| 1 | Strengthening the road from Kolukattaikudi Road @ Thuraikudi Panchayat KM-0/0-1/000 (R-73),manikandam Block,pkg05Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m |
| 2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. |
| 3 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A |
| 4 | Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc., |
| 5 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 6 | Providing and laying Primer Coat over the WMM surface using 7.00 Kg of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor\"s bill at the rates specified in the special condition appended herewith including conveyance of bitumen from \"section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications. |
| 7 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.50 Kg of bitumen emulsion RS-1 of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor\"s bill at the rates specified in the special condition appended herewith including conveyance of bitumen from \"section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications. |
| 8 | Providing and laying 50mm consolidated thick Bituminous Macadam using 0.20cum fo 26.50-13.20mm,0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRCmetal with 37Kgs of bitumen for pre mixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant20-30 ton capacity , conveying the mix by tipper trucks top a versite, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by8-10tonne Vibratory/ Pneumatic Roller to the required density etc.,including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 to CMP with bitumen boiler, tipper trucks, Paver Finisher/ 9m paver finisher,Vibratory/Pneumatic roller and all other tools and plant required ,including fuel and all other incidental charges etc., complete as per specification |
| 9 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 |
| 10 | Construction of 3 m RCC Slab culvert CH-0/0-1/100Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc |
| 11 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course |
| 12 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation |
| 13 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure |
| 14 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks |
| 15 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Deckslab |
| 16 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of |
| 17 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of |
| 18 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works |
| 19 | Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab |
| 20 | Providing and fixing Tar Paper for bearing between Bed Block & Deck slab |
| 21 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing |
| 22 | Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, |
| 23 | Providing for HM Stone |
| 24 | Providing for KM stone |
| 25 | Providing for Sign Board |
| 26 | Towards the charges for routlinemaintenance of the road work executedunder NABARD RIDF 26-27 including dressing of bermsby refilling the gully with the earth fromborrow pits, cleaning of wild seasonalgrowth on berms, destilting of side drainsand CD works, white washing guard stones,painting of KM, HM stones, parapets,cutting of branches of trees, refixingdisplaced guard stones, caution boards,speed limit boards etc., with the periodicityfor the above activities as prescribed in IRCSP-20:2002 and as directed by thedepartmental officers except for theconstructional defects which has to berectified by the contractor at his own cost For the First Year from the date ofcompletion of work |
| 27 | For the Second Year from the date ofcompletion of work |
| 28 | For the Third Year from the date ofcompletion of work |
| 29 | For the Fourth Year from the date ofcompletion of work |
| 30 | For the Fifth Year from the date ofcompletion of work |
| 31 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |