Name of Work:- Forrh; Okz 2025&26 Ds Vurxzr Vkyhiqj [Ksm++K Dkyh Unh Ekxz Ij Lkeku; Ejeer Ds Lkfk Uohuhdj.K Dk Dk;Za
Sl. No.
Item Description
1
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge. Including All Material T&P etc and also Including All Taxes But Excluding GST.
2
Dense Graded Bituminous Macadam Grading-2 - Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
3
Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface cleaned with mechanical broom. (For BC)
4
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects 1- The departmental road roller if spare, shall be made available to the contractor at site @ Rs. 1609.00 per Hour including POL charges, wages of driver and cleaner. If roller is kept idle due to non-availability of material or labour, recovery @ Rs. 12872.00 per day shall be made from contractor’s bill for idle period. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.