| 1 | REPAIRS TO EXISTING 30,000 LITRES OHT @ SERVILAGAM PT |
| 2 | Chipping the existing damages concrete portion For Roof slab Deduction for manhole cover |
| 3 | Earthwork exacavation around column D/F Existing Coloumn |
| 4 | PCC 1:4:8 for foundation D/F Existing Coloumn |
| 5 | Supply and fabrication of steel for skin reinf. |
| 6 | Supply and erecting of centering for size of column |
| 7 | RCC 1:1.5:3 mix using IRC graded metal for column strengthing |
| 8 | Painting two coatsto the exposed surface of SR using Emulsion paint |
| 9 | Towards cost of 65mm dia GI pipe |
| 10 | GI Coupling |
| 11 | GI flange set |
| 12 | GI bend 65 mm dia |
| 13 | Provision for MANUAL COVER AND LADDER LOCK |
| 14 | Provision for Scafolding work |
| 15 | Provision for Sock pit Arrangments |
| 16 | Labour welfare fund @ 1.0% |
| 17 | Name board and Photo charges |
| 18 | REPAIRS TO PU ELE SCHOOL RCC BUILDING @KARANADHAL IN ILLODU PT |
| 19 | Cost and Supply of STEEL GATE 1.50X2.10 |
| 20 | Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete. |
| 21 | Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete. |
| 22 | Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete. |
| 23 | Re Painting old wood work with one coat of best synthetic enamel paint of approved quality, colour including ordinary scrapping and preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, finishing neatly etc., complete complying with standard specification and as directed by the Departmental Officer. |
| 24 | Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete. |
| 25 | Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend. |
| 26 | Electrification arrangements |
| 27 | Provision for Bala painting |
| 28 | Repairs to Doors and Windows |
| 29 | Labour welfare fund @ 1.0% |
| 30 | Name board |
| 31 | Photo charges |
| 32 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |