| 1 | Part-A (SITC of Both building) |
| 2 | SITC of HVAC OF CONTROL ROOM BUILDING |
| 3 | SITC of Water Cooled Screw compressorSITC of Water-Cooled Screw compressor for Control Room Building Supply, Installation, Testing and Commissioning of Water Cooled Screw compressor, Capacity Minimum 110TR (upto+10%) , With Eco-friendly refrig R134a). Complete with Motor, Water cooled Condenser, Water Chiller with standard accessories refrigerant piping, fittings, valves, etc. as requiredFor further details, refer technical specifications and scope of work. |
| 4 | SITC of Condensor Water Pump Set for CBSITC of Condensor Water Pump Set for Control Room Building Head: Mininmum 36 MtrsEach Unit Shall be capable of delivering complete with Gate valves, NRV, Y-Type Strainer, Mechanical seal, Motor, Pressure gauges with isolation valve, Mounting frame with antivibration pads, RCC/ cement concrete foundationFor further details, refer technical specifications and scope of work. |
| 5 | SITC of Chiller Water Pump Set for CBSITC of Chiller Water Pump Set for Control Room BuildingHead: Mininmum 27 MtrsEach Unit Shall be complete with Gate valves, NRV, Y-Type Strainer, Mechanical seal, Motor, Pressure gauges with isolation valve, Mounting frame with antivibration pads, RCC foundation, Insulation cladded with Aluminium sheetFor further details, refer technical specifications and scope of work. |
| 6 | SITC of FRP Cooling Tower for CBSITC of FRP Cooling Tower designed for Control Room Building,Capacity: Minimum 150 TREach unit shall be complete with FRP water basin, PVC fillings with integral louvers and drift eliminators complete with hot water basin either fitted with dynamically balanced axial flow type fan-direct driven or driven through reduction gear box with TEFC induction motor, suction screen, make up quick fill arrangement, overflow and drain connections with necessary valves and suitable inspection ladder, motor, access arrangement for cooling tower interior, cement concrete foundation, steel/ masonry supporting structure, anti-vibration mountings etc. complete as per specifications and as required. Each shall be provided with MCB isolator in weather proof, 16SWG CRCA sheet steel enclosure Powder coatedFor further details, refer technical specifications and scope of work. |
| 7 | SITC of Air Handling Unit for CBSITC of Air Handling Unit designed for Control RoomCapacity: 25000 cfmEach unit shall be complete with the Pre filter, Fine filter, Cooling coil section of copper tubes, aluminum fins, Fan section with DIDW Centrifugal fan, High efficiency \"IE3\" squirrel cage induction motor, V-Belt drive package, Supporting arrangement comprising of supporting GI rods, GI channels, dash fasteners & vibration isolators, Connection to be provided with Existing duct for Control Room and Fresh air duct.Three (3) set of filters shall be provided by contractor separately along with 25000 CFM AHU Three (3) set of Belts shall be provided by contractor separately along with 25000 CFM AHUFor further details, refer technical specifications and scope of work. |
| 8 | SITC of AHU designed for Office Room CBSITC of Air Handling Unit designed for Office rooms in Control Room BuildingCapacity: 7000 cfmEach unit shall be complete with the Pre filter, Fine filter, Cooling coil section of copper tubes, aluminum fins, Fan section with DIDW Centrifugal fan, High efficiency \"IE3\" squirrel cage induction motor, V-Belt drive package, Supporting arrangement comprising of supporting GI rods, GI channels, dash fasteners & vibration isolators, Connection to be provided with Existing duct for Office space in Control Room Building and fresh air duct. Three (3) set of filters shall be provided by contractor separately along with 7000 CFM AHU Three (3) set of Belts shall be provided by contractor separately along with 7000 CFM AHU For further details, refer technical specifications and scope of work. |
| 9 | SITC of Condenser & Chilled Water Pipe<4SITC of Condenser and Chilled Water Piping for Control Room BuildingSupplying, laying/ fixing, testing and commissioning of Condenser and Chilled Water Piping of following nominal sizes inside & outside the building (with required painting, necessary supports, clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) Upto 4 Inch pipingFor further details, refer technical specifications and scope of work. |
| 10 | SITC of Condenser & Chilled Water Pipe>4SITC of Condenser and Chilled Water Piping for Control Room BuildingSupplying, laying/ fixing, testing and commissioning of Condenser and Chilled Water Piping of following nominal sizes inside & outside the building (with required painting, necessary supports, clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) above 4 Inch pipingFor further details, refer technical specifications and scope of work. |
