|
| 1 | SUPPLY & INSTALLATION OF NEW EQUIPMENTProviding and fixing Spring Rocker (Single Seat Type) made of MS circular pipe, complete with heavy duty spring, anchoring, surface preparation, primer and two coats of PU paint, including installation complete as per direction of Engineer-in-Charge. |
| 2 | Providing and fixing Spring Rocker (Van Type) complete with MS frame, seating arrangement, anchoring and PU painting, including installation complete. |
| 3 | Providing and fixing Small Slide, FRP sliding surface 8mm thick with MS support frame, ladder, handrails, anchoring and PU painting complete. |
| 4 | Providing and fixing Big Slide, FRP sliding surface 8mm thick with MS support structure, ladder, handrails, anchoring and PU painting complete. |
| 5 | Providing and fixing Basket Ball Swing, complete with MS structure, seating arrangement, anchoring and PU painting complete. |
| 6 | Providing and fixing Merry-Go-Round (Duck Type), MS fabricated structure with seating, rotating mechanism, anchoring and PU painting complete. |
| 7 | Providing and fixing Merry-Go-Round (Round Type), MS fabricated structure with seating, rotating mechanism, anchoring and PU painting complete. |
| 8 | Providing and fixing Swing Two Seater (Round Type) with MS frame, chains, seats, anchoring and PU painting complete. |
| 9 | FIXING / REPAIR / ACCESSORY ITEMSProviding and fixing Walking Roller Handle made of MS circular pipe with clamps and grips, including PU painting complete. |
| 10 | Providing and fixing Wooden Bridge Replacement, wooden logs of 3″ thickness with MS frame, including fixing complete. |
| 11 | Providing and fixing Climbing Net, complete set of ropes and clamps including fixing. |
| 12 | Providing and fixing Teeter Totter Seats, fibre seats 8mm thick including packing and fixing complete. |
| 13 | Repairing MS Platform, size approx. 8 ft × 4 ft, including strengthening, welding and PU painting complete. |
| 14 | Providing and fixing Heavy Duty Roller Slider, hard plastic 10mm thick, multicolour, complete. |
| 15 | Providing and fixing Sliding Swing Climbing Stairs, MS circular pipe structure with safety grip marks and PU painting complete. |
| 16 | Spray Painting on All Equipment, using non-toxic PU paint including surface preparation complete. |
| 17 | Providing and laying Artificial Grass for Landing Area, 20mm pile height including fixing complete. |
| 18 | JOB WORKSSliding Swing Bottom Repair, MS rectangular section approx. 4 ft length (5 Nos), including welding and PU painting complete. |
| 19 | Welding work at site including cutting and fixing complete. |
| 20 | Removing old damaged items including dismantling and disposal complete. |
| 21 | Refixing of equipment after repair including alignment and anchoring complete. |
| 22 | Transportation of materials, loading, unloading and carriage complete. |