|
| 1 | Earth work in excavation forfoundation of structures as per drawing including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material includingcost of all labour, material, usage charges of machinery, lead, lifts, loading, unloading transporting, etc., complete. All other incidental charges complete as per the direction of Engineer-In-Charge of the work.Ordinary soilMechanical Means using hydraulic excavatorDepth upto 3 m |
| 2 | Plain / Reinforced Cement ConcreteM 15 in in open foundation complete as per Drawing and technical specifications including formwork, centering, compacting, cost of all labour, materials, usage charges of machinery, curing, lead, lifts, loading, unloading, transporting, stacking, finishing the exposed faces neatly etc., All other incidental charges complete as per the direction of Engineer-In-Charge of the work.completewith lead of concrete mix up to 1 Km(excluding cost of steel and fabrication charges) |
| 3 | Plain / Reinforced Cement Concretein Open foundation complete as per Drawing and Technical specifications, includingformwork, centering, vibrating , compacting, cost of all materials, usage charges of machinery, curing, lead, lift, loading, unloading, transportation, stacking, finishing the exposed faces neatly etc., All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete with a lead of concrete mix up to 1 Km (excluding cost of steel and fabrication charges)PCC M20 using 20mm and downsize metalUsing Batching plant, transit mixer and manual placing |
| 4 | Supplying, fitting and placing uncoated TMT Fe 500 grade bar reinforcement infoundation complete as per drawing and technical specifications, including straightening bars, cutting, bending, hooking, binding with approved quality binding wire after placing in position, tying, lapping and or welding wherever required (laps, hooks and wastages shall not be measured and paid)including cost of all materials, fabrication charges, all labour, material, usage charges of machinery, lead, lifts, loading, unloading, stcaking transporting etc., All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete |
| 5 | Plain / Reinforced Cement Concretein substructure complete as per Drawing and Technical specifications, includingformwork, centering, vibrating , compacting, cost of all materials, usage charges of machinery, curing, lead, lift, loading, unloading, transportation, stacking, finishing the exposed faces etc., All other incidental charges complete as per the direction of Engineer-In-Charge of the work.complete PCC M20 using 20mm and downsize metalUsing Batching plant, transit mixer and concrete pumpp Height up to 5m |
| 6 | Supplying, fitting & placing T.M.T FE -500 Grade bar reinforcement in substructure including cost of all materials, usage charges of machinery, fabrication charges, straightening, cutting, bending, hooking, binding, with approved quality binding wire after placing in position teing lapping and or welding wherever required (laps, hooks and wastages shall not be measured and paid) with all lead, lifts, loading unloading, transporting, stacking neatly etc., All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete as per drawing & technical specifications. |
| 7 | Providing Weep Holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm PVC pipe, 110mm dia at 4Kg / Sqcm , fixing wuth glue extending through the full width of the structure with slope of 1V :20H towards drawing force including cost of all materials, curing, all labour, material, usage charges of machinery, lead, lifts, loading, unloading, transporating etc.,All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete as per drawing and technical specifications. |
| 8 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition as per drawing including cost of materials, labour, watering,transporting, lead, lift, loading, unloadingetc., All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete |
| 9 | Back filling behind abutment, wing wall, return wall including cost of all labour, materials, usage charges of machinery, lead, lift, loading, unloading transporting etc All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete. as per drawing and Technical specifications. Granular material |
| 10 | Reinforced Cement Concrete Crash BarrierProvision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with TMT reinforcement M-20 grade concrete with HYSD reinforcement conforming to IRC:21, dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphaltconfirming to MoRTH specification and as per details given IRC(Fig-5B) including dowel bars 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board etc., as perapproved drawing and at locations directed by the Engineer, all as specified (area-0.243 Sqm/mtr, single phase including curing, cost of all materials, all labour, lead, lifts, loading, unloading, transporting etc., All other incidental charges complete as per the direction of Engineer-In-Charge of the work.complete. a) Using M25 Grade Concrete |
| 11 | Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces, including cost of all materials, all labour, lead, lifts,loading, unloading, transporting etc., All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete. |
| 12 | Providing and erecting Project Display Board of size 1.80 verticalx 1.60M Horizontal made of Cold Rolled Coil Sheet 16 Guage (1.6mm thickness) sheeting strengthened by welding to MS angle of size 35x35x5mm iron framework on all sides, extra cross vertical angle fixed using nuts and bolts, base of the board shall be cleaned, applying red oxide and black paint by sprayer on both sides of the board and all MS iron frameworks, background of the facing side of the board painted in traffic yellow, project information written in English/Kannada/Hindi, painting letters and numerals in black, fixed on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level and the board 2.8M from ground level as per approved drawing (Excluding cost of lettering)including cost of all materials all labour, lead, lifts, loading, unloading transporting etc., All other incidental charges complete as per the direction of Engineer-In-Charge of the work. complete. |