|
| 1 | Sch \"A\" |
| 2 | Removing/ cleaning of blockage from WC trap of any description and in any position by removing sand/ sludge/ silt and other foreign material deposited in it (either manually or mechanically) upto first manhole and making the sewage system functional complete all as specified and directed. |
| 3 | All as per serial item No. 1 above but from traps of bath rooms/ kitchen sink/ wash hand basin/ urinal point and gully traps complete all as specified and directed. |
| 4 | Removing of blockage/ cleaning of sewage lines 100mm bore laid at a depth upto 1.5m below ground level (either manually or mechanically) by removing all type of sand/ sludge/ silt and any other foreign material deposited in it including manholes and removing the material to a distance n.exc. 50 mcomplete all as specified and directed. |
| 5 | Removing of blockage/ cleaning of sewage lines 150mm bore laid at a depth upto 1.5m below ground level (either manually or mechanically) by removing all type of sand/ sludge/ silt and any other foreign material deposited in it including manholes and removing the material to a distance n.exc. 50 mcomplete all as specified and directed. |
| 6 | All as per serial item No. 4 above but depth of sewage line exc. 1.5 m & n. exc. 3.0 mcomplete all as specified and directed. |
| 7 | Removing of blockage/ cleaning of sewage lines 200mm bore laid at a depth upto 1.5m below ground level (either manually or mechanically) by removing all type of sand/ sludge/ silt and any other foreign material deposited in it including manholes and removing the material to a distance n. exc. 50 mcomplete all as specified and directed. |
| 8 | All as per serial item No. 6 here-in-before but depth of sewage line exc. 1.5 m but n.exc. 3.0mcomplete all as specified and directed. |
| 9 | Removing of blockage/ cleaning of sewage lines 250mm to 300mm bore laid at a depth exc. 1.50m but n.exc. 3.00m below ground level (either manually or mechanically) by removing all type of sand/ sludge/ silt and any other foreign material deposited in it including manholes and removing the material to a distance n. exc. 50 m complete all as specified and directed. |
| 10 | Pumping out/ dewatering of soakage wells, septic tanks etc. of any size and depth by mechanical means i.e. pumping sets etc. and removing the muddy water in liquid or semi-liquid state to a distance exc. 250 metres and n. exc. 500 metrescomplete all as specified and directed. |
| 11 | Desilting/ desludging the septic tanks and soakage wells etc. by manual labour or by mechanical means and removing the sludge in solid state/ semi solid state outside defence landcomplete all as specified and directed.Note for item No 1 to 10 : The contractor shall provide at least two safaiwala with necessary T&P daily at 0900hrs who will report the JE (Civil) and taking complaints and render completion of rectification of complaint by 16:30hrs. |
| 12 | Excavation in trenches n. exc 1.5 metre wide for foundations etc. and not exceeding 1.5 m deep and getting out in soft/ loose soilcomplete all as specified and directed. |
| 13 | Demolition of reinforced cement concrete of any description and in any positioncomplete all as specified and directed. |
| 14 | M&L precast reinforced cement concrete (1:2:4) type B-1 using 20mm graded crushed stone aggregate as in manhole covers and the like set in cement mortar (1:4) duly placed on manholes complete all as specified and directed. |
| 15 | M&L TMT bars 6 to 8mm dia cut to length, bent to shape required including bending, cranking etc and binding with and including MS wire (annealed) not less than 0.9mm dia complete all as specified and directed. |
| 16 | Demolition ofcement concrete (unreinforced ) in ground floors and paving n.exc 15 cm thickness (below or above ground level)complete all as specified and directed. |
| 17 | M&L cement concrete (1:2:4) type B-1 using 20mm graded crushed stone aggregate as in bencing for cover slab, over manholes, bands, copings, bed plates etc incl form work if any and surfacesfinished even & smoothwithout using extra cementcomplete all as specified and directed. |
| 18 | Demolition brickwork built in cement mortar or lime mortar including all quoins, arches, pillars etc but excluding ashlar facing , dressed stone work and precast concrete articles complete all as specified and directed. |
| 19 | M&L for brick work with sub class ‘B’ old size bricks straight or curved on plan exc. 6 m mean radius built in cement mortar (1:4)complete all as specified and directed. |
| 20 | All as per item No. 18 here-in-before but except bricks complete all as specified and directed. (Old serviceable bricks retrieved during demolition shall be re-used after cleaning) |
