|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) |
| 2 | Earth work in excavation in trench for foundation in ordinary soil i/c lift upto 1.50 mtr. & lead upto 50.00 mtr. And dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed bu the E/I within a distance of 50 m. |
| 3 | Providing and Laying of Ruber mold Interlocking Red and Gray Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. |
| 4 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 5 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 using batching plant transit mixer & manual placing |
| 6 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. |
| 7 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. |
| 8 | Wrought iron and mild steel welded work (using angles, square bars, tees and channel grills, grating frames, gates and tree guards of any size and design etc. including cost of screens and welding rods or bolts and nuts complete fixed in position but without the cost of excavation and concrete for fixing which will be paid separately |
| 9 | Fixing of mild steel gate including cartage, labour T&P etc. for proper completion of work. |
| 10 | Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade |
| 11 | Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications |
| 12 | Dismantling existing plaster including disposal of refuse as directed by the Engineer-in-charge with a distance of 60 metres (200feet). |
| 13 | Providing and applying white cement based Putti of avg thiknes 1mm of approved brand and manufcturer over the plaster wall surface to prepare the surface even and smooth complete. |
| 14 | Panting 2 coat on Ceiling with premium acryaic smooth exterior paint with siricon additives or approved quality. |
| 15 | UPVC Window size on (6x5) |
| 16 | Tiles in flooring. |
| 17 | For Electrical work. Please Enable Macros to View BoQ information |