| 1 | EXECUTION OF WORK UNDER PROVIDING FENCING TO SONHERI MASJID AT VIJAYAPURA FOR THE YEAR 2025-26. |
| 2 | Providing and Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. Complete all as per the direction of site in charge. |
| 3 | Providing the Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Complete as per the direction of site in charge. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:5:10 (1 Cement : 5 coarse sand zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) .Complete as per the direction of site incharge. |
| 5 | Providing the Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level. Complete as per the direction of site incharge. |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses,parapets, coping, bed blocks, anchor blocks, plain window sills, fillets,sunken floor etc., up to floor five level, 1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources), Excluding the cost of centering,,shuttering and finishing. Complete as per the direction of site incharge. |
| 7 | Providing the Coursed rubble masonry (second sort) with hard stone in foundation & plinth with : 7.7.1 Cement mortar 1:6 (1 cement : 6 coarse sand). Complete as per the direction of site incharge. |
| 8 | Provision for providing the Structural steel work including riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (MS Angle 50X50X5 MM & MS Flat Iron 25X6 mm for support to chain link fencing). Complete as per the direction of site incharge. |
| 9 | Providing and Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : 13.61.1 Two or more coats on new work |