|
| 1 | 90 H.P |
| 2 | 60 H.P |
| 3 | 50 H.P |
| 4 | 25 H.P |
| 5 | 12.5 H.P |
| 6 | 10 H.P |
| 7 | 7.5 H.P |
| 8 | 5 H.P |
| 9 | 2 H.P |
| 10 | 1/2 H.P |
| 11 | Supply of Bearing No. 6318 |
| 12 | Supply of Bearing No.7322 |
| 13 | Supply of Bearing No. 6316 |
| 14 | Supply of Bearing No.7320.13 |
| 15 | Repairing of 90 HP V.T. Pumps -Dismantling and repairing and erection of following capacity v.t. pumps with bowl assembly , column pipe ,shaft, bearing ,bushing as par sapplied including all cost of skilled labour, Transportation, Loading unloading and all applicable Taxes (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote) |
| 16 | Repairing of 60 HP V.T. Pumps -Dismantling and repairing and erection of following capacity v.t. pumps with bowl assembly , column pipe ,shaft, bearing ,bushing as par sapplied including all cost of skilled labour, Transportation, Loading unloading and all applicable Taxes (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote) |
| 17 | Supply Of Various Parts For 90 H.P Pump Stuffing box bronze bushing. |
| 18 | Supply Of Various Parts For 90 H.P Pump Gland sleeve S/S material. |
| 19 | Supply Of Various Parts For 90 H.P Pump Top bowl repair with providing and welding of M.S. Flange heavy duty with required sundry etc. |
| 20 | Supply Of Various Parts For 90 H.P Pump Column pipe repair with welding if ribs M.S. flange with machining etc. |
| 21 | Supply Of Various Parts For 90 H.P Pump Rubber Bush |
| 22 | Supply Of Various Parts For 90 H.P Pump Shaft Sleeve S/S material |
| 23 | Supply Of Various Parts For 90 H.P Pump Providing and fixing special strengthening heavy duty nut bolts. |
| 24 | Supply Of Various Parts For 90 H.P Pump Rubber packing (Chanmpion) |
| 25 | Supply Of Various Parts For 90 H.P Pump Neck ring brass. |
| 26 | Supply Of Various Parts For 90 H.P Pump Bowl bush rubber. |
| 27 | Supply Of Various Parts For 90 H.P Pump bowl bush brass. |
| 28 | Supply Of Various Parts For 90 H.P Pump Impeller. |
| 29 | Supply Of Various Parts For 90 H.P Pump Impeller Turning |
| 30 | Supply Of Various Parts For 90 H.P Pump Spider bushing |
| 31 | Supply Of Various Parts For 90 H.P Pump Bowl assembly fitting |
| 32 | Supply Of Various Parts For 60 H.P Pump Stuffing box bronze bushing. |
| 33 | Supply Of Various Parts For 60 H.P Pump Gland sleeve S/S material. |
| 34 | Supply Of Various Parts For 60 H.P Pump Top bowl repair with providing and welding of M.S. Flange heavy duty with required sundry etc. |
| 35 | Supply Of Various Parts For 60 H.P Pump Rubber Bush |
| 36 | Supply Of Various Parts For 60 H.P Pump Shaft Sleeve S/S material |
| 37 | Supply Of Various Parts For 60 H.P Pump Providing and fixing special strengthening heavy duty nut bolts. |
| 38 | Supply Of Various Parts For 60 H.P Pump Rubber packing (Chanmpion) |
| 39 | Supply Of Various Parts For 60 H.P Pump Neck ring brass. |
| 40 | Supply Of Various Parts For 60 H.P Pump Bowl bush rubber. |
| 41 | Supply Of Various Parts For 60 H.P Pump bowl bush brass. |
| 42 | Supply Of Various Parts For 60 H.P Pump Impeller. |
| 43 | Supply Of Various Parts For 60 H.P Pump Impeller qualate. |
| 44 | Supply Of Various Parts For 60 H.P Pump Spider bushing |
| 45 | Supply Of Various Parts For 60 H.P Pump Bowl assembly fitting |
| 46 | Repairing of starter |
| 47 | Rewinding of 90 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.) |
| 48 | Rewinding of 60 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.) |
| 49 | Rewinding of 25 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.) |
| 50 | Rewinding of 10 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.) |
| 51 | Rewinding of 7.5 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.) |
| 52 | Rewinding of 5 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.) |
| 53 | Rewinding of 3 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.) |
| 54 | Rewinding of 2 H.P. Starter Trasformer capacity with f class copper wire insulation including Air drying ,varnishing with dr. bake warmish, backtoling, including all cost of skilled labour, dismantling Trasformer transportation , loading, unloading, erection, and giving trial and testing and applicable of all Taxes. (old scrap material should tekan by contractor and cost of scrap should deduct and final offer should quote.) |
| 55 | Transformer Oil – Replacement of hevy duty of standard Transformer Oil including all cost of Trasformer Oil, transportation , erection, and all applicable Taxes. (old Transformer Oil should tekan by contractor and cost of scrap should deduct and final offer should quote.) |
| 56 | 90 HP कॉलम शॉफ्ट 40 X 1500 M.H |
| 57 | 60 HP कॉलम शॉफ्ट 40 X 1500 M.H |
| 58 | Fitter |
| 59 | Lebour |
| 60 | 4 core armoured Cable (Copper)16 sq mm |
| 61 | 4 core armoured Cable (Copper)25 sq mm |
| 62 | 4 core armoured Cable (Copper)30 sq mm |
| 63 | 4 core armoured Cable (Copper)35 sq mm |
| 64 | 4 core armoured Cable (Aluminium)16 sq mm |
| 65 | 4 core armoured Cable (Aluminium)25 sq mm |
| 66 | 4 core armoured Cable (Aluminium)30 sq mm |
| 67 | 4 core armoured Cable (Aluminium)35 sq mm |
| 68 | Bus Bar 200 A Please Enable Macros to View BoQ information |