| 1 | Earthwork in excavation in foundation in ordinary soil including all lead and lift with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. |
| 2 | Providing and laying C.C 1:3:6 with coarse sand aggregate in foundation with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. |
| 3 | Brick (M-100) Work in 1:4 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. |
| 4 | Centering and shuttering for C.C. work including all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. |
| 5 | Centering and shuttering for R.C.C work including all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. |
| 6 | 12.5 mm Cement Plaster on brick masonry in 1:4 C.M. including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. |
| 7 | Providing and laying R.C.C 1:1:2 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&P But excluding cost of steel reinforcement complete all as specified and as directed by Engineer-in-charge. |
| 8 | Providing and laying C.C 1:2:4 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&P But excluding cost of steel reinforcement complete all as specified and as directed by Engineer-in-charge. |
| 9 | Steel Reinforcement with Bending, Binding, Cutting and Placing of Reinforcement including cost of Binding Wire with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. |
| 10 | S/F 75 mm dia P V C Pipe for weep holes.all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. |
| 11 | Earth Work in Filling including Llift upto 1.50m & Lead upto 200 M including Ramming & Dressing with all Cost of Material, Labour and T&P etc complete all specified and as directed by Engineer-in-charge. |
| 12 | Earthwork in Making & Removal Bundh and disposal including all Cost of Material, Labour and T&P etc complete all specified and as directed by Engineer-in-charge. |
| 13 | Finishing of walls with water proofing cement paint of approved make supreme quality of required shade on uncoated wall surface over one coat white cement primer to give even shades after thoroughly brushing the sarface to remove all dirt and remains of loose powdered materials including Curing & Cost of all material etc complete all as specified and as directed by Engineer-in-charge. |
| 14 | providing & fixing Sign board at VRB. i/c earth work, excavation, carriage, painting, letter writting and errect with c.c. i/c all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. Please Enable Macros to View BoQ information |