| 1 | Taking down the unserviceable fire pipe and supply and lay M S ERW Pipes heavy grade with all fittings laid in ground,floors or fixed to walls and ceilings etc of sizes 100 MM all as directed. |
| 2 | Taking down the unserviceable fire pipe and supply andfixing Butterfly Valve 100 mm all as directed. |
| 3 | Taking down the unserviceable fire pipe and supply andfixingof fire hydrant landingsingle headedvalve 63 mm diaCI body GM parts heavy utywith necessary arrangement suitable for fixing 80 mm Fire pipe all as specified and directed. |
| 4 | Taking down the unserviceable fire pipe and supply andfixing hose box made of 18 gauge MS Sheet 800mm X 600mm X 250mm with double door with 4 mm thick glasses and door frame made of 16 gauge MS sheet painted fire red out side and brilliant white inside yard all as specified and directed. |
| 5 | Taking down the unserviceable fire pipe and supply andfixing RRL hose type 30 meter length oneboth end male femel socket made with gunmetal suitable for 63mm hydrent valve all as specified and directed. |
| 6 | Taking down the unserviceable fire pipe and supply andfixing Branch pipe gun metal 63mm instantaneous inlet, made threaded outlet, 15mm bore nozzle short all as specified and directed. |
| 7 | Maintanence fire fightingDisel Engine operatedpump of capacity 150 BHP through authorise service agencyatLocation: KINAHI Pump House 1 Nos)Note:- (a)spares required for above maint will be measured and paid separately under relevent items . Scope OfWork :- (a) Engine Cooling System :-Checking of radiator conditions (check for radiator clogging, cooling fins condition, V belts, etc. Checking of K-Cool Super level, piping corrosions & any sign of radiator leaks. Checking of hoses & connections deterioration / wear & tear.Checking of hoses & connections deterioration / wear & tear.Checking of fan pulley mis-alignment / deterioration, defective bearings, corroded surface, grease condition.Checking the water pump leaks, noisy operation, abnormal vibration, impeller defects, cracked housing, worn out shaft, etc Checking of belts tension & deterioration. Checking thermostat for proper functioning. Checking water level sensor in radiator for K-Series Engines .(b) Engine Fuel System :-Checking fuel lines connections (any signs of fuel leak, loose connections, corroded piping, fuel restrictions, defective clamps, deteriorated hose, etc.).Checking governors & controls conditions (any sign of deterioration, loose connections & system malfunction/ not responding etc.).Checking governors & controls conditions (any sign of deterioration, loose connections & system malfunction/ not responding etc.) Checking actuator of electronic governing system.Checking priming pump condition.Checking fuel filter condition – replace the filters as found necessary.Checking water separator condition.Checking fuel tank condition (any sign of water contamination, no water drain, corrosions / deteriorations, etc.Checking exhaust smoke condition to identify health of the engine. |
| 8 | ( c) Engine Lubricating System Inspection :-Checking oil lines connections (any signs of oil leak, loose connections, corroded piping, defective clamps, deteriorated hose, etc.Checking oil pressure condition (any sign of erratic operation, defective gauges, defective pressure sensors, defective wiring harness, etc.Checking oil level & oil quality condition.Checking last oil change & oil filter replacement.Checking make up oil availability at site.(d) Engine Air Induction System :-Checking air filter indicator reading (any sign of defective sensor, erratic operation).Checking air filter (any sign of filter clogging, dirt accumulation, air obstruction, defective seal, damage/ deteriorated housing etc.Checking turbocharger condition (any sign of excessive end play, oil/ gas leak, abnormal operating noise, excessive vibration, overheating etc.)Checking hoses & connections deterioration / wear & tear.Checking Charge Air cooler condition- if any (sign of clogged core/ fins, air leaks at connections, damaged gaskets, etc. (e) Engine Exhaust System :-Checking the exhaust manifold condition (anysign of gas leak, missing bolts and nuts, red hot manifold, oil leak, deterioration etc.Checking the flexible bellow/ hoses & connections deterioration / wear & tear.Checking muffler condition (any sign of support insufficiency, corrosion, drain pipe valve not installed, not shielded, etc).Checking exhaust pipe insulation condition / deterioration.Checking