| 1 | CIVIL WORK |
| 2 | Excavation in foundation in ordinary soil incluidng filling lift and lead up to 30 m & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation trenches or plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 m from the foundation trenches including all T&P etc. complete. |
| 3 | Soling out or pumping out water to keep trenches dry excavation of trenches other construction and laying the sewer etc. copmlete. |
| 4 | Hire labour charges for 5 cm thick timber shoring (A) From 0 m to 3 m below Ground Level for Man hole etc. complete. |
| 5 | Cement Concrete with 4 cm gauge brick ballast, sand of 1.25 FM, and cement in proportion of 12:6:1 in fondation and under floor including supply of all material, labour, T&P etc. required for proper completion of the work As per UPPWD SOR 2022 S.I. No. 273. |
| 6 | Supply and Laying of 450 mm dia NP-3 Hume pipe with coller jointing with cement mortor including Loading Unloading charge, labour, T&P etc. complete but including cost of hume pipe as per UPPWD SOR 2022 SI.No.NS-5 (A) (v). |
| 7 | 1st class brick work in 4:1 fine sand and cement of 1.25 fineness modulus mortor in foundation & plinth including supply of all material, labour and tools and plants etc. required for proper completion of the work As per UPPWD SOR 2022 S.I. No. 305. |
| 8 | 12mm thick plaster with cement mortar in proportion of 1:4 cement and sand of 1.25 FM over brick work minimum thickness not to be less than 10mm including supply of all material labour T&P etc. complete as per UPPWD SOR 2022 S.I. No. 584. |
| 9 | Laying Cement Concrete road, slab consisting of 1:2:4 cement, coarse sand and approved 20mm gauge stone ballast over prepared sub-grade after its rectifications & bringing it to proper camber and including supply of all material, labour, T&P etc. required for proper completion of the work, finished to required template as directed by E/I. but excluding cost metal required for reflection of the sub-grade As per UPPWD SOR 2022 S.I. No. 773. |
| 10 | R.C.C. Work with cement, approved coarse sand and 2 cm gauge approved stone ballast in proportion of 1:2:4 in R.C.C. T. beam and slab and R.C.C. column excluding its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc.,and also including supply of all material required for proper completion of the work. Binding wire to be supplied by the contractor free of cost As per UPPWD SOR 2022 S.I. No. 283. |
| 11 | Mild steel work (TMT Bar HYSD) such as in reinforced concrete work wrought to required shape as necessary including bending and also including supply of steel and wastages and overlapping and hooks required for completion of the work As per UPPWD SOR 2022 S.I. No. 504. |
| 12 | Supply and Fixing of precast reinforced cement concrete man hole cover made with angle iron frame size (27\"x27\") including supply of frame, R.C.C. Cover, fixing, labour, T&P etc. complete required for proper completion of the work as directed by Engineer-In-Charge. |
| 13 | Supply and Fixing of Granite stone display board with fixing in brick masonry wall, lettering & painting including supply of all material, labour, plastering etc. complete required for proper completion of the work. |
| 14 | GST Please Enable Macros to View BoQ information |