| 1 | M&L for Comprehensive maintenance of electrically operated lifts suitable for serving passenger liftsinstalled at Sekhon Vihar Palamof Make ThyssenKrupp Elevators (India) at (Sekhon Vihar) forGround +Ten floors (total Eleven landings) with electric power operated doors, auto electric levelling device of capacity 8 passenger lift installed in bldg Nos (144 to 153)= Total 10 Nos complete all as specified and as directed by Engr-in-charge. |
| 2 | M&L for Comprehensive maintenance of electrically operated lifts suitable for serving passenger liftsinstalled at Sekhon Vihar Palamof Make ThyssenKrupp Elevators (India) at (Sekhon Vihar) forGround +Ten floors (total Eleven landings) with electric power operated doors, auto electric levelling device of capacity 13 passenger lift installed in bldg Nos (144 to 153)= Total 10 Nos complete all as specified and as directed by Engr-in-charge. |
| 3 | Notes for Ser Item No. 1.00 & 2.00: (a) The above maintenance includes complete maintenance of existing M/S Thysann Krupp lifts by regularly and systematically examining, adjusting, fabricating as require for smooth and effcient functioning of the equipment/lift other than regular wear & tear of spares, which shall be considered in quoted rates.Any item that is not included in OEM AMC schedule but required at site for smooth operation of lift (b) The maintenance of lift shall be done through authorised OEMthe tenderer has to submit MOU from authorised OEM alongwith Cover-I of tender and hard copy shall be submitted with application of tender, failing which Cover-II (Financial Bid) of tender shall not be opened. Contractor shall conclude AMC with OEM and copy of the agreement shall be submitted to GE within 07 days of commencement of AMC work, no payment shall be made to contractor without submission of valid AMC agreement and failing of which contract shall be liable to be cancelled. |
| 4 | (c) The contractor/OEM shall provide mechanic and this mechanic shall be available round the clock i.e. 24 hrs for emergency break down attendance and rescue of trapped persons all as directed by Enginr-in-Charge. (e) The contractor shall obtain signature of Authorized sentative of GE and in token of satisfactory completion of defects. (f) Minor/Major defects will be rectified within in the time limit as specified in PS. (g)In case of delay in rectification of any minor/major complaint, a panel recovery @ 2000 per day.shall be imposed as specified in particular specificiation. |
| 5 | Following repairs are deemed to be included in the rates quoted by the contractor under comprehensive maintenance(a) CAR CABIN(i) Repairs/replacement of acrylic roof cover.(ii) Contractor is responsible for maintaining the car cabin neat and clean. Necessary cleaning to car cabin shall be done by the contractor on daily basis(b) CONTROLLER(i) Checking fuses of controller and mains, replace if any found defective.(ii) Checking the conditon of brake coiland replacement if required.(iii) Checking flexible leads to relays to make them serviceable.(c) AC Motor(i) Lubricate bearings with suitable lubricants.(ii) Clean ventilation passages on weekly basis. |
| 6 | (iii) Carryout the insulation test and continuity test of motor on quarterly basis and make them in satisfactory condition.(iv) Checking the alignment of motor shaft and realigment of shaft(d) Governor(i) Lubricate bearing on weekly basis with suitable lubricants.(ii) Checking that the levers work smoothly(iii)Checking that electrical contactopens before rope get locked(e) Ropes(i) Checking the condition of hoist and governor ropes(ii) Lubricate rope in case of non self lubricating ropes on weekly basis.(iii) Checking the dia of rope and record in maintenance book on quarterly basis for its proper functioning.(f) Hoist Way |
| 7 | (i) Lubricate guides and guide shoes on weekly basis with suitbale lubricants.(ii) Checking that the bufffers are in proper, position measurement and record counter weight buffer cleans with car at the top(iii) Checking the rope fastening at the car and counter weight(iv)Checking guide clamps and adjusted(v) Checking to upper and lower limit switches for proper connection after physical inspection get the lift to over travel by holding from the controller and see that the switches operate properly(vi) Checking condition of travelling cables and termination at junction boxes(g) Machine Room(i) Checking and adjusting of overload relay and phase failure relay |
