Dismantling, clear away and carefully stacking the material useful for re-use for RCC work including all abour and other incidental charges etc complete.(PWD SOR Page no 31 SL no 35 Item no 38).
2
Dismantling, clear away and carefully stacking the material useful for re-use for RR Masonry work including all abour and other incidental charges etc complete.(PWD SOR Page no 30 SL no 16 Item no 15).
3
Earth work excavation and depositingon bank with all lead andlift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, hard gravellyetc except sand and rock requiring blasting all incidental charges etc complete for Box cutting/ foundation asper SS 20B
4
Filling in foundation and basement with sand including cost and conveyanceof sand and all labour charges for filling ,tamping ramming etc., complete.
5
Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
6
CC 1:2:4 using 40 mm metal including cost and conveyance of all materials to site and including curing and other labour charges etc.,
7
CC 1:2:4 using 20 mm metal including cost and conveyance of all materials to site and including curing and other labour charges etc.,
8
Rcc 1:1.5:3 using 20 mm ISS metal including cost and conveyance of material to site and all labour charges are mixing and laying concrete (excluding steel, centering charges) etc., complete.
9
Supply and fabrication of steel for RCC works including cost and conveyance of material to site and all labour charges etc., complete.
10
Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete
11
Centering and Shuttering charges for Rcc works inclusing cost and conveyance of materials to site and all labour charges etc., complete
12
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.