| 1 | Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20\"g in deptk and earthwork in embankment to be in 20 cm (8\") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100\") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer-in-charee. |
| 2 | WBM Grading - II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 80-100 Kn in stages to proper grade and camber, applying and brooming Crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading II as per Technical Specification Clause 405 (Sr. 4.8) |
| 3 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming Crushable screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 (Sr. 4.8) |
| 4 | Providing and applying primer coat with emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 5 | Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 6 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Hotmix plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. |
| 7 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat By Hotmix Plant. |
| 8 | Brick edging on both sides of roads of 1st class brick 8cm(3\")wide & 12 cm (4.50\")deep laid with mud mortor including labour & suplly of brick finished to required templete and in proper alignment and also includingdressing & ramming the excavated earth including all labour T&P sudries required for comption of work with material |
| 9 | S/F of signboard as per direction of engineer in charge |
| 10 | S/L of NP3 Hume pipe including fixing of collar with 1:2 ccement motar as per MORD/MORTH specification.Dia 350mm Dia Pipe |
| 11 | Brick soling with Straigh Over Burnt bricks laid on edge (S.O.B.) & dry including preperation of subgrade to prescribed camber filling ,joints with local earth spreading blinding coat 1 cm depth of local earth over entire surface &including labour and T&P etc required for proper completion of work 100 sft. preperation of subgrade |
| 12 | The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0% |
| 13 | The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75% |
| 14 | The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.50% |
| 15 | The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25% |
| 16 | The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00% Please Enable Macros to View BoQ information |