| 1 | CC ROAD |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 3 | excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete |
| 4 | Providing, laying, spreading and compacting stone aggregates of specific sizes to Water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of course aggregate, watering and compacting to the reqiured density Grading 3 as per MORD Technical Specification Clause 405 |
| 5 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from naturalsources : 8 graded stone aggregate 40 mm nominal sizederived from natural sources) |
| 6 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, |
| 7 | Earth work in excavation in foundation in kankar and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge into a distance pickaxes, subbals etc. |
| 8 | Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand. |
| 9 | Concrete with 4cm(1½\") gauge stone ballast, coarse sand of 1.25 Fineness modulous and cement in propotion of 8:4:1 in foundations and under floors, including supply of all materials, labour and T&P etc. Required for proper completion |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: |
| 11 | 12 mm cement plaster finished with a floating coat of neat cement of mix : |
| 12 | Providing and Fixing Sign Board Please Enable Macros to View BoQ information |