| 11 | SITC of Chilled Water Piping InsulationSITC of Chilled Water Piping Insulation for Control Room BuildingFor chilled water line, providing and fixing with Nitrile Insulation complete with adhesive and to be seal with Alu cladding (UoM in sq mtr of pipe surface area)For further details, refer technical specifications and scope of work. |
| 12 | SITC of Balancing Valve for Control RoomSITC of Balancing Valve for Control Room BuildingSITC of 2-way pressure induced balancing and control valves for chilled water control at AHU.For further details, refer technical specifications and scope of work. |
| 13 | SITC of Stainless Steel Expansion TankSITC of Stainless Steel Expansion TankCapacity: 1000 Liters for Control Room Building Complete with outlet for system connection, overflow, make-up connection, overflow connection , drain connection, vent connection, valves and fittings as required.For further details, refer technical specifications and scope of work. |
| 14 | SITC fof Electrical Panel for CBSupply Installation Testing and Commissioning of Electrical Panel for Control Room Building Cubical type main LT panel board suitable for 3 phase, 415 V, 50Hz AC supply, Common electrical panel shall be provided containg minimum following feeders:a) 02 nos. of incomer of 1000A each, 4P with Air Circuit Breaker (ACB)b) 01 no. of Bus Coupler of 1000A, 4P with Air Circuit Breaker (ACB)c) 04 nos. of outgoing for Compressor motors of suitable rating as per design,d) 03 nos. of outgoing for condenser water pumps of suitable rating as per design,e) 03 nos. of outgoing for chilled water pumps of suitable rating as per design,f) 03 nos. of outgoing for cooling tower of suitable rating as per design,g) 02 nos. of outgoing for AHU-1 of suitable rating as per design,h) 02 nos. of outgoing for AHU-2 of suitable rating as per design,i) 07 nos. of outgoing for existing Split AC Unit of 10 KW rating,j) 04 no. of outgoing for existing strip heater of 12 KW rating,k) 02 no. of outgoing for existing Fresh Air Fan of 1.1 KW rating,l) 04 nos. of outgoing for existing Exhaust fan of 1.0 KW rating,m) 03 nos. of outgoing for existing Pan humidifier of 2.3 KW rating,n) 01 no. of outgoing for capacitor bank of suitable rating as per design for maintaining the power factor >0.95,o) 01 no. of compartment for Capacitor Bank (APFC) as per design for maintaining the power factor >0.95,p) 230 V AC to 24 V DC converter with suitable feeder of suitable rating as per design For further details, refer technical specifications and scope of work. |
| 15 | SITC of Cable work (3.5C X 150 sqmm)SITC of Cable Works for Control Room BuildingComplete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 3.5C X 150 sqmmFor further details, refer technical specifications and scope of work. |
| 16 | SITC of Cable work (3.5C X 120 sqmm)SITC of Cable Works for Control Room BuildingComplete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays / supports as required including connections on both sides as per specifications and as required. 3.5C X 120 sqmmFor further details, refer technical specifications and scope of work. |
| 17 | SITC of Cable work (3.5C X 50 sqmm)SITC of Cable Works for Control Room BuildingComplete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 3.5C X 50 sqmm.For further details, refer technical specifications and scope of work. |
| 18 | SITC of Cable work (4C X 25 sqmm)SITC of Cable Works for Control Room BuildingComplete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 4C X 25 sqmmFor further details, refer technical specifications and scope of work. |
| 19 | SITC of Cable work (4C X 10 sqmm)SITC of Cable Works for Control Room BuildingComplete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 4C X 10 sqmmFor further details, refer technical specifications and scope of work. |
| 20 | SITC of Cable work (2Cx 1.5 sqmm)SITC of Cable Works for Control Room BuildingComplete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 2C X 1.5 sqmm Flexible control wiringFor further details, refer technical specifications and scope of work. |
| 21 | SITC Perforated MS cable tray 150x50x1.6SITC Perforated MS cable trays for Control Room Building 150mm (W) x 50mm (D) x 1.6 mm thicknessFor further details, refer technical specifications and scope of work. |
| 22 | SITC Perforated MS cable tray 300x50x1.6SITC Perforated MS cable trays for Control Room Building 300mm (W) x 50mm (D) x 1.6 m thicknessFor further details, refer technical specifications and scope of work. |
