|
| 1 | Scrapping old painted surface including disposal of all scrapped materials by Mechanical means. |
| 2 | Excavation in Foundation in Ordinary soil for structure i/c all lead & reqd. lifts as per site requirement and with proper disposel of excavated earth as per directed by engineer in charge for proper completion of work |
| 3 | Cement Concrete in (1:3:6) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work |
| 4 | Ist class Brick work in 1:4, Cement Coarse Sand (F.M. Not less than 2.00), morter in warping i/c cost of material Labour & T&P etc complete for proper completion of work |
| 5 | Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work |
| 6 | Ordinary Centering Of Line Plywood Or Steel Shuttering for C.C. work complete for proper completion of work |
| 7 | Ordinary Centering Of Line Plywood Or Steel Shuttering for R.C.C. work complete for proper completion of work |
| 8 | Reinforced cement concrete (1:1.5:3) mix with Cement Coarse Sand (F.M. Not less than 2.00), stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work |
| 9 | Cement Concrete in (1:1:2) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work |
| 10 | S/L of Two coat Tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work |
| 11 | Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate carring & filling of filler material of bitumin soil dust & Coarse Sand (F.M. Not less than 2.00), etc complete for proper completion of work |
| 12 | Cutting, Bending, Binding & Placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work |
| 13 | Supply and laying of Ordinary Sand till GL for easily abd early compaction including cost of all material labour T&P etc. as per directed by engineer in charge complete for proper completion of work. |
| 14 | Supply and Fixing 75mm Dia PVC Pipe for drainage sqouts. Including cost of all material T&P, labours etc for proper completion of work as per directed by engineer in charge. |
| 15 | Providing and Fixing of year Plate for proper completion of work |
| 16 | Providing and fixing of B.M Plate for proper completion of work |
| 17 | Supply and Fixing wheel Guard stone (Size 150mmx150mmx900mm) for proper completion of work |
| 18 | Earth work in Filling in Layers including cariage of earth from a distance of 600 mt. & all lifts i/c ramming dressing & all labour T&P etc. |
| 19 | Finishing Wall with one coat of water proof cement paint weather coat of quality on previously new surface with this paint to give an even shade including supply of all mareials, labour,Tools, & plant etc. required for proper completion of work |
| 20 | Construction of granualr sub base providing well graded material spreading in uniform layer with mortar grader tractor mounted appropriate equipment on prepared surface mixing by mix in place method with rotavetor at omc and compacted with smooth MORD specification |
| 21 | providing laying spreading and compacted stone aggrigate of specific sizes to water bound macadam specification including spreading in uniform thickness , band packing , rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber , applying and brooming , stone screening to fill - up the inteslices of coarse aggregate , watering and compacted to the required density grading 2 as per technical specification clause 405 |
| 22 | providing laying spreading and compacted stone aggrigate of specific sizes to water bound macadam specification including spreading in uniform thickness , band packing , rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber , applying and brooming , stone screening to fill - up the inteslices of coarse aggregate , watering and compacted to the required density grading 2 as per technical specification clause 405 |
| 23 | Brick Edging 7cm wide on both side of the road M-150 bricks complete as per PWD detailed specification no. 20.15 |
| 24 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular sub base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per technical specification clause 502. |
| 25 | Providing and applying Tack coat with VG-10 Bitumen over bituminous surface at the rate of 0.35kg per sqm on the prepared bituminous surface cleaned with hydraulic as per technical specification clause 503. |
| 26 | Providing laying and rolling of open graded premix carpet of 20mm thickness composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumin or emulsion to required line, grade and level to serve as wearing course on a previously prepared bae including mixing in a sutable plant laying and rolling with a tree wheel 80-100 KN static roller capacity , finish to required level and grades to be followed by sal coat of type c as per technical specification clause 508 |
| 27 | Providing and laying seal coat sealing the voids in a bituminus surface laid to the specified levels ,grade abd cross fall using type -c as er technical specification Clause 510 Please Enable Macros to View BoQ information |