smoke emission quality (any sign of excessive black smoke, bluish smoke, white smoke, restricted gas flow etc. (f) Engine Electrical System :-Checking batteries condition (electrolyte level, distilled water level, defective plate, voltage drop during cranking-refer to manufacturer acceptable voltage drop, etc..),Battery capacity evaluation this can be done by battery discharge test.Replacement of batteries is to be planned.Checking the starting motor condition (any sign of defective solenoid, defective brushes, grounded / shortedconnection, struck up rotor etc.Checking the wiring harness condition (any sign of defects, grounded, loose connections, shorted, open circuit, any deterioration. (g) Generator Control Panel System Inspection :- Checking “start / stop / manual switch condition & functionality.Checking “voltmeter”, “Ammeter”, “frequency “ meter for proper functionality.Checking “voltmeter”, “Ammeter”, “frequency “ meter for proper functionality.Checking “Contactors, ACB for proper functioning /operations.Checking “wiring termination for proper tightness.Checking indicating lamps for proper functioning. Checking if fault/tripping circuits are working satisfactory.Checking if doors are closing properly.Checking if there is no blockage of air from rear ducts.Checking if the front opening is directing the hot air outside room. |
| 9 | All as per above item before but fire fighting Disel Engine operatedpump of capacity 133 BHP Panelthrough authorise service agencyofOEM ,Make- KirloskarLocation: 29 FAD |
| 10 | All as per above item before but fire fightingDisel Engine operatedpump of capacity of 47 BHP Panelthrough authorise service agencyofOEM ,Make- Kirloskar.Location: 29 FAD |
| 11 | Taking down the unserviceable items and supply and fixing the Lub Oil oilfilter for 150/133/47BHP Diesel Engine pump |
| 12 | Taking down the unserviceable items and supply and fixing theFan V-beltfor 150/133/47BHP Diesel Engine pump |
| 13 | Supply and filling Coolent for radiators |
| 14 | Taking down the unserviceableengine oil and Supply and filling in repacement/topping up engine oil multi grade 15w to 40W in engine all as specified and directed. |
| 15 | M&L for repair thefire engine 150BHP Make:- Kirloskar with the following details (a) Check cylinder head for valve leakage/grinding,polishioning the same. (b) Decarbonization of combustion chamber,piston ring grooves. (c )S/F the piston ring complete =01set. (d) S/F Piston pin =1 set (e)S/FCylinder head bolt =1 set (f)S/F Cylinder liner=1 set (g)S/F Inlet valve seat =1 set (h) S/F Exhust valve seat = 1Set (j) S/F Valve guid =1 set (k)S/F all joints,gaskets & O rings=01set. (l)S&F thermostate =01no m) cleaning the cooling system,stainer, diesel tank,engine sump=01job. (n) S&F water pump =01no. (o)S&F Coolent Hose-1set (p)S&F fuel ratio control-01no (q)Reassemble all parts and testing complite all as directed. |
| 16 | M&L for repair thefire engine 130BHP Make:- Kirloskar with the following details (a) Check cylinder head for valve leakage/grinding,polishioning the same. (b) Decarbonization of combustion chamber,piston ring grooves. (c )S/F the piston ring complete =01set. (d) S/F Piston pin =1 set (e)S/FCylinder head bolt =1 set (f)S/F Cylinder liner=1 set (g)S/F Inlet valve seat =1 set (h) S/F Exhust valve seat = 1Set (j) S/F Valve guid =1 set (k)S/F all joints,gaskets & O rings=01set. (l)S&F thermostate =01no m) cleaning the cooling system,stainer, diesel tank,engine sump=01job. (n) S&F water pump =01no. (o)S&F Coolent Hose-1set (p)S&F fuel ratio control-01no (q)Reassemble all parts and testing complite all as directed. |
| 17 | M&L for repair thefire engine 47 BHP Make:- Kirloskar with the following details (a) Check cylinder head for valve leakage/grinding,polishioning the same. (b) Decarbonization of combustion chamber,piston ring grooves. (c )S/F the piston ring complete =01set. (d) S/F Piston pin =1 set (e)S/FCylinder head bolt =1 set (f)S/F Cylinder liner=1 set (g)S/F Inlet valve seat =1 set (h) S/F Exhust valve seat = 1Set (j) S/F Valve guid =1 set (k)S/F all joints,gaskets & O rings=01set. (l)S&F thermostate =01no m) cleaning the cooling system,stainer, diesel tank,engine sump=01job. (n) S&F water pump =01no. (o)S&F Coolent Hose-1set (p)S&F fuel ratio control-01no (q)Reassemble all parts and testing complite all as directed. |
