| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift , as directed by Engineer-incharge. a) All kinds of soil |
| 2 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres. |
| 3 | Providing and laying graded granular material (moorum) in layers not exceeding 20cm (loose) in thickness (each layer) and as directed by the Engineer-in-charge. Breaking clods, watering, consolidating each layers with power road roller 8-10 tonne, under optimum moisture content to give density not less than that specified of the maximum modified standard proctor density at OMC including levelling, fine dressing to the required camber, grade and slope etc. complete. The K-value of 30MN/M3 shall be ensured on top of this layer (payment to be made for the compacted quantity only). |
| 4 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineerin-Charge.With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 |
| 5 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. |
| 6 | Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On W.B.M. @ 0.75 Kg / sqm |
| 7 | Providing and laying bituminous macadam using crushed stone aggregatesof specified grading premixed with bituminous binder, transported to siteby tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. A). 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.50% (percentage by weight oftotal mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. |
| 8 | Providing and laying of Hot Mix Semi Dense Asphaltic Concrete (SDAC) using crushed stone aggregate of quality, size and grading as specified and stone dustas specified and Viscosity Grade Bitumen VG-30 (supplied in bulk) in proportions as per job mix formula and laid to specified levels, grade and camber as per specification, drawings and as directed by the Engineer-in- Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete. |
| 9 | Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On bituminous surface @ 0.50 Kg / sqm |
| 10 | Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. |
| 11 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete etc. as per direction of Engineerin-charge (length of finished kerb edging shall be measured to calculate volume for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 12 | Supplying and laying stone soling with stone boulders of size 150 mm to 225 mm in layers not exceeding 225 mm thick including hand packing with small stone chips and binding materials (gravel or moorum) including watering and compacting with road roller/ hand rammer as per direction of Engineer-in-charge. (Nothing extra to be paid for packing the voids and making surface levelled) |
| 13 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :a) 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 14 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work;usingcoarse aggregate and fine aggregate derived from natural sources,Portland Pozzolana / Ordinary Portland /Portland Slagcement,admixtures in recommended proportions as per IS: 9103 to accelerate /retard setting of concrete, to improve durability andworkability without impairing strength; including pumping of concrete to site of laying, curing,carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge;for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. a) All works upto plinth level -Concrete of M25 grade withminimum cement content of 350 kg /cum |
| 15 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.a) Thermo- echanically Treated bars of grade Fe-500D or more. |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form work for :(a) Foundations, footings, bases of columns, etc. for mass concrete |
| 17 | Centering and shuttering including strutting, propping etc. and removal of form work for :b) Walls (any thickness) including attached pilasters, butteresses,plinth and string courses etc. |
| 18 | Provision of Structural, design for preparation of structural drawings, detailed working drawings (good for Construction) and Structural vetting for footings & RCC structure of culvert. from NIT /IIT. The consultant will also provide working drawings of footing & complete RCC structure work including reinforcement detailing etc complete as per directions of Engineer-in-charge. |