| 1 | Detail of Work |
| 2 | Safely cartage of STP 13 Mtr. Long from ESC, SRE to the site of work including loading unloading at both ends. (Dist. up to 30 KM.) |
| 3 | Safely cartage of STP 11 Mtr. Long from ESC, SRE to the site of work including loading unloading at both ends. (Dist. up to 30 KM.) |
| 4 | Safely cartage of PCC Pole 8.5 Mtr. Long from ESC, SRE to the site of work including loading unloading at both ends. (Dist. up to 30 KM.) |
| 5 | Erection of single support on PCC Pole /STP up to 13/11/9/8.5 Mtr Long with complete fitting of all accessories of 11 KV/LT as per RESPO specification |
| 6 | Safely carriage of Line Material ESC SRE to site of works through privet vehicle including loading and unloading at both ends. (Distance 0 to 30 K.M.) |
| 7 | Safely Carriage of 11 KV VCB for O/G CTR 200/100/5A, 350MVA from ESC SRE to Site of work including loading and unloading at both ends. |
| 8 | Safely carriage of LT ABC Cable size 3x50/3x95/3x120 from ESC SRE to Site of work including loading and unloading at both ends. |
| 9 | Safely carriage of Weasel Conductor from ESC SRE to Site of work including loading and unloading at both ends. |
| 10 | Safely carriage of Rabbit Conductor from ESC SRE to Site of work including loading and unloading at both ends. |
| 11 | Safely carriage of Dog Conductor from ESC SRE to Site of work including loading and unloading at both ends. |
| 12 | Safely carriage of LT XLPE Cable AL 3.5x150/3.5x240/1x240/1x400/1x630 from ESC SRE to Site of work including loading and unloading at both ends. |
| 13 | Providing and fixing of Different size LT Lug brass |
| 14 | Safely Installation of O/G & I/C VCB and connection properly. |
| 15 | Safely carriage of T/F oil drums ESC SRE to site of work and Pouring of T/F oil from T/F for topping up the level of oil in the T/Fs (500 Ltr) |
| 16 | Grouting of Pole |
| 17 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Weasel Conductor for 11 KV/LT Line as per RESPO specification including complete. |
| 18 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Rabbit Conductor for 11 KV/LT Line as per RESPO specification including complete. |
| 19 | Laying, lifting, Stringing, sagging jumpring & binding of ACSR Dog Conductor for 11 KV/LT/33KV Line as per RESPO specification including complete. |
| 20 | Laying of LT XLPE cable AL 3.5x150/3.5x240/1x240/1x400/1x630 Sqmm and connection properly. |
| 21 | Laying, lifting, Stringing, sagging jumpring & binding of ABC Cable Size 3x50/3x95/3x120 for 11 KV/LT Line as per RESPO specification including complete. |
| 22 | Grouting and Fixing of stay rods by digging of pits in block of 600X600X300 mm. & with new brick and nozzling of stay wire 7/10 SWG and fitting the same on the pole |
| 23 | Safely Fixing of 11 KV Xarm |
| 24 | Safely fixing of 33 KV Xarm |
| 25 | Fabrication and Erection of Double pole on PCC/ST Pole 8.5/11/13 Mtr. Long with complete fitting of all accessories of 11kv/ LT line as per RESPO Specification. |
| 26 | Making and Filling the 11 KV cable jointing kit indoor/outdoor type size 3x120/3x185 Sqmm. sq.mm as per RESPO specification. |
| 27 | Making and Filling the 33 KV cable jointing kit indoor/outdoor type 3x300 Sqmm. sq.mm as per RESPO specification. |
| 28 | Cutting of Tree Branches toungh the lines |
| 29 | Re-straightening of tilted pole |
| 30 | Re-straightening of tilted X-arm |
| 31 | Safely removal of 11 KV VCB O/G (Copper Bus Bar, Energy Meter, Vaccume interrupter & VCB Troly outer troly Box circuit breaker Troly. |
| 32 | Safely removal of 11 KV VCB O/G Copper Scrap 10Kg/VCB |
| 33 | Safely dismantle and carriage of STP SP-70 13 Mtr from site to ESC SRE including loading an d unloading at both ends |
| 34 | Safely dismantle and carriage of STP 11M SP-55 from site to ESC SRE including loading an d unloading at both ends |
| 35 | Safely Remaoval of ACSR Weasal/Rabbit/Dog Conductor scrape and carriage site to ESC SRE including loading and unloading at both ends. |
| 36 | Safely Removal of old and damaged LT ABC Cable (3x50/3x95/3x120) from site to ESC SRE including loading and unloading at both ends. |
| 37 | Safely Removal of old and damaged LT XLPE cable AL 3.5x150(200 Mtr) /3.5x240 (200 mtr) from site to ESC SRE including loading and unloading at both ends. |
| 38 | Safely Removal of old and damaged LT XLPE cable AL 1x240/1x400/1x630 Sqmm from site to ESC SRE including loading and unloading at both ends |
| 39 | Safely removal and carriage of old and damaged 11 KV Xarm from site to ESC SRE including loading and unloading at both ends |
| 40 | Safely removal and carriage of old and damaged 33 KV Xarm from site to ESC SRE including loading and unloading at both ends Please Enable Macros to View BoQ information |