| 1 | Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20\"g in deptk and earthwork in embankment to be in 20 cm (8\") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100\") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer-in-charee. |
| 2 | (GSB) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification clause 401. |
| 3 | WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming Crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading II as per Technical Specification Clause 405 (Sr. 4.8) |
| 4 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming Crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 (Sr. 4.8) |
| 5 | Providing and applying primer coat with emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 6 | Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 7 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Hotmix plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. |
| 8 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat By Hotmix Plant. |
| 9 | Brick edging on both sides of roads of 1st class brick 8cm(3\")wide & 12 cm (4.50\")deep laid with mud mortor including labour & suplly of brick finished to required templete and in proper alignment and also includingdressing & ramming the excavated earth including all labour T&P sudries required for comption of work with material |
| 10 | S/F of signboard as per direction of engineer in charge |
| 11 | Brick soling with Straigh Over Burnt bricks laid on edge (S.O.B.) & dry including preperation of subgrade to prescribed camber filling ,joints with local earth spreading blinding coat 1 cm depth of local earth over entire surface &including labour and T&P etc required for proper completion of work 100 sft. preperation of subgrade |
| 12 | Excavation in foundation in ordenary soile excaveted earth to be in the form of regular pits not exceeding 11/2m,in depth and earth work in embankment to be 20cm. Layer including dresing,ramming and watering the surface of the required lavel and stopes and also including 1.5cm lift and 30m lead the earth from cutting to be used in making embankment or to be deposited as spoilbank with 30m distance and also i/c 8.00 km catage . Including royalty &9.00/cum |
| 13 | Providing and laying cement concrete 1:4:8 (1 cement :4 Course sand :8 graded stone ballast 40 mm nominal size) including supply of all materials . Labour and T@P etc. Required for proper completion of the work and complete , also including coat of formwork in foundation.(SCH 281) |
| 14 | M150 brick work in 1:4(1 cement and 4 coars sand) mortar in foundation including suplly of all materials . Labour and T&P etc. Required for proper completion of the work and complete.(305b) |
| 15 | 12 mm thick plaster 1:4 cement and coarse sand including supply of all material,labourT&P … etc. required for paper wall, outer wall, and parapet completion of work . (S.I. No. 583+Diff) |
| 16 | Providing ald laying cement concrete 1:2:4 (1 cement: 2 course sand :4 stone grit 20mm) including of supply of all materials labour and T&P etc. require for proper completion of work and curring complete also including cost from work in foundation and floor. (S.I. 279B) |
| 17 | S/L of NP3 Hume pipe including fixing of collar with 1:2 ccement motar as per MORD/MORTH specification.Dia 600mm Dia Pipe |
| 18 | The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0% |
| 19 | The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75% |
| 20 | The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.50% |
| 21 | The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25% |
| 22 | The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00% Please Enable Macros to View BoQ information |