| 8 | (ii) Checking power wiring termination in switch motor controller and power switching relays (iii) Checking/ lubrication of all equipment on weekly basis(iv) Cleaning the machine room on daily basis(v) Cleaning the relay contacts, replacement of contact(h) Gear Box(i) Inspect for stray noises .(ii) Checking axial play of work shaft .(iii) Lubricate bearing and top up oil in gear box when its required.(j) Brakes(I) Cleaning of oil surface and trace source of oil leakage and rectify the leakage problems.(ii) Adjust clearance between shoes and drum on monthly basis(k) Retiring Car and Locks |
| 9 | (i) Checking operation of car and lock from the top at each landing checking that retiring car solenoid is not getting a over heated and that movement of car is smooth.(ii) Checking that all locks are functioning properly, mechanically and electrically after opening the covers, checking all set screwsand springs and replace if necessary. The lever should lock the brake properly.(iii) Checking that the retiring car does not touch the lock roller at the landing which is being passed .(iv) Checking the door closer safety, clean and adjust if necessary .(v) Checking the car gear switch operates properly .(vi) Lubricate top track and door motor and linkage. |
| 10 | (vii) Checking the landing door and can be operated by emergency keys .(viii) Repair/replacement of retiring car solenoid locks doors closer safety switch .(l) General(i) Checking the car frame for bends or cracks and correct if required.(ii) Checking and carrying out insulation resistance test half yearly basis for the follwing :-(a) All power circuit cables and incoming cables. (b) Switch and feed controller (c) Between different power relays.(d) Power card in the traveling cables (e) Motor(iii) Checking operation of the car over speed safety gear by moving the levers manually landing so that the safety locks up properly. |
| 11 | (iv) Checking that sheaves are tight on the shaft also checking with hammer sounding for cracks, check sheave bearing clean and re-lubricate. Adjust for proper axial play.(v) Unload car (s)checking the worn gear lash and adjust by removal of sheaves as required.(vi) Checking of motor bearing, clean and lubricant(vii) Checking that the gear coupling belts are tight(viii) Checking oil seals of gear box and fill fresh oil |
| 12 | (ix) Contractor is responsible for maintenance of lift well/pit /shaft/machine room in dry and clean condition at all times. Any entry of water needs to be pumped immediately and rates quoted is inclusive of necessary pumping arrangement.A pump should be kept in store at all time to meet the emergency. No extra payment will be done in this account. Failing Rs 10000/- recovered as penality per failure due to above reason(x) Remove brake shoes clean and refit or replace brake linings inspect pins springs clean and reassemble. Checking that brake drum is not scored or worn unevenly. |
| 13 | (m)The following component Replacement are deemed to be included in the rates quoted by the contractor under comprehensive maintenance against item Srl No 1.00 & 2.00 : |
| 14 | (i) Contractor is responsible for repair/replacement of following coponents :-Motors, generators, ropes, invertor systems, controller parts to be incusive of printed circuit boards, Sub componens inclusive of belts, gears, bearings, solenoids, coils, chocks brake shoes, liners, contacts, contactors, relays, push bottons, firemen switches, door operator VVVF drive, car door safety device limit switches, governors, hoistway door locks,controller, handrails, handrail drive, steps and step chains,sub components belts, steps rollers, handrail bearing, safety switches, magnetic switches, combs,Landing operating panel (LOP),Door Motor, Door Sensor and Door Welding shall also be included for repair or replacementcomplete all as specified anddirected by GE. |
| 15 | M & L for removal of dust, stains, marks, scratches on the stainless steel surface of car cabin including ceiling, landing doors, car doors and carry out the scrubbing, polishing & buffing of stainless steel surface with the help of stainless steel polish liquid and buffing tool to give the glossy and clean finish to lift cabinssurfaces of 08 passenger lift complete all as specified and as directed. |