| 21 | Taking down cement plaster including raking out joints, hacking for key, scrubbing down with water etc. complete all as specified & directed. |
| 22 | M&L, rendering 15mm thick on brick work or concrete surface in cement mortar (1:4) finished even and smooth without using extra cement mixed with liquid water proofing coompoundcomplete all as specified and directed. Note: WPC shall be measured and paid seprately |
| 23 | Demolition and breaking up 150mm bore drain pipes (salt glazed stoneware, AC or reinforced concrete) set in cement mortarcomplete all as specified and directed. |
| 24 | Demolition and breaking up 100mm bore drain pipes (salt glazed stoneware, AC or reinforced concrete) set in cement mortarcomplete all as specified and directed. |
| 25 | Demolition and breaking up 200mm bore drain pipes (salt glazed stoneware, AC or reinforced concrete) set in cement mortarcomplete all as specified and directed. |
| 26 | M&L cement concrete (1:4:8) type D-2 using 40mm graded crushed stone aggregate as in bed to 150mm bore SGSW drain pipes including packing under and haunching against the sides of pipe after they are laid and testedcomplete all as specified and directed. |
| 27 | M&L cement concrete (1:4:8) type D-2 using 40mm graded crushed stone aggregate as in bed to 100mm bore SGSW drain pipes including packing under and haunching against the sides of pipeafter they are laid and testedcomplete all as specified and directed. |
| 28 | M&L cement concrete (1:4:8) type D-2 using 40mm graded crushed stone aggregate as in bed to 200mm bore SGSW drain pipes including packing under and haunching against the sides of pipeafter they are laid and testedcomplete all as specified and directed. |
| 29 | M&L150mm bore reinforced concrete pipe class NP3 laid in trenches includingjointing & testingcomplete with collars complete all as specified and directed. |
| 30 | M&L100mm bore reinforced concrete pipe class NP3 laid in trenches includingjointing & testingcomplete with collarscomplete all as specified and directed. |
| 31 | M&L 200mm bore reinforced concrete pipe class NP3 laid in trenches includingjointing & testingcomplete with collarscomplete all as specified and directed. |
| 32 | M&L for Cutting into existing manholes for connecting new drains pipe of 100mm dia , making good to pipe and rendering, cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B-l smooth finished and reforming benching as requiredcomplete all as specified and directed. |
| 33 | M&L for Cutting into existing manholes for connecting new drains pipe of 150mm dia , making good to pipe and rendering, cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B-l smooth finished, and reforming benching as requiredcomplete all as specified and directed. |
| 34 | M&L for Cutting into existing manholes for connecting new drains pipe of 200mm dia , making good to pipe and rendering, cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B-l smooth finished, and reforming benching as requiredcomplete all as specified and directed. |
| 35 | Returning filling in soil including spreading, levelling, watering and well ramming in layers notexceeding 25cm thickcomplete all as specified and directed. |
| 36 | Removal of excavated surplus soil to a distance n. exc. 50m and depositing where directed at level not exceeding 1.5 m above the starting pointcomplete all as specified and directed. |
| 37 | Supply only integral water proofing compound ISI marked as approvedcomplete all as specified and directed. |
| 38 | M&L for two coats of white wash including preparation of newly plastered surfacescomplete all as specified and directed. |
| 39 | Supply & fixing in repairs 75mm bore PVC (SWR) pipes single socketed, in any length with rubber ring joints, laid in trenches or in floors including taking down existing broken pipecomplete all as specified and directed. |
| 40 | Supply & fixing in repairs 110mm bore PVC (SWR) pipes single socketed, in any length with rubber ring joints, laid in trenches or in floors including taking down existing broken pipecomplete all as specified and directed. |
| 41 | Supply & fixing in repairs 75mm bore PVC (SWR) pipes single socketed, in any length with rubber ring joints,fixed to walls including taking down existing broken pipe complete all as specified and directed. |
| 42 | Supply & fixing in repairs 110mm bore PVC (SWR) pipes single socketed, in any length with rubber ring joints, fixed to walls including taking down existing broken pipe complete all as specified and directed. |
| 43 | S&F in repairs 75mm PVC (SWR) bends any radius complete all as specified and directed. |
| 44 | S&Fin repairs 110mm PVC (SWR) bends any radius complete all as specified and directed. |