|
| 1 | Supply Item |
| 2 | CROSS ARM HOLDING CLAMP PCCPOLE W/O N/B(As per Specification of RESPO & UPCL) |
| 3 | STAY CLAMP WITH N&B PCC POLE8.5MTR(As per Specification of RESPO & UPCL) |
| 4 | EARTH WIRE CLAMP FOR PCC POLEWITH N/B(As per Specification of RESPO & UPCL) |
| 5 | EARTH WIRE CLAMP FOR SP-55 WITHN/B(As per Specification of RESPO & UPCL) |
| 6 | PP & CLAMP WITH N&B ST POLE SP-55(As per Specification of RESPO & UPCL) |
| 7 | SUSPENSION CLAMP WITH EYE HOOK(As per Specification of RESPO & UPCL) |
| 8 | DOUBLE POLE CLAMPS WITH N/B FORPCC POLE(As per Specification of RESPO & UPCL) |
| 9 | DOUBLE POLE CLAMPS WITH N/B FORSP-55(As per Specification of RESPO & UPCL) |
| 10 | MS CLAMP PCC WITH N/B FORSUSP.CLAMP(As per Specification of RESPO & UPCL) |
| 11 | Dead End Clamp with I Hook(As per Specification of RESPO & UPCL) |
| 12 | STAY INSULATOR(As per Specification of RESPO & UPCL) |
| 13 | DANGER BOARD(As per Specification of RESPO & UPCL) |
| 14 | LT BARE N. CONNECTOR PG CLAMP95-25mm²(As per Specification of RESPO & UPCL) |
| 15 | IPC for 120sq. mm to 120 sq mm(As per Specification of RESPO & UPCL) |
| 16 | 11 KV Fuse Set(As per Specification of RESPO & UPCL) |
| 17 | MS Clamp withN&B for PCC DeadEndClamp(As per Specification of RESPO & UPCL) |
| 18 | STAY CLAMP FOR SP-55 WITH NUT &BOLT(As per Specification of RESPO & UPCL) |
| 19 | ACB TYPE COMPLETE LT DB FOR500/400/250(As per Specification of RESPO & UPCL) |
| 20 | LT Fuse Set With Fuse Wire(As per Specification of RESPO & UPCL) |
| 21 | AL. CRIMPING TYPE LUGS 120 SQ.mm(As per Specification of RESPO & UPCL) |
| 22 | AL CRIMPING TYPE LUGS 400 SQ. mm(As per Specification of RESPO & UPCL) |
| 23 | Erection Work |
| 24 | CHEMICAL EARTHING |
| 25 | ERECTION OF EARTHING ROD |
| 26 | FABRICATION OF STEEL |
| 27 | EXCAVATION OF PIT FOR STAY SET |
| 28 | ERECTION OF LT STAY SET |
| 29 | ERECTION OF 11 KV STAY SET |
| 30 | GROUTING OF STAY SET |
| 31 | EXCAVATION OF PIT FOR POLE |
| 32 | ERECTION OF SINGLE PCC POLE |
| 33 | ERECTION OF SINGLE SP-55 POLE |
| 34 | ERECTION OF PCC DOUBLE POLE |
| 35 | ERECTION OF SP-55 DOUBLE POLE |
| 36 | GROUTING OF POLE |
| 37 | MUFFING OF POLE |
| 38 | RCC WORK OF DTR PLINTH. |
| 39 | FENCING OF DTR |
| 40 | INST. OF 250 KVA DTR ON POLESTRUCTURE |
| 41 | INST. OF 100 KVA DTR ON POLESTRUCTURE |
| 42 | INST. OF 63 KVA DTR ON POLESTRUCTURE |
| 43 | INST. OF 400/500 KVA DTR ON PLINTH |
| 44 | FIXING OF FUSE SET |
| 45 | FIXING OF LT FUSE SET |
| 46 | LAYING OF WEASEL CONDUCTOR INHT LINE |
| 47 | CARTAGE PCC POLE, 21-50 KM |
| 48 | CARTAGE SP-55 POLE, 21-50 KM |
| 49 | CARTAGE OF PETTY MATERIAL,21-50KM |
| 50 | CARTAGE OF 63 KVA DTR, 21-50 KM |
| 51 | CARTAGE OF 100 KVA DTR, 21-50 KM |
| 52 | CARTAGE OF 250 KVA DTR, 21-50 KM |
| 53 | CARTAGE OF 400/500 KVA DTR, 21-50KM |
| 54 | HEADLOAD CARTAGE PCC POLE(0-1KM) |
| 55 | HEADLOAD CARTAGE SP-55 POLE(0-1KM) |
| 56 | HEADLOAD CARTAGE OFMATERIAL(0-1 KM) |
| 57 | HEADLOAD CARTAGE OF 63 KVADTR(0-1 KM) |
| 58 | HEADLOAD CARTAGE OF 100 KVADTR(0-1 KM) |
| 59 | HEADLOAD CARTAGE OF 250 KVADTR(0-1 KM) |
| 60 | HEADLOAD CARTAGE OF 400 KVADTR(0-1 KM) |
| 61 | LAYING OF LT XLPE ABC 3X95+1X70SQ.MM |
| 62 | INST. OF DANGER BOARD/NUMBERPLATE |
| 63 | ERECTION OF LT ACB 800 A CT WITHPANEL |
| 64 | LAYING & FIXING LT XLPE CABLE Please Enable Macros to View BoQ information |