| 18 | M&L for cleaning thoroughly by using wire brush/coconut coir of walls and floor of Semi Under Ground Open Sump (SWT) ofcapacity3.0Lakh Ltr TO 4.5 Lakh ltr at COD Reservoir NO 1and taking out all accumulated silt, foreign materials etc including disposal of materials n.exc. 50mtr as directed and cleaning of chocked pipes etc by applying soda limesolutions with white primer one coat and writing Tank capacity by Paintall as directed. |
| 19 | M&L for cleaning thoroughly by using wire brush/coconut coir of walls and floor of Semi Under Ground Open Sump (SWT) ofcapacity 1.8Lakh Ltr TO 3.0 Lakh ltr at COD Reservoir NO 2 and C2 Pump Houseand taking out all accumulated silt, foreign materials etc including disposal of materials n.exc. 50mtr as directed and cleaning of chocked pipes etc by applying soda limesolutions with white primer one coat and writing Tank capacity by Paint all as directed. |
| 20 | M&L for cleaning thoroughly by using wire brush/coconut coir of walls and floor of Semi Under Ground Open Sump (SWT) ofcapacity0.9Lakh Ltr TO 1.8 Lakh ltr at CODand ODTD SWTand taking out all accumulated silt, foreign materials etc including disposal of materials n.exc. 50mtr as directed and cleaning of chocked pipes etc by applying soda limesolutions with white primer one coat and writing Tank capacity by Paint all as directed. |
| 21 | M&L for cleaning thoroughly by using wire brush/coconut coir of walls and floor of Semi Under Ground Open Sump (SWT) ofcapacity0.5Lakh Ltr TO 0.9 Lakh ltr at CODand ODTD SWTand taking out all accumulated silt, foreign materials etc including disposal of materials n.exc. 50mtr as directed and cleaning of chocked pipes etc by applying soda limesolutions with white primer one coat and writing Tank capacity by Paint all as directed. |
| 22 | Taking up of Existing cast iron water mains (including all fittings)/DI Pipe,with spigot and socket end sand lead joints including burning out joints and recovering lead of water pipe 100 mm dia all as directed...Note: Earthwork will be measured and paid separately |
| 23 | All as per above item before but size of water pipe 150 mm dia all as directed.. |
| 24 | All as per above item before but size of water pipe 200 mm dia all as directed.. |
| 25 | Refixing only of Cast iron pipes with spigot and socket ends s centrifugally cast. Class LA,in any length,laid in trenches of water pipe 100 mm dia all as directed.Note:- cost of jointing and jointing material will be paid separately. |
| 26 | All as per above item before but size of water pipe 150 mm dia all as directed.. |
| 27 | All as per above item before but size of water pipe 200 mm dia all as directed.. |
| 28 | Supply lay connect of water pipe 100 mm dia type DI-K7class in repair with push to lock rubber tighten lock centrifugally in any lengths conforming to IS including DI fittings & lead jointslaid in trenches/ on wall/ on floor at locations all as specified & directed. |
| 29 | All as per above item before but size of water pipe 150 mm dia all as directed.. |
| 30 | Taking up unserviceable CI/DI fittings and supply and fixing any type radius and angletaper any type (Straight) bend increasing decreasing or double socket etc Tee pieces, single branch ‘Y’ junction double branch, coller, capacity and plugs for 100 mm bore to 200 mm bore CI pipe conforming to IS-1538- 1993 complete and all as specified. |
| 31 | Taking up or down the GI Pipe 40/50/80mm size steel galvanized water tubingwith all necessary fittings complete from walls / floor or trenchesall as directed. |
| 32 | Cleaning,washing,desallingthe of water pipe 40/50 mm diaserviceable GI pipe .Refixing/re-layingin same icluding necessary fitting/ fixture in same tranchesor new location all as directed |
| 33 | All as per above item before but size of water pipe 80 mm dia. |
| 34 | Supply & fixing theof water pipe 40 mm dia ofGI steel tubings of medium grade with all fittings and fixed complete to walls/ ceiling or laid in floorsall as directed. |
| 35 | All as per above item before but size of water pipe 50 mm dia. |
| 36 | All as per above item before but size of water pipe 80 mm dia. |
| 37 | M&L for cutting existing steel tubing for alterations or additionsof pipes size 40/50 mm bore all as directed |
| 38 | M&L for Screwing existing steel tubing for alterations or additionsof pipes size 40/50 mm bore all as directed |
| 39 | Taking up/down the following unserviceblegatevalve of any type any size and Supply and fixing theGate valve of water pipe 40 mm diamade with. Gun-metal,, with iron wheel head, screwed both ends on G.Ipipeswith GI union,all as per directed.. |
