) using 20mm graded aggregate paving bitumen any penetration with binder content of 4% by weight of total mix etc. complete all as per SSR and as directed by EIC |
| 8 | Excavating in trenches in Hard/Dense soil, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out etc. complete all as per SSR and as directed by EIC |
| 9 | Rolling and consolidating formation surfaces in cutting using power roller exceeding 8 Tonne not exceeding 12 Tonne to achieve well prepared surface for Wet Mix Macadam etc. complete all as per SSR and as directed by EIC |
| 10 | Providing & Laying, spreading and compacting gradedstone aggregates to Wet Mix Macadam to required thickness specification including Premixing the materials with water at OMC in Mechanical mix plant carriage of material by tipper to site, laying in uniform layers with pavers in Sub base/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete all as per SSR and as directed by EIC |
| 11 | M&L Moorum/Red Bajri spread (average spread thickness 75mm), rolled and consolidated to gradient and camber required etc., complete all as per SSR and as directed by EIC |
| 12 | M&L for providing and applying 2.5mm thick road marking strips (Retro Reflective) of specified shade/colour using hard thermoplastic material by fully automatic thermoplastic paint applicator machine fitted with profile shoe, Glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cleaning the road surface of all dirt, seals, oil, grease and foreign materials etc., complete all as directed by EIC and in accordance with manufacturers specifications |
| 13 | Demolition of Cement Concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) etc., complete all as per SSR and as directed by EIC |
| 14 | Surface excavation in Hard/Dense soil n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out etc., complete all as per SSR and as directed by EIC |
| 15 | M&L7.5cm thick (compacted thickness) WBM, with granite coarse aggregates of grading 2 (63 to 40mm size), spread, rolled and consolidated to gradient and camber required etc., complete all as per SSR and as directed by EIC |
| 16 | Preparing unsurfaced water bound macadam surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirtetc., complete all as per SSR and as directed by EIC |