|
| 1 | Taking out / removal of existing Broken / damaged M.S Angle with Chain link fencing frame & gate including cutting & stacking the proper place and transportation charge load up to lead 15 km . etc complete. |
| 2 | Taking out / removal of existing bulged / out of plumb stone Masonry wall sorting out the serviceable material & stacking the proper place for reuse & disposal the unserviceable material by head load up to lead 100 mtr. etc complete |
| 3 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering - All work up to plinth level with 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources |
| 5 | Provision for construction wall with Coursed Rubble Stone /bela stone masonry in cement mortar 1:6 (1 cement: 6 coarse sand) with an admixture of pigment matching the stone shade, finishing, placing in position, curing etc. complete. |
| 6 | Provission for Providing & Flixing Sand Stone 60 mm thick fine dressed stone flooring/ Copingwork laid over 20mm thick (average) cement mortar 1:5 (1 cement : 5 coarse sand) including pointing with cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shadeetc complete in all Respect. |
| 7 | Providing & fixing the M.S Gate with Angle iron 50x50x6mm shutter & 16 mm squire bar 10 cm c/c distance & fixing them in .Rolled Steel Channels ( 125 x 50) mm size as per drawing & design including Painting two or more coat with syntactic enamel paint over red Oxide primer & fixing the lime cement mortor & transformation Charges with loading / unloading etc Complete |
| 8 | Providing & fixing the M.S Railing inMS Iron Angle 50x50x6mm Frame & 16 mm squire bar 10 cm c/c distancewithDecorative Arrow & fixing them in as per drawing & design including Painting two or more coat with syntactic enamel paint over red Oxide primer & fixing thecement mortar & transformation Charges with loading / unloading etc Complete |
| 9 | Raking out Joins in lime or Cement Mortar and preparing the surface for re- pointing or plastering includingdisposal of rubbish to the dumping ground, all complete as per direction of engineer in charge etc complete in all respect. |
| 10 | Ruled / flush pointing on sand stone masonry surface with lime, surkhi and marble dust mortar in the ratio of1:1.5:1/2 ( 1 lime:1.5 surkhi:1:2 Dust) as per Matching with structure mixed with adhesive material etc complete in all respect |
| 11 | Provision for solar street lights (All in one Solar Street lights) 24 watt in the premises of temple fixed parallel on the way to temple including solar panels, LED Lights and Good quality battery 240 WH, with long life warranty including all materials, labors, T & Ps etc. all complete. |
| 12 | Providing and fixing Retro reflecting direction board at acces point of highway/ roads ( size 1.20 x 0.90 mtr.) outer frame 65mm dia stainless steel pipe grade 304 with and inner frame 40 mm dia SS Pipe with 2 mm thick Aluminium sheet fixed in frame with blue back ground and text in white colour both side complete with labour and material as per design and drawing attached |
| 13 | Provision for making, supplying and fixing of stone benches of size 6’3” long X 2’0” Wide X 1’3” high using sand stones from dhangadhra quarry including all materials, labours for cutting, dressing, moulding, carving, fixing and transportation up to monument etc. All complete as per the approved design supplied by architect. |
| 14 | Provision for making, supplying and fixing of stone dustbins of size 2’0” X 2’0” X 3’4” High using sand stones from dhangadhra quarry and 18 Gauge stainless steel bin of grade 316 for waste collection including all materials, labours for cutting, dressing, moulding, carving, fixing and transportation up to monument etc, all complete as per the approved design supplied by architect. |
| 15 | Providing and fixing the Security Cabin with Customised FRP cabin of Size 8 X 8 X 7with exhaust window covered with iron grills, necessary electricity wiring and installation of switch board for electricity. Making the Platform in Cement Concrete etc complete. |