| 1 | Dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/c. within a distance of 60mtr. |
| 2 | Earth work in surface excavation by mechanical means (Hydraulic excavator)/manual means foundation trenches or drain (not exceeding 1.5m in width or 10sqm on plan), excavated soil and disposal of surplus excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m including dressing and sides and ramming of bottoms, lift upto 1.50m including getting out the all kinds of soil. |
| 3 | Raising manhole by dismantling & refixing of manhole cover & frame including dimantling C.C. and C.C. work in 1:2:4 but excluding brick work which taken separately and all completion of work. |
| 4 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1cement : 3 coarser sand) including making joints with or without grooves (thickness of joints except ar sharp curve shall not to more than 5mm) including making drainage, opening wherever required complete etc. as per direction of Engg-in-charge (Length of finished kerb shall be measured for payment) |
| 5 | Scraping of old white or colour wash including refusal of dismantled material up to 60.0mtr distance as per direction by engg-in-charge. |
| 6 | Finishing walls with Putty approved brand and manufacture and of required shade on umdacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work. |
| 7 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undecoarated wall surface to give even shade over @ 1.25Ltr/10Sqm including one coat of primer apllied @ 0.75Ltr/10Sqm coat curing and cost of all material, labour T&P etc all complete. |
| 8 | Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w, plaster, cover, C.I. sheet, labour T&P etc required for proper completion of work. |
| 9 | Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401. |
| 10 | Supplying and filling in plinth with sand under under floors, including watering, ramming, cosolidating and dressing complete. |
| 11 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii) : 3 graded stone aggregate 200 mm nominal size |
| 12 | Cartage of materials by head load up to 90.0mtr distance including loading/unloading with all charges complete. |
| 13 | Disposal of morrum/building rubbish/malwa/similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10.00km distance with all charge complete. |
| 14 | Add 18 % G.S.T. Please Enable Macros to View BoQ information |