| 1 | Excavation in trenches n.exc 1.5m wide & n.exc 1.5m depth for foundaton etc or for shafts, wells, cesspits, manholes, pier holes etc n.exc 10 sqm on plan and n.exc 1.5 m in depth and getting out in hard and dense soil complete all as specified and directed. |
| 2 | All as per item No. 02 here-in-before but exc 1.5m and n.exc 3.00m in depth, complete all as specified and directed. |
| 3 | Bailing out water from manholes manually or mechanically & taking out foreign material and removing same from MD lands incl taking out manhole covers and replacing manhole covers in position on manholes of any size & depth complete all as directed. |
| 4 | Demolition of existing cement concrete (un reinforced) in ground floors and paving n.exc 15cm thickness (below or above ground level) complete all as specified and directed. |
| 5 | M&L for Plain cement concrete (1:4:8) type D2 (using 40mm graded stone aggregate) in foundations, filling and mass concrete,complete all as specified and directed. |
| 6 | M&L for pre cast cement concrete (1:2:4) type B1 (using 20 mm graded stoneaggregate) as in benching slabs including necessary form work, complete all as specified and directed. |
| 7 | M&L for Plain cement concrete (1:3:6) type C1 (using 20 mm graded stone aggregate) as in coping of manholes complete all as specified and directed. |
| 8 | Demolition of cement concrete (reinforced) of any description and in any position not otherwise specifically provided for complete all as specified and directed. |
| 9 | M&L for Pre-cast Cement Concrete (1:2:4) type B1 (using 20mm graded stone aggregate) as in cover slabs for manholes etc., set in cement mortor (1:4) including mouldings complete all as specified and directed.Note: Reinforcement will be measured and paid separately. |
| 10 | M&L for Mild Steel TMT bars, 10mm dia & over , cut ot length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with wire complete all as specified and directed. |
| 11 | M&L for Mild steel TMT bars, 6 to 8mm diacut ot length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with wire complete all as specified and directed. |
| 12 | Demolition of brick or stone/boulder masonry, built in cement mortar including coping etc., complete all as specified and directed. |
| 13 | M&L for brick work with fly ash bricks, straight or curved on plan to any radius, built in cement mortar 1:4 using old size bricks complete all as specified and directed. |
| 14 | Taking down existing cement plaster in cement mortar on brick/stone masonry walls etc including racking out joints, hacking for key, scrubbing down with water complete all as specified and directed. |
| 15 | M&L rendering 15mm thick on brick work or concrete surfaces in CM 1:4 and finished even and smooth without using extra cement complete all as specified and directed. |
| 16 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick with all kind of soil complete all as specified and directed. |
| 17 | M&L for removing excavated surplus soil n.exc 50m and depositing where directed at a level n.exc 1.5m above the starting point complete all as specified and directed. |
| 18 | M&L for salt glazed stoneware drain pipes 100mm dia bore (Grade \"A\" pipe) laid in trenches and jointed as specified including demolition and breaking of same bore drain pipe complete all as specified and directed. |
| 19 | M&L for salt glazed stoneware drain pipes 150mm dia bore (Grade \"A\" pipe) laid in trenches and jointed as specified incl demolition and breaking of same bore drain pipe complete all as specified and directed. |
| 20 | M&L for salt glazed stoneware drain pipes 200mm dia bore (Grade \"A\" pipe) laid in trenches and jointed as specified incl demolition and breaking of same bore drain pipe complete all as specified and directed. |
| 21 | M&L for concrete bed to drain pipes 100mm dia bore using plain cement concrete (1:3:6) type C2(using 40mm graded stone aggregate) including packing under and haunching against the sides of pipes after they are laid and tested in complete all as specified and directed. |
| 22 | All as per Item No. 21 hereinbefore but 150mm dia bore pipe., complete all as specified and directed. |
| 23 | All as per Item No. 21 hereinbefore but 200mm dia bore pipe., complete all as specified and directed. |
| 24 | M&L for 150mm dia bore reinforced concrete pipes class NP-2 laid and jointed complete with collars laid in trenches and jointed including demolition of existing pipecomplete all as specified and directed. |
| 25 | M&L for 200mm dia bore reinforced concrete pipes class NP-2 laid and jointed complete with collars laid in trenches and jointed including demolition of existing pipecomplete all as specified and directed. |
| 26 | M&L 100mm thick PCC 1:2:4 type B2 (using 40 mm graded aggregate) finished even and smooth with using extra cement for road cutting complete all as specified and directed. |
| 27 | M&L in repairs, salt glazed stone ware gully traps, square or round mouthed, type \"P\" size 150x150mm in repairs complete all as specified and directed. |
| 28 | S & FPVC( SWR ) pipes 75mm dia single socketed , in any lengthwith rubber ring joints as rainwater, soil waste and vent pipe (with all fittings) fixed to wall or laid in trenches including taking down complete all as specified and directed. |
| 29 | S & FPVC( SWR ) pipes 110mm dia single socketed , in any lengthwith rubber ring joints as rainwater, soil waste and vent pipe (with all fittings) fixed to wall or laid in trenches incl taking down complete all as specified and directed. |
| 30 | S&F in repairs 110 mm bore PVC (SWR) bend with oval access doors complete all as specified and directed. |
| 31 | S&F in repairs 75 mm bore PVC (SWR) bend with oval access doors complete all as specified and directed. |
| 32 | S&F in repairs 110 mm bore PVC (SWR) bends any radius complete all as specified and directed. |
| 33 | S&F in repairs75mm bore PVC (SWR) bends any radius complete all as specified and directed. |
| 34 | S&F PVC (SWR) junction single (single T) equal or unequal with access door of bore75mm complete all as specified and directed. |
| 35 | S&F PVC (SWR) junction single (single T) equal or unequal with access door of bore110mm complete all as specified and directed. |
| 36 | M&L walling of random rubble, uncoursed, will bonded, bedded and solidly hearted build in CM 1:6 Secunderabad type complete all as specified and directed. |