| 16 | M & L for removal of dust, stains, marks, scratches on the stainless steel surface of car cabin including ceiling, landing doors, car doors and carry out the scrubbing, polishing & buffing of stainless steel surface with the help of stainless steel polish liquid and buffing tool to give the glossy and clean finish to lift cabinssurfaces of 13 passenger lift complete all as specified and as directed. |
| 17 | M & L forfixing hand rails of 40 mm dia stainless steel, 304 medium grade pipe with necessary fittings screwing forpassenger/goodslifts including taking down old unserviceable hand rails complete all as specified and as directed. (Make of Steel:- Jindal Steel/ Tata Steel / Sail) |
| 18 | M &L for replacementof brokentransparent window glass of size 105 x 45 x 3mm thick in Machine room windows including cutting in existing size and fixing with glass putty as per site requirement complete all as specified and as directed. |
| 19 | M &L for waterproofing and rehabilitation of lift pit by proper cleaning/removing the plaster of pit walls and applying waterproofing materials complete all as specified and as directed. Pit water proofing includes following steps :-(i) Cleaning of lift Pit with wire brush/washing.(ii) Fixing of 10mm dia Aqua TP grouting nipple upto 75mm depth by drilling with 12mm bore hole & fixing in cement mortar @2/Sqm.(iii) Grouting Dr Miracle SS(or equivalent) @ 25 Kg/Sqm average grout prepared by mixing Dr Miracle SS/WAC powder with water and 2% Dr Miracle Retromer (Part\"B\") (or equivalent) by grouting Pump @ 10 to 12 Kg/cm2 pressure(iv) Removal of nipple and making Fair & fine by using two coats of Aqua bond and Dr Miracle Part 2powder (or equivalent) @ 4Kg/Sqm (1.5 Kg Aqua bond: 2.5 kg Dr Miracle Part 2) with MRP glass cloth 40 GSM(v) Kota stone 20mm thick should be fixed after water proofing on floor of pit and side walls upto height 1.20 meter. |
| 20 | Taking down ,supply and fixing in replacement ofexisting lift cabin cross flow fan 22W,220 volt50Hz,rated CFM 4.5 + 0.5 cubic meter per minute suitable for Thyssen Krupp make lift including all fixing arrangementsas per site requirement complete all as specified and as directed. (As per OEM Recommendation) |
| 21 | Supply & fixing in replacement of unserviceable aluminium car door sill So/2 K200 Dw800 L 1240 as per sample suitable for 08 passengerlifts of makeThyssenKrupp including taking down old uncerviceable car door Sill complete all as specified and as directed. (Make : As per OEM Recommended) |
| 22 | Supply & fixing in replacement of unserviceable aluminium Landing door sill Co/2 Dw800 L1640 AL S200as per sample suitable for 08 passengerlifts of makeThyssenKrupp including taking down old uncerviceable landing door Sill complete all as specified and as directed. (Make : As per OEM Recommended) |
| 23 | Supply & fixing aluminium car door sill So/2 K200 Dw900 L 1390as per sample suitable for 13 passengerlifts of makeThyssenKrupp including taking down old uncerviceable car door Sill complete all as specified and as directed. (Make : As per OEM Recommended) |
| 24 | Supply & fixing aluminium Landing door sill Co/2 Dw900 L1840 AL S200as per sample suitable for 13 passengerlifts of make ThyssenKrupp including taking down old uncerviceable landing door Sill complete all as specified and as directed. (Make : As per OEM Recommended) |
| 25 | Dismantaling/Taking down old unserviceable landing door and Supply, fixing, commissioning and testing of complete Landing/Car door, SS hairline finish metal sheet , minimum 1.5 mmthickness ( as per OEM) SS sheet standard 304 and scratch resistance including complete door header assembly (i.e door hanger roller) and landing sill suitable for 08 Passenger lift (make of liftM/s ThyssenKrupp Elevators India Pvt. Ltd.) width of centre opening 800 mm, height of opening 2000mm, two way centre opening, with gate lock, door shoe and other all fittings as per site requirement complete all as specified and as directed. (Make:- As per OEMrecomendation)NOTE:- (i) Rate quoted by the contractor are deemed to be inclusive of minor spares such as gate lock, door rollers, skates, door shoe, door rope, etc. and any other civil work required at site for taking out old door assembly and fixing new door assembly and making good disturbed surfaces complete as per direction. (ii) Any damage done by the contractor shall be replaced with same make and model of the door sensor while taking down and rectify the same free of cost by the contractor.) |
