| 1 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. (including necessary scaffolding/ Cradle Platform as required as per site condition.) |
| 2 | Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour.(including necessary scaffolding/ Cradle Platformas required as per site condition.) |
| 3 | Two Coats |
| 4 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :(including necessary scaffolding/ Cradle Platformas required as per site condition.) |
| 5 | One or more coats on old work |
| 6 | Finishing walls with Acrylic Smooth exterior paint of required shade(including necessary scaffolding/ Cradle Platformas required as per site condition.) |
| 7 | Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface |
| 8 | CEMENT PLASTER (IN COARSE SAND) (including necessary scaffolding/ Cradle Platformas required as per site condition.) |
| 9 | 12 mm cement plaster of mix : |
| 10 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete(including necessary scaffolding/ Cradle Platformas required as per site condition.) |
| 11 | Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. (including necessary scaffolding/ Cradle Platformas required as per site condition.) |
| 12 | Granite stone slab all colour and texture except black, Cherry/ Ruby redArea of slab upto 0.50 sqm |
| 13 | Finishing walls with textured exterior paint of required shade(including necessary scaffolding/ Cradle Platformas required as per site condition.) |
| 14 | New work (Two or more coats applied @ 3.28 ltr/10 sqm)over and including priming coat of exterior primer applied @ 2.20kg/10 sqm |
| 15 | Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete. (including necessary scaffolding/ Cradle Platformas required as per site condition.) |
| 16 | Wedge expansion type |
| 17 | Fastener with threaded dia 6 mm |
| 18 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. (including necessary scaffolding/ Cradle Platformas required as per site condition.) |
| 19 | With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre |
| 20 | Sub Total |
| 21 | Modification factor on DSR Item 1 to [email protected] |
| 22 | Cleaning the sand stone surface and removing dirt, dust, bird dropping, grease, oil, algae, fungus, monkey beats, vegetable growth etc., including providing, applying and washing the surface with liquid Ammonia Chemical of 5% solution and other chemical cleaning agent as approved by Archaeological Survey of India/ Engineer-in-charge, of approved brand and manufacturer, with the help of required scrubbers and also cleaning with machine operated water jet mixed with desired quantity of fine silica where ever required, without causing any scratching/ damage to the stone surface and finally washing the surface with clean water with the help of pressure jet machine, complete in all respect, including taking all precautions to safeguard ventilators, windows, doors etc. by suitable covering so as to avoid any damage to the building/structure, all as per direction of Engineer-in- charge (including necessary scaffolding/ Cradle Platformas required as per site condition.) |
| 23 | Sub Total |