|
| 1 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound |
| 2 | Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolid |
| 3 | RCC 1:1.5:3 (One Cement, one and half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers |
| 4 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting us |
| 5 | Brick work in following Cement Mortar using best quality II class table moulded chamber burnt bricks of size 9\" x 4-1/2\" x 3\" for foundation and basement including curing, etc., complete complying with standard specification. |
| 6 | Fabricating, supplying and erecting special type iron Truss made up of Rectangular hallow tube of 75 x 40 x 6 mm as longitudinal and cross rafters and 40x40x4mm as purlinn clit plate are provided on trus top at an appropiriated places . necessary holes are provided in the angle for connecting the vertical post. the special type truss may be erected on face of the vertical post in correct alignment of position used with hydralic power crane of including cost of heavy type bolt, nut washers etc complete And including cutting, drilling, Grinding, power consumption charges etc., complete the iron membrs are painted with one coat of anticorrosive sincromate primer and two coat of best enamel paint, loading and unloading transportation charges and any other incidental charges etc., complete. |
| 7 | Roofing with Galvanised Coruugated Colour Metal Sheet of 1.60mm thickness including labour charges for fixing in position including cost and conveyance of all materials and other incidential charges etc.,complete with std specification. |
| 8 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers. |
| 9 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three sand) 20mm thick and pointed with white cement mixed with colouring pigmen |
| 10 | Supplying and fixing Stainless steel hand rail using 50mm pipe and supported with 32mm ss pipe and spaced with 25mm ss pipe of equal span including cost and conveyance of all material and all labour charges etc complete. |
| 11 | Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all Wall area including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 12 | Provision for citizen board |
| 13 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |