|
| 1 | Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material lead up to 50 mt and lift up to 1.5 mt, disposed material to be neatly dressed.Disposal of excavated mula/unserviceable material including loading unloading and transportation charges up to 5km from the site by mechanical mean of transport.(pre check measures should be done before execution ) |
| 2 | Towards the provision for preparation of beds for hedging/ edging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with slidge or manure in the ratio of 8:1(8parts of stacked volume of earth after reducing 20%:one part of stacked volume or manure after reduction 8%) flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materualsdeclared unserviceable and surplus earth by spreading and levelling as directed with in the 50m, lift up to 1.5m complete(cost of sludge, manure or extra earth to be paid for saparately). |
| 3 | Towards the provision for supplying and stacking of good earth /agricultural soil at site including royalty and carriage up to 15 km lead complete (earth measured in stacks will be reduced 20% for payment). |
| 4 | Towards the provision for supplying and stacking of organic fertilizers / fertilizers at site including royalty and carriage up to 15 km lead complete (earth measured in stacks will be reduced 8% for payment). |
| 5 | Towards the provision of Rough dressingthe trenched/excavated in cluding braking clods . |
| 6 | Towards the provision for spreading of good earth and organic fertilizers/manure. |
| 7 | Towards the provision for mixing of good earth and organic manure. |
| 8 | Towards the provision for flooding of area by making kiaries for settlement of good earth for compacting the area.. |
| 9 | Towards the provision for uprooting weedsfrom the ground after 10-15 days of flooding with water including disposal of uprooted vegetation.(precheck measures should be done before execution) |
| 10 | Towards the provision for fine dressingof the area. |
| 11 | Towards the provision for supply of well-developed healthy, weed free rooted natural grass turf (Doob grass)as pr localmarket rate |
| 12 | Towards the provision for grassing/ laying of natural turf grass at site as per direction of the site incharge. |
| 13 | Towards the provision for supply of trees/ shrubs/hedge plants(A) Plumeria 5-6 \" height well developed white, yellow, Red |
| 14 | Areca Palm 3-4 \" in Polybag |
| 15 | Money plants with moss stick well developed |
| 16 | Ixora Spcs.(for planting in the beds) |
| 17 | Canna indica (Keli) of various color of flower |
| 18 | Kaner 2.5-3\" in PB |
| 19 | Calandra 3-4\" in PB |
| 20 | Hibiscus |
| 21 | Acalypha plants2.5-3\" in PB (for planting in beds) |
| 22 | TMC (Single) |
| 23 | Mogra in PB well developed |
| 24 | Towards the provision for supply of well-developed hedge plants having the height of 1.1.5 feet in polybag. |
| 25 | Plantation of Hedge plants. |