| 1 | Schedule \"A\" Part-I \"Supply, Erection & Stringing o f 11 kV line (2 km) with ACSR (Rabbit) Conductor with 9 m long Steel Tubular Pole - Sector HQ, Garrison & Assam Rifles Battalion, Songpi\". M&L for errection of 9.0 m S.T.P.(410:SP-31) electric pole with excavation, Filling with PCC 1:4:8 and and coping with PCC 1:3:6 all as directed by Engr-in-Charge |
| 2 | M&L for Pole top bracketall as directed by Engr-in-Charge |
| 3 | M&L for Back clamp for Pole top bracketall as directed by Engr-in-Charge |
| 4 | M&L for Cross arm(75X40)mmall as directed by Engr-in-Charge |
| 5 | M&L for Back clamp for X-armall as directed by Engr-in-Charge |
| 6 | M&L for 2.2m D.P. channel X-arm (75X40)mmall as directed by Engr-in-Charge |
| 7 | M&L for 11 kV Disc. Insulator (Complete set i/c Tension clamps,Hardware) |
| 8 | M&L for 11 kV Insulator with Pinall as directed by Engr-in-Charge |
| 9 | M&L for ACSR Conductor (Rabbit)all as directed by Engr-in-Charge |
| 10 | M&L for 11 kV AB Switch 400 Amp with X-arm etc. |
| 11 | M&L for CT & PT Metering Unit (3 Ph 4 Wire) (a) C.T Ratio 30/5 Aall as directed by Engr-in-Charge |
| 12 | M&L for Control cable (Copper)(a) CTPT to Meter Box 1.1 kV, 10C x 2.5 sq.mm |
| 13 | M&L for Stay Set complete with stay wire, base plate, stay rod etc. and including excavation and PCC 1:3:6 all as directed by Engr-in-Charge |
| 14 | M&L for Stay Clampall as directed by Engr-in-Charge |
| 15 | M&L for Bracing for D.P.structure, 50X50X6mm M.S. Angleall as directed by Engr-in-Charge |
| 16 | M&L for Clamp for D.P. Bracing.all as directed by Engr-in-Charge |
| 17 | M&L for Earthing set complete with G.I. wireall as directed by Engr-in-Charge |
| 18 | M&L for PG Clamp for joining of end conductors & jumpers |
| 19 | M&L for Nuts & Bolts with washers (a) (5/8)\" x 3\" |
| 20 | M&L for Nuts & Bolts with washers (a) (5/8)\" x 6.5\" |
| 21 | M&L for Pole Muffing all as directed by Engr-in-Charge |
| 22 | M&L for Pole Painting all as directed by Engr-in-Charge |
| 23 | Schedule \"A\" Part-II \"Supply, Installation, Testing & Commissioning of 1x500 kVA Distribution Sub-Station - Sector HQ, Garrison & Assam Rifles Battalion, Songpi\".M&L for errection of 9.0 m S.T.P.(410:SP-31) pole with excavation, Filling with PCC 1:4:8 and and coping with PCC 1:3:6all as directed by Engr-in-Charge |
| 24 | M&L for Channel 100x50,@7.9 kg/m 2.8x2 for supporting transformer all as directed by Engr-in-Charge |
| 25 | M&L for Channel 100x50,@7.9 kg/m 2.8x2 for DP X-arm |
| 26 | M&L for Channel 100x50,@7.9 kg/m 0.46x2 for supporting of item 2 all as directed by Engr-in-Charge |
| 27 | M&L for Channel [email protected]/m 2x2.8m for HG fuse unit & AB switch all as directed by Engr-in-Charge |
| 28 | M&L for Channel [email protected]/m 2x0.5m for supporting HG fuse main channel X-arm all as directed by Engr-in-Charge |
| 29 | M&L for Clamp for AB switch bracing 50x8mm@ 3. lkg/m 0.23mx2=0.46m all as directed by Engr-in-Charge |
| 30 | M&L for Clamp for DB Box Cross Arm |
| 31 | M&L for Sub-station earthing all as directed by Engr-in-Charge |
