| 1 | Dismantling reinforced cement concrete including stacking of material, labour, T&P etc. complete. |
| 2 | Dismantling brick work or stone work and cement concrete incement mortar & including stacking of materialas material. labour, T&P etc. complete. |
| 3 | Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge |
| 4 | Providing & laying C.C. 1:2:4(M-15) with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P ete complete (Per CuM.) |
| 5 | Providing & laying R.C.C. 1:1:2 (M-25) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P ete complete (Per CuM.) |
| 6 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours complete (Per CuM.) |
| 7 | Providing Cement pointing (Flush) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P & labours complete( per SqM.) |
| 8 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete( per SqM.) |
| 9 | Supplying & Laying TMT Steel bar Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/e all cost of material, labour, T&P etc. complete (per M.T.) |
| 10 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete |
| 11 | Providing and laying Thermacol sheet in expention joint including i/e all cost of material, labour, T&P etc. Complete. |
| 12 | Earth work for filling in approch road & strengthening of banks including all lift and all lead with rammimg & dressing, proper i/c all cost of material, labour, T&P etc. complete |
| 13 | Earthwork in removing Diversion/Bandha including al lift and all lead with ramming & dressing.proper i/e all cost of material, labour, T&P ete. Complete |
| 14 | Distempering Two coat with oil bound distemper of approved brand and manufacture and of required shade on undercoated wall surface to give an even shade over an including a priming coat cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paints after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including preparing the surface even with plaster of paris or approved synthetic material and sand papered smoothi/c all cost of material, labour, T&P etc. complete. |
| 15 | Painting letters including cost of material for writing chainage on V.R.B. i/c all cost of material, labour, T&P etc. complete. Please Enable Macros to View BoQ information |