| 26 | Dismantaling/Taking down old unserviceable landing door and Supply, fixing, commissioning and testing of complete Landing/Car door, SS hairline finish metal sheet, minimum 1.5 mmthickness ( as per OEM) SS sheet standard 304 and scratch resistance including complete door header assembly (i.e door hanger roller) and landing sill suitable for 13 Passenger lift (make of lift - M/s ThyssenKrupp Elevators India Pvt. Ltd) width of centre opening 900 mm, height of opening 2000mm, two way centre opening, with gate lock, door shoe and other all fittings as per site requirement complete all as specified and as directed. (Make:- As per OEMrecomendation)NOTE:- (i) Rate quoted by the contractor are deemed to be inclusive of minor spares such as gate lock, door rollers, skates, door shoe, door rope, etc. and any other civil work required at site for taking out old door assembly and fixing new door assembly and making good disturbed surfaces complete as per direction. (ii) Any damage done by the contractor shall be replaced with same make and model of the door sensor while taking down and rectify the same free of cost by the contractor.) |
| 27 | Taking down old unserviceable lift fire man switch and supply& fixing of Elevator fire manswitch boxas per sample for ThyssenKrupp make lifts with all accesseries for 8/13 passenger lift complete all as specified and as directed. (Make:- As per OEM recommendation). |
| 28 | Taking down old unserviceable/ broken LOP and supply& fixing in replacement of LOP as per sample for ThyssenKrupp make lifts with all accesseries for 8/13 passenger liftcomplete all as specified and as directed. |
| 29 | Taking down old unserviceable/ broken COP and supply& fixing in replacement of COP as per sample for ThyssenKrupp make lifts along with all accesseries for 8/13 passenger liftcomplete all as specified and as directed. ( Make- As per OEM Recommendation) |
| 30 | Supply and fixing in replacement of 12 volt 18 AH, EP 18-12 type sealedlead acid battery including PVC connectors as per sample and necessary testing complete all as specified and directed by Engr-in-Charge. Make: Exide/Amco/Standard |
| 31 | M&L for inspection and testing of 8/13 passenger lift by an authorized lift inspector followed by submission of examination report. The testing includes smooth functioning of all safety devices and following parameter checks: |
| 32 | (a) Enclosure of hoistwayor lift way(b)Landing gates and cage gate (c)Interlocks on the landing gates and cage gate(d)Other gate fastenings(e)Cage & platform fittings cage guides, buffers, interior of hoist way or lift way.(f)Overrunning devices (g)Suspension ropes or chains and their attachments(h)Safety gear, i.e.Arrangements for preventing fall of platform or cage brakes(j)Brakes(k)Worm or spur gearing (l)Motors and other electrical parts |
| 33 | Comprehensive maintenance of EPABX 2/32 Hindustan make and all the instruments attached to it with all the features of standard exchange including replacement of all spares except body and wiring as required (Make Hindustan) for 12 months. |
| 34 | Comprehensive maintenance of Lift Telephon S/mnet 20 No (Panasonic) complete all as specified and as directed. |
| 35 | Comprehensive maintenance of push button Caller (Beetel) ID Phone – 12 No complete all as specified and as directed. |
| 36 | Comprehensive maintenance of Knone Box 10 Pair – 10 No complete all as specified and as directed. |
| 37 | Knone Box 20 Pair – 2 No complete all as specified and as directed. |
| 38 | Krone Box 50 Pair – 2 No complete all as specified and as directed. |
| 39 | Comprehensive maintenance of Micro Controller based information display of size 500mm x 50mm x 50mm colour structured moon device, having storage capacity of bilingual 25,000 characters (20 No) complete all as specified and as directed. |
| 40 | Supply and fixing in replacement 4 Core 1mm travelling cable complete all as specified and as directed. |
| 41 | Supply and fixing in replacement telephone to Lift Car (Panasonic) complete all as specified and as directed. |
| 42 | Schedule of Credit |