| 32 | M&L for CT & PT Metering Unit (3 Ph 4 Wire)(a) C.T Ratio 30/5 A all as directed by Engr-in-Charge |
| 33 | M&L for Control cable (Copper)(a) CTPT to Meter Box 1.1 KV, 10C x 2.5 sq.mm |
| 34 | M&L for Control cable (Copper)(a) CTPT to Meter Box 1.1 KV, 10C x 2.5 sq.mm |
| 35 | M&L for AC 3 Ph 4 wire fully static trivector HT energy meter with box |
| 36 | Supply, installation, testing and commissioning of copper wound distribution transformer step up/step down, indoor/outdoor type complete with standard fittings, HT 11KV 3 phase, LT 433 Volts, 3 phase 4 wire with off load tappings on HT side to vary secondary voltage witing limit. all as per IS:2026 of capacity 500 kVA.Note: Cost of staggingand commissioning by State electricity department is included. |
| 37 | M&L for 11 kV A.B.Switch 200 Amp all as directed by Engr-in-Charge |
| 38 | M&L for Horn gap fuse unit/D.O fuse, 3-ph all as directed by Engr-in-Charge |
| 39 | M&L for 3 Way D.B box with complete accessories with kit kat all as directed by Engr-in-Charge |
| 40 | M&L for 1.1KV grade 3.5 core 120 sq.mm PVC insulated al. power cable all as directed by Engr-in-Charge |
| 41 | M&L for D.B box cross arm of MS angle 35x35x5mm @ 2.6kg/m 2.8x2=5.6m all as directed by Engr-in-Charge |
| 42 | M&L for Sub-station earthing all as directed by Engr-in-Charge |
| 43 | M&L for Transformer Foundation all as directed by Engr-in-Charge |
| 44 | M&L for Sub-station Fencing all as directed by Engr-in-Charge |
| 45 | M&L for Danger board all as directed by Engr-in-Charge |
| 46 | M&L for 11 kV lighting arrester all as directed by Engr-in-Charge |
| 47 | M&L for Nuts & Bolts with washers.(a) (5/8)\" x 3\" |
| 48 | M&L for Nuts & Bolts with washers.(b) (5/8)\" x 8.5\" |
| 49 | M&L for Pole Muffing all as directed by Engr-in-Charge |
| 50 | M&L for Pole Painting all as directed by Engr-in-Charge |
| 51 | M&L for AC 3 Ph 4 wire fully static trivector HT energy meter with box |
| 52 | Schedule \"A\" Part-III \"Supply, Installation, Testing & Commissioning of 1x250 kVA Distribution Sub-Station - Sector HQ, Garrison & Assam Rifles Battalion, Songpi\". M&L for errection of 9.0 m S.T.P.(410:SP-31) electric pole with excavation, Filling with PCC 1:4:8 and and coping with PCC 1:3:6 all as directed by Engr-in-Charge |
| 53 | M&L forChannel 100x50,@7.9 kg/m 2.8x2 for supporting transformer all as directed by Engr-in-Charge |
| 54 | M&L for Channel 100x50,@7.9 kg/m 2.8x2 for DP X-arm all as directed by Engr-in-Charge |
| 55 | M&L for Channel 100x50,@7.9 kg/m 0.46x2 for supporting of item 3.02 all as directed by Engr-in-Charge |
| 56 | M&L for Channel [email protected]/m 2 x2 .8m for HG fuse unit & AB switch all as directed by Engr-in-Charge |
| 57 | M&L for Clamp for Transformer belting all as directed by Engr-in-Charge |
| 58 | M&L for Channel [email protected]/m 2 x0 .5m for supporting HG fuse main channel X-arm all as directed by Engr-in-Charge |
| 59 | M&L for Angle (50x50x6)mm 2.8x2 @4.5kg/m transformer belting and angle (35x35x5), 0.46x2 @2.6kg/m. Transformer belting support all as directed by Engr-in-Charge |
| 60 | M&L for Clamp for transformer base channel for MS flat [email protected]/m 0.27mx2 all as directed by Engr-in-Charge |
