| 1 | Strengthening the Rajeshwari kovil Road in Solamadvi Panchayat Km 0/0-1/0 (R-328) .pkg07 Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.uniform layers with tractor on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or directed by the Engineer as per (Mix-in-place method). |
| 2 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A |
| 3 | Picking the existing BT Surface including all charges etc complete.,which will be recovered from the contractor\"s bill at the rates specified in the special condition appended herewith including conveyance of bitumen from \"section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges for cleaning the surface before the application of bitumen binder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as directed by the Engineer incharge and all other incidental charges etc., complete as per clause 505 of most specifications. |
| 4 | Providing and laying spreading and compacting Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor |
| 5 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 6 | Providing and laying Primer Coat over the WMM surface using 7 Kg of Emulsiom bitumenas binder for 10 Sqm. area including cost and conveyance of bitumen which will be supplied departmentally at departmental section store at Union Office and cost of the same which will be recovered from the contractor\"s bill at the rates specified in the special condition appended herewith including conveyance of bitumen from \"section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges for cleaning the surface before the application of bitumen binder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as directed by the Engineer incharge and all other incidental charges etc., complete as per clause 505 of most specifications. |
| 7 | Providing and laying Tack Coat over the Primer surface using 2.50 Kg of Emulsiom bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will be supplied departmentally at departmental section store at Union Office and cost of the same which will be recovered from the contractor\"s bill at the rates specified in the special condition appended herewith including conveyance of bitumen from \"section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour chargesfor cleaning the surface before the application of bitumen binder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as directed by the Engineer incharge and all other incidental charges etc., complete as per clause 505 of most specifications. |
| 8 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 |
| 9 | Providing and Laying gravel soling to compacted thick including cost and conveyance of gravel from approved sources to works site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. |
| 10 | Provision for Road Marker/ Road stud with lens Reflector including all charges etc complete., |
| 11 | Provision for KM Stone |
| 12 | Provision for HM Stone |
| 13 | Provision for Sign Board |
| 14 | Towards the charges for routlinemaintenance of the road work executedunder NABARD including dressing of bermsby refilling the gully with the earth fromborrow pits, cleaning of wild seasonalgrowth on berms, destilting of side drainsand CD works, white washing guard stones,painting of KM, HM stones, parapets,cutting of branches of trees, refixingdisplaced guard stones, caution boards,speed limit boards etc., with the periodicityfor the above activities as prescribed in IRCSP-20:2002 and as directed by thedepartmental officers except for theconstructional defects which has to berectified by the contractor at his own cost For the First Year from the date ofcompletion of work |
| 15 | For the Second Year from the date ofcompletion of work |
| 16 | For the Third Year from the date ofcompletion of work |
| 17 | For the Fourth Year from the date ofcompletion of work |
| 18 | For the Fifth Year from the date ofcompletion of work |
| 19 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |