| 1 | fo|qr forj.k [k.M&cqyUn\"kgj ¼xzkeh.k½] ds vUrxZr fo0fo0m0[k0&izFke vkSjxkackn ,oa f}rh; VkaM+k cqyUn\"kgj ds dk;Z{ks= esa iqokZuqeku dks ns[krs gq, ¼nSoh; vkink½ ls mRiUu gksus ,oa vkdfLed@vkikrdkyhu czsdMkmu dh fLFkfr esa ;Fkk”kh?kz vVS.M dj fo|qr vkiwfrZ O;oLFkk lqpk: j[kus laca/kh dk;ZA |
| 2 | Carmage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres 2 at both ends, roquried for proper completion of work, distance about to 50Kms. |
| 3 | PCC Pole 8.5/09 mtr Long. |
| 4 | PCC Pole 11/13 mtr Long. |
| 5 | Carriage of All line Material from store to je store Sub station/at site of work as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. |
| 6 | Erection of pole 8.5/09 mtr long support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 7 | Erection of pole 11/13 mtr long support including complete fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 8 | Grouting of pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8-30x3030 cms, including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour. T&P and camer etc. required for proper completion of work. |
| 9 | Laying, sagging Stringing and binding and jumpering of ACSR Weasel conductoron the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 10 | Carriage of ABC Cable diffrent size the newly erected pole as per RESPO manual and as per direction of supervising engineer, it includes the cost of labour, T&P, carrier etc requried for proper completion of work |
| 11 | 3x50+1x35+1x16 Sq mm AB Cable |
| 12 | 3x95+1x35+1x16 Sq mm AB Cable |
| 13 | 3x120+1x95-1x16 Sq mm All Cable |
| 14 | fixing of Stay rod with Stay wire in proper way with Nozelling. |
| 15 | Laying 3x50+1x35+1x16 Sq mm AB Cable |
| 16 | Laying 3x95+1x35+1x16 Sq mm All Cable |
| 17 | Laying 3x120+1x95+1x16 Sq mm AB Cable |
| 18 | Grouting of Stay rods |
| 19 | 11 & 33 Kv Pin Insulator Polymeric |
| 20 | 11 & 33 Kv Disc Insulator with fitting Polymeric |
| 21 | Work of Straight Bended 11 & 33 KV X-Arm/Angle/Channel |
| 22 | Making of DP of the Damaged/Brokon 8.5/9.11 mtr PCC pole with Angle, Channel, fuse Set, Pin & Dise, clamp etc. |
| 23 | Carriage & Mounting of 10KVA/25KVA/63KVA/100KVA Transfoner or double pole. |
| 24 | Dismantling Damage T/F from site to esc store. |
| 25 | Straingthening of Tillted ST/PCC Pole. |
| 26 | Welding with MS Angle/Channel of Rusted/Damage ST Pole. |
| 27 | Resaging of Damage & Loose HT/LT Line. |
| 28 | All Type pole/Conducter/MS Iron Received Back From Different Sites to Store |
| 29 | The folloing material is required to be Providing & Fixing by contractor. |
| 30 | 11 & 33 KV F bracket |
| 31 | Holdoing Clamps With Nuit & Bolt |
| 32 | LT Shakle insilator |
| 33 | Ded end Clamps with Gl hook |
| 34 | Suspention clamps with Gi hook |
| 35 | MS nut & Bolt off size. Please Enable Macros to View BoQ information |