| 23 | SITC Perforated MS cable trays 600x50x2SITC Perforated MS cable trays for Control Room Building 600mm (W) x 50mm (D) x 2.0 mm thicknessFor further details, refer technical specifications and scope of work. |
| 24 | SITC of GI Strip, 25x4 mmSITC of GI Strip, 25mm x 4mmFor further details, refer technical specifications and scope of work. |
| 25 | SITC of PLC Based Control Unit for CBSITC of PLC Based Control Unit for Control Room BuildingFor further details, refer technical specifications and scope of work. |
| 26 | SITC of Civil work for CBSITC of Civil work during the execuation for Control Room BuildingFor further details, refer technical specifications and scope of work. |
| 27 | Providing temporary cooling arrangementProviding of temporary cooling arrangement for Office space in Control Room Building as per SOWFor further details, refer technical specifications and scope of work. |
| 28 | SITC of HVAC OF ADMINISTRATIVE BUILDING |
| 29 | SITC of Water Cooled Screw compressor ABSITC of Water Cooled Screw compressor for Administrative BuildingSupply, Installation, Testing and Commissioning of Water Cooled Screw compressor,Capacity 110TR (upto+10%), With Eco-friendly refrigerant (like R134a). Each Unit Shall be complete with motor, Water cooled Condenser, Water chiller with standard accessories refrigerant piping, fittings, valves, etc. as requiredFor further details, refer technical specifications and scope of work. |
| 30 | SITC of Condensor Water Pump Set for ABSITC of Condensor Water Pump Set for Administrative building,Head: Mininmum 36 MtrsEach Unit Shall be capable of delivering complete with Gate valves, NRV, Y-Type Strainer, Mechanical seal, Motor, Pressure gauges with isolation valve, Mounting frame with antivibration pads, RCC/ cement concrete foundationFor further details, refer technical specifications and scope of work. |
| 31 | SITC of Chiller Water Pump Set for ABSITC of Chiller Water Pump Set for Administrative building,Head: Minimum 27 MtrsEach Unit Shall be complete with Gate valves, NRV, Y-Type Strainer, Mechanical seal, Motor, Pressure gauges with isolation valve, Mounting frame with antivibration pads, RCC/ cement concrete foundation, Insulation cladded with Aluminium sheet,For further details, refer technical specifications and scope of work. |
| 32 | SITC of FRP Cooling Tower designed fr ABSITC of FRP Cooling Tower designed for Administrative buildingCapaicty: Minimum 150 TR.Unit shall be complete with FRP water basin, PVC fillings with integral louvers and drifteliminators complete with hot water basin either fitted with dynamically balanced axial flow type fan-direct driven or driven through reduction gear box with TEFC induction motor, suction screen, make up quick fill arrangement, overflow and drain connections with necessary valves and suitable inspection ladder, motor, access arrangement for cooling tower interior, cement concrete foundation, steel/ masonry supporting structure, anti-vibration mountings etc. complete as per specifications and as required. Each shall be provided with MCB isolator in weather proof, 16SWG CRCA sheet steel enclosure Powder coatedFor further details, refer technical specifications and scope of work. |
| 33 | SITC of Air Handling Unit designed fr ABSITC of Air Handling Unit designed for Administrative building,Capacity: 18000 cfmEach unit shall be complete with the Pre filter, Fine filter, Cooling coil section of coppertubes, aluminum fins, Fan section with DIDW Centrifugal fan, High efficiency \"IE3\" squirrel cage induction motor, V-Belt drive package, Supporting arrangement comprising of supporting GI rods, GI channels, dash fasteners & vibration isolators, Connection to be provided with Existing duct used for Administrative Building Office space Three (3) set of filters shall be provided by contractor separately along with 18000 CFM AHU Three (3) set of Belts shall be provided by contractor separately along with 18000 CFM AHUFor further details, refer technical specifications and scope of work. |
| 34 | SITC of Condenser&Chilled Water Pipe<4SITC of Condenser and Chilled Water Piping for Administrative buildingSupplying, laying/ fixing, testing and commissioning of Condenser and Chilled Water Piping of following nominal sizes inside & outside the building (with required painting, necessary supports, clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) Upto 4 Inch pipingFor further details, refer technical specifications and scope of work. |
| 35 | SITC of Condenser&Chilled Water Pipe>4SITC of Condenser and Chilled Water Piping for Administrative buildingSupplying, laying/ fixing, testing and commissioning of Condenser and Chilled Water Piping of following nominal sizes inside & outside the building (with required painting, necessary supports, clamps, vibration isolators and fittings but excluding valves, strainers, gauges etc.) above 4 Inch pipingFor further details, refer technical specifications and scope of work. |
