| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 mix |
| 2 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. |
| 3 | Culvert |
| 4 | Earth work in excavation by mechanicall means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil |
| 5 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. |
| 6 | Providing and laying of stone soling duly hand packed including all carriages etc complete job. @ 85 % |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:1.5:3(1 cement : 1.5coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 11 | Foundations, footings, bases of columns etc. for mass concrete. |
| 12 | walls |
| 13 | Suspended floors, roofs, landings, balconies and access platforms |
| 14 | Edges of slabs and breaks in floors and walls Above 20 cm wide |
| 15 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Hot rolled deformed bars. |
| 16 | Supplying and Laying of RBM as Back filling behind R wall by including ramming , watering and all taxes with carriage of all material upto site of work |
| 17 | p/ fixing of 3\"\" weep holes of pvc pipes Please Enable Macros to View BoQ information |