| 1 | EXECUTION OF WORK OF PROVIDINGM.S. GRILL COMPOUND WALL AND APPROACH PATHWAY TO RACHI GUDI AT AIHOLE FOR THE YEAR 2025-26. |
| 2 | Earth work in hard soil excavation bymanual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. |
| 3 | PCC1:4:8 (1 cement : 4 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 8 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA)) |
| 4 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 5 | Coursed rubble masonry with hard stonein superstructure above plinth level and upto floor five level. Masonry work (first sort), in cement mortar 1:6 (1 cement : 6 coarse sand |
| 6 | Red stone ,Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick in Cement mortar 1:6 (1 cement : 6 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade. |
| 7 | Earth work in surface excavation for pathway in Hard soilnot exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting outand disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: |
| 8 | Provision for providing & laying sand stone flooring/pathwayfrom main gate totemple ofRachi Gudi, ramp, landingin LM.1:6 using slab sand 1.0x0.50 fixing fine jointing proper gradient slope etc. complete. All as per specification and as directed by engineer-in-charge. |
| 9 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade. |
| 10 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (MS Angle 50X50X5 MM for support to chain link fencing) DSR 2023 Vol-1 Code no. 10.1Pg. no . 170 (Frame size- 2.75 X 1.23) |
| 11 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work. |
| 12 | Provision for recess pointing using Lime mortar to the enclosure wall and flooring surface wherever missing and necessary all around the exterior and interior part of the enclosure wall including cleaning the surface and removing all dirt fungi lichen other foreign substance, cost of materials labour, curing etc. complete |