| 36 | SITC of Chilled Water Piping InsulationSITC of Chilled Water Piping Insulation for Administrative buildingFor chilled water line, providing and fixing with Nitrile Insulation complete with adhesive and to be seal with Alu cladding (UoM in sq mtr of pipe surface area)For further details, refer technical specifications and scope of work. |
| 37 | SITC of Balancing Valve for ABSITC of Balancing Valve for Administrative buildingSITC of 2-way pressure induced balancing and control valves for chilled water control at AHU.For further details, refer technical specifications and scope of work. |
| 38 | SITC of Stainless Steel Expansion TankSITC of Stainless Steel Expansion Tank,Capacity: 1000 Liters for Administrative buildingComplete with outlet for system connection, overflow, make-up connection, overflowconnection, drain connection, vent connection, valves and fittings as required.For further details, refer technical specifications and scope of work. |
| 39 | SITC of Electrical Panel for ABSupply Installation Testing and Commissioning of Electrical Panel for Administrative Building Cubical type main LT panel board suitable for 3 phase, 415 V, 50Hz AC supply, Common electrical panel shall be provided containg minimum following feeders:a) 02 nos. of incomer of 1000A each, 4P with Air Circuit Breaker (ACB)b) 01 no. of Bus Coupler of 1000A, 4P with Air Circuit Breaker (ACB)c) 03 nos. of outgoing for Compressor motors of suitable rating as per design,d) 03 nos. of outgoing for condenser water pumps of suitable rating as per design,e) 03 nos. of outgoing for chilled water pumps of suitable rating as per design,f) 02 nos. of outgoing for cooling tower of suitable rating as per design,g) 02 nos. of outgoing for AHU of suitable rating as per design,i) 02 nos. of outgoing for existing Split AC Unit of 10 KW rating,j) 08 no. of outgoing for existing strip heater of 12 KW rating,k) 02 no. of outgoing for existing Fresh Air Fan of 1.1 KW rating,l) 02 nos. of outgoing for existing Pan humidifier of 2.3 KW rating,m) 02 nos. of outgoing for existing Exhaust fan of 5 KW rating,n) 01 no. of outgoing for existing Solar PV System of 30 KW rating,o) 01 no. of outgoing for capacitor bank of suitable rating as per design for maintaining the power factor >0.95,p) 01 no. of compartment for Capacitor Bank (APFC) as per design for maintaining the power factor >0.95,q) 230 V AC to 24 V DC converter with suitable feeder of suitable rating as per designFor further details, refer technical specifications and scope of work. |
| 40 | SITC of Cable Works (3.5Cx150sqmm)SITC of Cable Works for Administrative BuildingComplete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 3.5C X 150 sqmmFor further details, refer technical specifications and scope of work. |
| 41 | SITC of cable work (3.5Cx120sqmm)SITC of Cable Works for Administrative BuildingComplete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 3.5C X 120 sqmmFor further details, refer technical specifications and scope of work. |
| 42 | SITC of Cable work (3.5C X 50 sqmm)SITC of Cable Works for Control Room BuildingComplete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 3.5C X 50 sqmmFor further details, refer technical specifications and scope of work. |
| 43 | SITC of Cable work (4C X 25 sqmm)SITC of Cable Works for Administrative BuildingComplete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 4C X 25 sqmmFor further details, refer technical specifications and scope of work. |
| 44 | SITC of Cable work (4C X 10 sqmm)SITC of Cable Works for Administrative BuildingComplete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 4C X 10 sqmmFor further details, refer technical specifications and scope of work. |
| 45 | SITC of Cable work (2C x 1.5 sqmm)SITC of Cable Works for Administrative BuildingComplete cable work using XLPE insulated PVC sheathed steel tape/wire armored underground aluminum conductor cables of following sizes for electric Supply from main panel in AC Plant Room, to various loads including interconnections from starters to motors on suitable cable trays/supports as required including connections on both sides as per specifications and as required. 2C X 1.5 sqmm Flexible control wiringFor further details, refer technical specifications and scope of work. |
| 46 | SITC Perforated MS cable tray 150x50x1.6SITC Perforated MS cable trays for Administrative Building 150mm (W) x 50mm (D) x 1.6 mm thicknessFor further details, refer technical specifications and scope of work. |
