|
| 1 | Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF RETAINING WALL. |
| 2 | Plain Cement Concrete M10 grade, Nominal Mix 1:3:6 using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing,transporting, laying, and curing concrete, working at heights.hire charges for tools and plants, including all other incidental charges,etc..complete as per standard specification for Levelling Course for RCC Retaining WALLS. |
| 3 | Vibrated Reinforced Cement Concrete M-35, Grade, Design Mix, using 20mm & below ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights,hire charges for tools and plants, including all other incidental chages etc., complete for Footing of RCC Retaining wall as per MORT&H specifications (V revision) |
| 4 | Vibrated Reinforced Cement Concrete M-35, Grade, Design Mix, using 20mm & below ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights,hire charges for tools and plants, including all other incidental chages etc., complete for Stem of RCC Retaining wall Below GL as per MORT&H specifications (V revision) |
| 5 | Vibrated Reinforced Cement Concrete M-35, Grade, Design Mix, using 20mm & below ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights,hire charges for tools and plants, including all other incidental chages etc., complete for Stem of RCC Retaining wall Above GL as per MORT&H specifications (V revision) |
| 6 | Providing and fixing PVC seepage pipes of 100mm dia. PVC pipes of required lengths for retaining Wall including cost and conveyance of all materials to work site, and labour charges for fixing, etc., as per Cl 2706 of MORT&H specifications (V revision) |
| 7 | Vibrated reinforced Concrete M-40, Grade, Design Mix, using 20mm & below ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,etc, complete for CRASH BARRIER as per Cl 811,1700&2703.3 of MORT&H specifications (V revision). |
| 8 | Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500, conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks, Anticorrosive treatment and all other incidental charges etc. complete, Fe-500 grade as per Cl 1600 of MORT&H specifications (V revision). |
| 9 | Calculation of SubTotal, GST and Total Amount carried out by system automaticallyBasic cost of value put to tender as per estimate |
| 10 | Add GST at 18% |
| 11 | Total Value put to Tender |
| 12 | Negotiated Percentage |
| 13 | Final Negotiated Value |
| 14 | Add GST at 18% of Final Negotiated Value |
| 15 | Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information |
| 16 | Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information |