| 40 | All as per above item before but size of water pipe 50 mm dia all as directed.. |
| 41 | Taking up unserviceable CI sluicevalve ofany size from existing pipe lineall as directed. |
| 42 | Supply and fixingand replacement ofsluice valve 100 mm diatype PN-1.6 double Flanged cast iron type with brass spindle and iron wheeliron nuts, bolts & washers and rubber insertion sheet conforming to IS specification complete and all as specified. make -Cair/ Kirloskar/ BIR/ UPADHYA. |
| 43 | All as per above item before but size of sluice valve 150 mm dia |
| 44 | Repairof brick massonry valve pit chamber of inner dimension 100x100x100 cms suitable for sluice valves upto 100mm size, with , brick work in cm 1:6 rendering 1:4, 15mm plastering, coping in PCC 1:2:4 type B-1, including MS sheet cover of thickness 2 mm on 50x50x6.0 mm angle iron framework including two coats of synthetic enamelled paint over a coat of red oxide primer with making provision of locking arrangement and removing the debris from the site or as specified and all as directed. |
| 45 | Repairof brick massonry valve pit chamber of inner dimension 120x120x120 cms suitable for sluice valves upto 100mm size, with , brick work in cm 1:6 rendering 1:4, 15mm plastering, coping in PCC 1:2:4 type B-1, including MS sheet cover of thickness 2 mm on 50x50x6.0 mm angle iron framework including two coats of synthetic enamelled paint over a coat of red oxide primer with making provision of locking arrangement and removing the debris from the site or as specified and all as directed. |
| 46 | Repairof brick massonry valve pit chamber of inner dimension 150x50x150 cms suitable for sluice valves upto 100mm size, with , brick work in cm 1:6 rendering 1:4, 15mm plastering, coping in PCC 1:2:4 type B-1, including MS sheet cover of thickness 2 mm on 50x50x6.0 mm angle iron framework including two coats of synthetic enamelled paint over a coat of red oxide primer with making provision of locking arrangement and removing the debris from the site or as specified and all as directed. |
| 47 | Repair of Defects such as leakage and blockage in CI/DI pipe of size 80 mm to 100 mm including neccesary excavation work upto 6 RM and depth up to 60 cm manually or by JCB (Extractor) and refixing again after cutting and jointing as per site requirement using new CI/DI fittings as required following sizes :- Note :- (a) fittings reqd will be paid in respective items (b) Diffects shoud be rectified within 24 Hrs of intimation oterwised recovery @ of rupees 300 per day will be carried out. |
| 48 | Repair of Defects such as leakage and blockage in CI/DI pipe of size 150 mm to 200 mm including neccesary excavation work upto 6 RM and depth up to 60 cm manually or by JCB (Extractor) and refixing again after cutting and jointing as per site requirement using new CI/DI fittings as required following sizesNote :- (a) fittings reqd will be paid in respective items (b) Diffects shoud be rectified within 24 Hrs of intimation oterwised recovery @ of rupees 300 per day will be carried out. |
| 49 | Taking down unserviceable fire alarm,Supply and installed commissioning and testing Fire aarm control panel complying with BSEN-54 doubleloop panel with 99 detectors and 99modules and upto 200detectors and modules all as directed. |
| 50 | Taking down unserviceable fire detector Supply and installed commissioning and testingsmokedetectors complying with and type certified to EN-45 addressable type smoke detector photoelectric/optical with base with self built intelligence as per IS:11360 all as directed. |
| 51 | Taking down unserviceable fire alarm sounder,Supply and installed Fire alarm sounder/siren electronic type horizontal single stage continus normal operation for atlest 50 minutes with sound level 120 DB measured at 1.5 mtr with sound output variation of +5 DB with range 500 mtr all as directed. |
| 52 | Taking down unserviceable fire alarm PVC conduit supply and layingin consil rigid non metallic PVC conduit of size 20 mmexclusive of boxes(Junction/Terminal) but inclusive of all tees,bends,elbows,reducers,bell mouth tube ends and fixing accessories such as couplers,lock nuts,saddles,pipe hooks etc all as directed. |
| 53 | supply and laying with two core PVC insulatedunsheathed stranded copper conductorof size 4 sqmm 1100 volt grade FRLS (nominal area) drawing through PVC consil conduit and connecting from Fire panel to fire alarm/smoke/heat detectorsall as directed |