| 47 | SITC Perforated MS cable tray 300x50x1.6SITC Perforated MS cable trays for Administrative Building 300mm (W) x 50mm (D) x 1.6 m thicknessFor further details, refer technical specifications and scope of work. |
| 48 | SITC Perforated MS cable trays 600x50x2SITC Perforated MS cable trays for Administrative Building 600mm (W) x 50mm (D) x 2.0 mm thicknessFor further details, refer technical specifications and scope of work. |
| 49 | SITC of GI Strip, 25x4 mmSITC of GI Strip, 25mm x 4mmFor further details, refer technical specifications and scope of work. |
| 50 | SITC of PLC Based Control Unit for ABSITC of PLC Based Control Unit for Administrative BuildingFor further details, refer technical specifications and scope of work. |
| 51 | SITC of Civil work during the execut ABSITC of Civil work during the execuation for Administrative BuildingFor further details, refer technical specifications and scope of work. |
| 52 | Providing temporary cooling arrangementProviding of temporary cooling arrangement for Office space in Administrative BuildingFor further details, refer technical specifications and scope of work. |
| 53 | Part-B (Service Visit During Warranty Period) |
| 54 | Monthly Service visit during Warranty ABMonthly Service visit during Warranty Period for Administartive BuildingFor further details, refer technical specifications and scope of work. |
| 55 | Monthly Service visit during WarrantyMonthly Service visit during Warranty Period for Control Room BuildingFor further details, refer technical specifications and scope of work. |
| 56 | Part-C (AMC for both buildings) |
| 57 | AMC for 3 years for Administartive BuildQuaterly Service visit during Comprehensive AMC for 3 years for Administartive BuildingFor further details, refer technical specifications and scope of work. |
| 58 | AMC for 3 years for Control Room BuildingQuaterly Service visit during Comprehensive AMC for 3 years for Control Room BuildingFor further details, refer technical specifications and scope of work. |
| 59 | Part-D (Buy-back for both equipment’s) |
| 60 | Buy back value for Old Equipment of Administrative BuildingFor further details, refer technical specifications and scope of work. |
| 61 | Buy back value for Old Equipment of Control Room BuildingFor further details, refer technical specifications and scope of work. |
| 62 | The Bid will be further evaluated in accordance with clause 28 of SCC as per the following Formula:The Bid will be evaluated as per the following Formula:Quoted Rate for SOR Item Part-A (SITC of Both buildings) + SOR Item Part-B (Service Visit During Warranty Period) + SOR Item Part-C (AMC for both buildings) + (-) SOR Item Part-D (Buy-back for both equipment’s) + Differential operating cost for control Room Building (E1) + Differential operating cost for Administrative Building (E2)1) E1= Differential operating cost for control Room Building; as defined hereunderE1= F1 x C x Y1, Where: F1 = Total Equipment load for equipment’s installed in Control Room Building at Full load (i.e. at 110 TR) in kw to be declared by the bidderC = Cost of Energy, Rupees 10.00 per kw-hrY 1= Number of hours for which loading is to be done for Control room building i.e. in 5 Years considering 24 hours operation i.e. 5X365X24 =43800 hours2) E2= Differential operating cost for Administrative Building; as defined hereunderE2= F2 x C x Y2, Where: F2 = Total Equipment load for equipment’s installed in Administrative Building at Full load (i.e. at 110 TR) in kw to be declared by the bidderC = Cost of Energy, Rupees 10.00 per kw-hr Y 2= Number of hours for which loading is to be done for Administrative building i.e. in 5 Years considering 8 Hrs. operation (office time) and Total working days [365 (Total days in a year)-[52 (Sundays) +24 (Saturdays) +13 (Holidays)]=276 daysi.e. 5X276X8 = 11040 hoursTotal Equipment load at Full load (i.e. at 110 TR) (F1): Note: In case during site performance test, total equipment load exceeds the stipulated guaranteed value (individual equipment load) at then prevailing condition /given conditions, the subject package or part of it will get rejected and amount will be recovered from CPBG. |
| 63 | Control Room Building: Screw Compressor (110TR) |
| 64 | Control Room Building: Condenser Water Pump (36 Mfs) |
| 65 | Control Room Building: Chilled Water Pump (27 Mfs) |
| 66 | Control Room Building: Cooling Tower (150TR) |
| 67 | Control Room Building: AHU-1 (700 cfm) |
| 68 | Control Room Building: AHU-2 (25000 cfm) |
| 69 | Administrative Building: Screw Compressor (110TR) |
| 70 | Administrative Building: Condenser Water Pump (36 Mfs) |
| 71 | Administrative Building: Chilled Water Pump (27 Mfs) |
| 72 | Administrative Building: Cooling Tower (150TR) |
| 73 | Administrative Building: AHU (18000 cfm) |