| 61 | M&L for Clamp for AB switch bracing 50x8mm@ 3.1 kg/m 0.23mx2=0.46m all as directed by Engr-in-Charge |
| 62 | M&L for Clamp for DB Box Cross Arm all as directed by Engr-in-Charge |
| 63 | Supply, installation, testing and commissioning of copper wound distribution transformer step up/step down, indoor/outdoor type complete with standard fittings, HT 11KV 3 phase, LT 433 Volts, 3 phase 4 wire with off load tappings on HT side to vary secondary voltage witing limit. all as per IS:2026 of capacity 250 kVA.Note: Cost of stagging cost of testing and commissioning by State electricity department is included. |
| 64 | M&L for 11 kV A.B.Switch 200 Amp all as directed by Engr-in-Charge |
| 65 | M&L forHorn gap fuse unit/D.O fuse, 3-ph all as directed by Engr-in-Charge |
| 66 | M&L for 3 Way D.B box with complete accessories with kit kat all as directed by Engr-in-Charge |
| 67 | M&L for 1.1 KV grade 3.5 core 120 sq.mm PVC insulated al. power cable all as directed by Engr-in-Charge |
| 68 | M&L for D.B box cross arm o f MS angle 35x35x5mm @ 2.6kg/m 2.8x2=5.6m all as directed by Engr-in-Charge |
| 69 | M&L for Sub-station earthing all as directed by Engr-in-Charge |
| 70 | M&L for Sub-station Fencing all as directed by Engr-in-Charge |
| 71 | M&L for Danger board all as directed by Engr-in-Charge |
| 72 | M&L for 11 kV lighting arrester all as directed by Engr-in-Charge |
| 73 | M&L Nuts & Bolts with washers.(a) (5/8)\" x 8.5\" |
| 74 | M&L Nuts & Bolts with washers.(b) (5/8)\" x 8.5\" |
| 75 | M&L for Pole Muffing all as directed by Engr-in-Charge |
| 76 | M&L for Pole Painting all as directed by Engr-in-Charge |
| 77 | Schedule \"A\" Part-IV\"Supply, Erection & Stringing of LT Line (5.2 kin) using AB Cable (3x95 + 1x70) sq.mm - Sector HQ, Garrison & Assam Rifles Battalion, Songpi\".M&L for errection of8.0 m S.T.P.(410:SP-14) electric pole with excavation, Filling with PCC 1:4:8 and and coping with PCC 1:3:6 all as directed by Engr-in-Charge |
| 78 | M&L for LT Cross Arm 0.5 m long MS Angle all as directed by Engr-in-Charge |
| 79 | M&L for Back clamp for cross arm all as directed by Engr-in-Charge |
| 80 | M&L for Dead end fitting for AB Cables with bare messenger wire complete with eye hook as per construction standard all as directed by Engr-in-Charge |
| 81 | M&L for Suspension fitting for AB Cables with bare messenger wire complete with eye hook as per construction standard all as directed by Engr-in-Charge. |
| 82 | M&L for Insulation pierching connector for AB Cable Big Size (Main: 16-95 sq.mm, Service: 4-35(50) sq.mm) as per TS & construction standards all as directed by Engr-in-Charge. |
| 83 | M&L AB Cables(i) (3x95 sqmm + 1 x70) sq.mm |
| 84 | M&L for Stay Set complete with stay wire, base plate, stay rod, stay insulator, clamp, excavation and pcc 1:3:6 all as directed by Engr-in-Charge |
| 85 | M&L for Bolts & Nuts with washer (5/8x3\" full thread) all as directed by Engr-in-Charge |
| 86 | M&L for Pole Muffing all as directed by Engr-in-Charge |
| 87 | M&L for 9/11 mtr Pole painting all as directed by Engr-in-Charge |