| 1 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification . for Foundations SS 20B TNDSS NO. 23 &24 V, VI (S2) VI 9 |
| 2 | supply and filling of Stone dust filling approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complet |
| 3 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means |
| 4 | Supplying & Erecting of steel centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications ..(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). TNDSS NO.86 K, 86 A a)Without strutting Teachers Colony road S.W.Drain |
| 5 | a)Without strutting Culvert |
| 6 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and fourpart of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. |
| 7 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part M. sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.(Using Vibrator) TNDSS NO: 30 V, VI (S3), VII-3. |
| 8 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. |
| 9 | supply and fixting in position of Bitumen Pad for Expantion Joints including cost and conveyance of materials to site and all labour charges etc,.Complete. Please Enable Macros to View BoQ information |