Cable End Termination For Copper Cables – 3C x 4 Sq.mm
11
Time controller for street light poles
12
Supply & Laying of double wall corrugated ( DWC) pipe 50 mm OD / 38 mm I.D.Supply & Laying of double wall corrugated ( DWC) pipe 50 mm OD / 38 mm I.D.
13
Excavating the trenches and refilling,reinstatement of the same after the cable is laid in approved manner (750 mm deep, 600 mm wide),in all types of soils 1 Cu. Mtr. = 2.2 RMT
14
Excavating the trenches and refilling the same after the cable is laid in approved manner (Size of trench: 750 mm deep, 600 mm wide) in concrete/ masonary / asphalt. 1 Cu. Mtr. = 2.2 RMT. And reinstatementExcavating the trenches and refilling the same after the cable is laid in approved manner (Size of trench: 750 mm deep, 600 mm wide) in concrete/ masonary / asphalt. 1 Cu. Mtr. = 2.2 RMT. And reinstatement
15
Earthing station with 600 mm x 600 mm x 6 mm galvanised iron plate
16
Earthing Continuity Conductors -25 x 3mm GI Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.