| 1 | Cleaning rubbish, sludge, weeds, scum, liquid earth, mud etc. from roadside masonary drain/ humepipe drain/ culvert etc. by mathor labour after removing concrete. Slab/ manhole cover etc. without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc. by using ironpans, buckets including all labour, tools & plants including removing the spoils in dry condition and disposing the same by truck beyond the roadside including loading into truck and cleaning the roadside in all respect. |
| 2 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect. |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils with in a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. |
| 4 | Fine Sand filling in foundation or plinth in layers not exceeding 15cm. consolidating same by thorough saturation with water and ramming complete, including the cost of supply of sand. |
| 5 | Single Brick Flat soling of Picked Jhamma Bricks including ramming and dressing bed to proper level and filling joints with local sand including cost of sand. |
| 6 | Ordinary Cement concrete (mix1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. a) Pakur Variety |
| 7 | Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth |
| 8 | 125 mm thick brick workwith 1st class bricks in cement mortar (4:1) in ground floor |
| 9 | Hire and Labour charges for shuttering of concrete Roof Slabs, Beams, Lintels etc. including provision of stout vertical props where necessary upto height of less than 3.6 m. and concrete thickness of less than 15cm. Fitting, fixing and striking out after completion of work, With prop |
| 10 | Hire and Labour charges for shuttering of concrete Roof Slabs, Beams, Lintels etc. including provision of stout vertical props where necessary upto height of less than 3.6 m. and concrete thickness of less than 15cm. Fitting, fixing and striking out after completion of work, Without prop |
| 11 | Reinforcement (for Reinforced concrete work) including distribution bars, stirrups, binders etc., including supply of rods, straightening bend and half round bars of any dia., removal of loose rust, cutting to requisite length, hooking and binding with 1.626 mm black annealed binding wire at every intersection complete including cost of wire. |
| 12 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. a) Pakur Variety |
| 13 | 15 mm. Thick plastering with sand and cement mortar ( prop. 1 : 6) including rounding off or Chamfering corners as directed and raking out joints or roughening of concrete surface including chipping and application of cement slurry where necessary etc. |
| 14 | Neat Cement Punning work in wall dado etc. |
| 15 | Display Board writing & photo (3 phase). |
| 16 | Add CGST @ 9.00% of Total Cost |
| 17 | Add SGST @ 9.00% of Total Cost |
| 18 | Labour welfare cess @ 1.00% |
| 19 | Add Contigency Please Enable Macros to View BoQ information |